The foundation kits is supplied flat packed and consists of the steel works as below.
It will need to be assembled within the rebar cage and securely tied off.
The blocks are positioned in line with a separation distance of 15m centre to centre.
SD6 15m Gin Pole Tower
Pad Foundation Assembly Details
Reinforcing details. Approx 522kgs – main cage.
SD6 15m Gin Pole Tower
Pad Foundation Assembly Details
Concrete cover to reinforcement to be minimum 50mm top and 75mm bottom and sides.
Stud Protrusions.
Please ensure the studs are set as below.
Ensure the steel work is level and secure before concrete is poured.
M20 STUD – 130mm +/-10mm M30 STUDS – 190mm + 10mm – 0mm
SD6 15m Gin Pole Tower
Pad Foundation Assembly Details
Considerations must be made for anchor point position and the fall of the
tower which is away from anchor point position. The turbine will fall 15m
away from tower hinge point and the head will be approximately 30m away
from the anchor block.