Guidance to determine the minimum amount of Third Party Liability (TP) Insurance coverage
Faso tobe considered
"TPL Minimum coverage amount
indicator:
Prony to puble
2. site within a highly populated and trafficked
ey eente?
2. xistng Property
2. Does existing ult information ndeate a
large wolume of services within or adjacent to
these?
b. stherea sigrifcant OG gas main effecting the
wos?
Are we operating adjacent tor around 3
deepsea outfall?
4. Are you potentially gong to undermine the
foundations ofa popular hate?
3. Nature of work
2. Are we laying routine drainage pipework
(open cut} or are we micro tunneling under
esting property
b. Are we constructing using a series of tower
4, Duration & Value
‘2. Short periods of time limit our potential to
Impact hia partes
Higher valu projects potentiay produce a
{reste volume of wor/spend per month as
they may be working on various sections at
any onetime
‘GARE 500 000.00
‘ky centres and populated areas
adjacent 0 high rise structures
adjacent signlficant uty ~ pressurised
carbonate hardness (KH) water mains, 6 Gas
Adjacent tor around a deep sea outfall
laying routine drainage pipework (open cu) or
are we micro tunneling under existing property
Using series of tower crane
piBith exposure to public
Contract Cost GAR >200milion
‘GATT 300/050
Thiam exposure to publ
urban areas
(Contract Cost QAR 50-200milion
‘GARTE 250,000.00
Ruralbeser operations
Routine work
Short durations
Contract Cost QAR