3. Extrusion Section
3.1 Introduction
The Extrusion section function is insulate the conductor from the any behind air and
insulate the conductor from the others conductors.
This stage is very important stage in manifactor the cables because the ability of using
this cable mainly depend on the insulation stage.
The Extrusion section made insulation to the L.V. cables and for H.V. cables made in the
C.V. section and this will be described in other chapter.
Extrusion Section
There are types of materials are used in insulation section but the materials which used
to insulation the cable are
1- PVC (polyvinyl chloride)
2- XLPE (Cross Linked Polyethylene)
__________________________________________________________________________________________________________________________________________________
20
Training Report Production Department
__________________________________________________________________________________________________________________________________________________
The material is used for insulation depend on the type of screw which used in insulation,
bedding or sheathing process.
And we will find the different between the materials that we used in this table
Recycling Yes No
Operating
70°C 90°C
Temperature
Density From 1.4 to 1.6 g/cm3 0.92 g/cm3
Cooling The conductor pass cool water Must be pass in hot water 60°C
trough 14°C in cooling system to 10m from cooling system
The material (LLDPE, MDPE and HDPE) are used for sheathing
The material (LSHF and LSOH) are used for insulation
And the recycled PVC is used for bedding (inner covering), if wanted PE for bedding so
used MDPE.
__________________________________________________________________________________________________________________________________________________
21
Training Report Production Department
__________________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________
22
Training Report Production Department
__________________________________________________________________________________________________________________________________________________
1- Tube tooling
T1 inner diameter of tip = C1 (diameter of conductor of pay off X 1.1)
D1 inner diameter of die = T2 outer diameter of T1 X ([3 to 4] thickness of insulation)
2- Pressure tooling
T1 inner diameter of tip = C1 (diameter of conductor of pay off + [0.3 to 0.5] mm)
D1 inner diameter of die = C2 desired diameter after insulation
__________________________________________________________________________________________________________________________________________________
23
Training Report Production Department
__________________________________________________________________________________________________________________________________________________
3.5.1 NMB 80
Processes made : Insulation
Diameter of the cable from 0.5 mm2 to 10 mm2 it's better to run 10 mm2 cable
in the BM 100 because it is too heavy, therefore in general it is preferred to
insulate cables from 1 mm2 to 6 mm2
Materials used in this machine : PVC and XLPE
The next conductors are insulated with this machine: stranded ,flexible and
solid.
Max. line speed 1000 m/min
Spark detector is installed to verify that the insulation has no faults.
Pay off: two units with reel of maximum diameter of 1000 mm and minimum
diameter of 630 mm and maximum weight of 1 Ton.
This machine has no caterpillars instead it is using two cabstands to apply
tension to the conductor.
Take up: two units with reel of maximum diameter of 1000 mm and minimum
diameter of 630 mm and maximum weight of 1 Ton one units is in operation
and the other one is standing by as a backup.
__________________________________________________________________________________________________________________________________________________
24
Training Report Production Department
__________________________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________
25
Training Report Production Department