QUALITY MANAGEMENT SYSTEM Ref. No.

: DAN-All-CIVIL /ITP 01
Document Title: Issue: 01 Rev.: 00
INSPECTION & TEST PLAN - CIVIL
Issuing Date : 23/08/2023

Quantum S. INSPECTIONS REMARKS


Reference Acceptance
S# Material/Process Characteristics of Format
Standard Norm Shall be calibrated
Check A B C always on schedule

Survey instrument Calibration


certificate Report R/W H
Calibration Certificate
Preliminary site
survey/Determination
01 SURVEY of bench mark Mark Reference shall be
Plan layout IFC Survey
reference, And Site area fence to prevent
reference DRAWING report disturbances.
verification of any R/H H
installed /
underground
02 Minimum borehole
depth is 10 M Soil
Soil Samples IEEE-81 Submittal Thermal Resistivity
GEOTECHNICAL /Investigation /Thermal Each TES-P- of Ind. Ind. Lab. R/W W shall be 1.2k-m/W.
Resistivity
H
WORK Location 119.10, PTS Lab Report Soil Temperature -
Measurements CL 2.02. Reports 40C. Geotechnical
report provided by
SEC
Excavation, removing Plan Layout PTS RFI/
Replacing unsuitable TCS- Check List Safety warning sign shall
materials. Q113.02, IFC DRAWING S W be installed in all
PTS CL 2.03 excavation work
& 2.04