General Notes

1. All dimensions are in millimeters (mm) (U.N.O)


2. Reactions force are in Kilo-Newton (kN) and Moments in
Kilo-Newton Meter (kNm) units.
3. Bracing reactions should be added to the main frame reactions.
4. Foundations shall be designed for the given reactions as a
minimum.
5. Anchor bolt must be set straight and to the given dimensions and
the projections with a maximum of 5 mm tolerances.
6. Anchor bolt threads must be protected while pouring the
concrete and must be thoroughly cleaned, and the templates are to
be removed after pouring concrete.
7. The concrete edge beam / slab must be square and level to within
5 mm tolerances.
8. The customer / contractor is responsible for locating the building
lines and bench marks at the site.
9. The following are the maximum allowable tolerances for setting
up the anchor bolts.
9.1. ± 2 mm between any two anchor bolts in any
anchor bolt group.
9.2. ± 3 mm between any two adjacent anchor
bolt groups.
9.3. ± 5 mm for the top of anchor bolts.
10. All the anchor bolts must be set perpendicular to the theoretical
bearing surface unless noted otherwise.
11. Anchor bolts shall be set by the owner (or his civil contractor) in
accordance with the "Issued for
Construction" Anchor Bolt setting Plan.
12. Compressive strength of concrete fc' = 25 N/mm2 assumed in
design wherever required.
13. The steel structure, or parts of it, is designed to be structurally
dependent on the concrete structural work. It is the customer's
responsibility to verify the adequacy of the concrete for structural
soundness and strength.
PROJECT
CUSTOMER
BUILDER
DRAWING TITLE
Steel
DSN BY
DRN BY
CKD BY
JOB NUMBER BLDG. DRG. NUMBER SHEET SET CUR. REL. DATE
NUM. REV.
OF

You might also like