You are on page 1of 128

RELEASED 05/Jun/2018 16:59:56 GMT

80443864
Revision E
May 2018

X-Series System Automation

Interconnect Guide
EN Interconnect Guide

Save These Instructions


RELEASED 05/Jun/2018 16:59:56 GMT

EN

CONTENTS
SECTION 1 — INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . 4 IR-PCB INTERCONNECT TO INGERSOLL RAND FIRST
GENERATION INTELLISYS “REDEYE” CONTROLLED
X4I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 COMPRESSORS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
X8I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 SSR Redeye (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
SECTION 2 — SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 SSR Redeye FV (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 SSR Redeye SD (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 IR-PCB INTERCONNECT TO INGERSOLL RAND SECOND
MAINTENANCE AND REPAIR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 EDITION INTELLISYS “SE” CONTROLLED COMPRESSORS 30

SECTION 3 — X4I SYSTEM OVERVIEW . . . . . . . . . . . . . . . . . 6 SE UP (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32


SE UP (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
SECTION 4 — X8I SYSTEM OVERVIEW . . . . . . . . . . . . . . . . . 7
SE ESA (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
SECTION 5 — VSD OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . 8
SE ESA (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
SECTION 6 — ASSISTANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
SE DSA (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
SECTION 7 — COMPRESSOR INTERCONNECT
SE DSA (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
DRAWINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
INTELLISYS CONTROLLER E-PROM RECOMMENDATION IR-PCB INTERCONNECT TO INGERSOLL RAND
REFERENCE LIST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 SECOND GENERATION INTELLISYS “SG” CONTROLLED
COMPRESSORS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
INTELLISYS CONTROLLER INTERCONNECT
SG SSR (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
RECOMMENDATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
SG SSR (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
APPENDIX A - IR-485, IRV-485, AND RS485 DIRECT TO
INGERSOLL RAND INTELLISYS, NIRVANA 15-30KW SG Sierra (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
(20-40HP), AND R-SERIES COMPRESSOR SG Sierra (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
INTERCONNECT DRAWINGS . . . . . . . . . . . . . . . . . . . . . . . . . 10
IR-PCB INTERCONNECT TO INGERSOLL RAND NIRVANA
IR-485, IRV-485, AND RS485 DIRECT to Ingersoll Rand INTELLISYS “SGN / SGNE” CONTROLLED COMPRESSORS. 43
Intellisys, Nirvana 15-30kW (20-40hp) and R-Series
Compressors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Nirvana SGN/SGNe (1 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

irV-485 To INTELLISYS SGN / SGNe. . . . . . . . . . . . . . . . . . . . . 11 Nirvana SGN/SGNe (2 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

ir-485 To INTELLISYS SG. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Nirvana SGN/SGNe (3 of 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46

ir-485 To INTELLISYS SE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 SI1 Interface to Redeye, SE, SG Controllers. . . . . . . . . . . 47

ir-485 To INTELLISYS REDEYE. . . . . . . . . . . . . . . . . . . . . . . . . . 14 IR-PCB INTERCONNECT TO INGERSOLL RAND INTELLISYS


S3 CONTROLLED COMPRESSORS. . . . . . . . . . . . . . . . . . . . . . . 48
RS485 To INTELLISYS S3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Intellisys S3 (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
irV-485 To NIRVANA 15-30KW (20-40HP). . . . . . . . . . . . . . . 16
Intellisys S3 (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
RS485 Direct Interconnect To Ingersoll Rand
Xe-70M Controlled Compressors. . . . . . . . . . . . . . . . . . 17 CMC Sierra (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

RS485 Direct Interconnect To Ingersoll Rand CMC Sierra (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52


Xe-90M and Xe-145M Controlled Compressors. . . . 18 ir-PCB to Xe-50M E02 and E03 software . . . . . . . . . . . . . . . . 53

APPENDIX B - ir-PCB TO INGERSOLL RAND INTELLISYS ir-PCB to Xe-50M software E05 or newer . . . . . . . . . . . . . . 54
CONTROLLED COMPRESSOR INTERCONNECT ir-PCB Interconnect for Xe-70M Fixed Speed equipped
DRAWINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 compressors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

IR-PCB INTERCONNECT TO INGERSOLL RAND UNIGY & ir-PCB Interconnect for Xe-90M and Xe-145M Fixed
NIRVANA 20-40 HP COMPRESSORS. . . . . . . . . . . . . . . . . . . . . 19 Speed equipped compressors. . . . . . . . . . . . . . . . . . . . . . . . . . 56

Unigy Phase 1(1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 APPENDIX C -IR-PCB TO INGERSOLL RAND PRESSURE


SWITCH CONTROLLED COMPRESSOR INTERCONNECT
Unigy Phase 1 (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
DRAWINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Unigy Phase 2/3 (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
IR-PCB INTERCONNECT TO INGERSOLL RAND PRESSURE
Unigy Phase 2/3 (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 SWITCH CONTROLLED COMPRESSORS . . . . . . . . . . . . . . . . . . . . . 57

Nirvana 15 –30KW (20 –40HP) (1 of 2). . . . . . . . . . . . . . . . . . . . . 24 SSR UP5 11-22 SD (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

Nirvana 15 -30KW (20-40HP) (2 of 2) . . . . . . . . . . . . . . . . . . . . . . 25 SSR UP5 11-22 SD (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59

SSR UP5 22-37 SD (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

SSR UP5 22-37 SD (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

EN- 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

CONTENTS
SSR UP6 15-30 FV (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 APPENDIX D - IR-PCB TO INGERSOLL RAND
SSR UP6 15-30 FV (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 NON-NIRVANA VSD COMPRESSOR INTERCONNECT
DRAWINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
SSR UP6 15-30 SD (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Wiring The VSD Box To The Ingersoll Rand
SSR UP6 15-30 SD (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Non-Nirvana VSD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103

SSR UP6 40-50 FV (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 IR-302 DISCHARGE (DELIVERY) PRESSURE


SENSOR INTERCONNECT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
SSR UP6 40-50 FV (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
IR-PCB Interconnect To Ingersoll Rand
SSR UP6 40-50 SD (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 Second Generation IntelliSys “SG” Controlled
SSR UP6 40-50 SD (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 Compressors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105

UP6 5-15 FV 1PH 60Hz (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70 Ingersoll Rand Intellisys Controlled VSD


Compressors To VSD Interconnect (1 of 2) . . . . . . . . . . . 106
UP6 5-15 FV 1PH 60Hz (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
VSD Box Interconnect To Ingersoll Rand Intellisys
UP6 5-15 FV 3PH 60Hz (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72 SG Controlled VSD Compressors (2 of 2). . . . . . . . . . . . . . 107

UP6 5-15 FV 3PH 60Hz (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73 IR-PCB INTERCONNECT TO INGERSOLL RAND SECOND


EDITION INTELLISYS “SE” CONTROLLED COMPRESSORS 108
UP6 5-15 SD 3PH 60Hz (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
SE UP (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110
UP6 5-15 SD 3PH 60Hz (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
SE UP (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
UP6 5-15 FV 3PH 50Hz (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
SE ESA (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
UP6 5-15 FV 3PH 50Hz (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
SE ESA (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113
UP6 5-15 SD 3PH 50Hz (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
SE DSA (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
UP6 5-15 SD 3PH 50Hz (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
SE DSA (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 115
SSR M15-22c 20-30HP XF EP HP HXP 50-60Hz (1 of 2). . . . . . . 80
IR-PCB INTERCONNECT TO INGERSOLL RAND PRESSURE
SSR M15-22c 20-30HP XF EP HP HXP 50-60Hz (2 of 2). . . . . . . 81
SWITCH CONTROLLED COMPRESSORS. . . . . . . . . . . . . . . . . 116
M11 -M18.5 (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 Ingersoll Rand Pressure Switch Controlled VSD
M11 -M18.5 (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83 Compressors To VSD Interconnect (1 of 2). . . . . . . . . . . . 117

M37-50 (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84 Ingersoll Rand Pressure Switch Controlled VSD


Compressors To VSD Interconnect (2 of 2). . . . . . . . . . . . 118
M37-50 (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Excessive Pressure Shutdown Switch Example
M55-75 (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86 Before Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 119

M55-75 (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87 Excessive Pressure Shutdown Switch Example


After Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
EP 20-30 ESP FV (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
CMC Sierra (1 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121
EP 20-30 ESP FV (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
CMC Sierra (2 of 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122
EP 20-30 ESP SD (1 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Interconnection of a VSD B Box kit to Xe-M rotary
EP 20-30 ESP SD (2 of 2). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91 fixed speeds with Danfoss external drive. . . . . . . 123
IR-PCB INTERCONNECT TO INGERSOLL RAND SMALL Connection of VSD B-BOX to Fixed Speed Xe-M with
RECIPROCATING AIR COMPRESSORS . . . . . . . . . . . . . . . . . . . 92 IR302 Bolt-On Drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126

UP6RE 7.5–15 175, UP6RX 7.5–15 175 (1 of 3) . . . . . . . . . . . . . . . 93

UP6RE 7.5–15 175, UP6RX 7.5–15 175 (2 of 3) . . . . . . . . . . . . . . . 94

UP6RE 7.5–15 175, UP6RX 7.5–15 175 (3 of 3) . . . . . . . . . . . . . . . 95


Models (231, 7T2, 7T4, 15T2) 3 Phase. . . . . . . . . . . . . . . . . . . . . 96
Models (231, 7T2, 7T4, 15T2) 3 Phase. . . . . . . . . . . . . . . . . . . . . 97

Models 2340, 2475, 2545, 7100, 15T & 3000 (1 of 3) . . . . . . . . 98

Models 2340, 2475, 2545, 7100, 15T & 3000 (2 of 3) . . . . . . . . 99

Models 2340, 2475, 2545, 7100, 15T & 3000 (3 of 3) . . . . . . . 100


Excessive Pressure Shutdown Switch Example
Before Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
Excessive Pressure Shutdown Switch Example
After Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102

80443864 Rev. E EN-


RELEASED 05/Jun/2018 16:59:56 GMT

EN

SECTION 1 — INTRODUCTION
The X - SERIES AUTOMATION is a family of specialized  X8I
controllers designed to provide safe, reliable, and energy-
The X8I is an advanced system controller designed to provide
efficient control of your compressed air system.
safe, reliable, and energy-efficient management of your
 X4I compressed air system. The X8I is capable of controlling
up to eight (8) positive displacement air compressors. The
The X4I is capable of controlling positive displacement air compressors may be fixed speed, variable speed or multi-
compressors. The compressors may have electro-pneumatic step and have electro-pneumatic or microprocessor based
or microprocessor based controls. The X4I is completely controls. The X8I is uniquely configurable and customizable
customizable to meet the specific needs of your compressed to meet the specific needs of some of the most complex
air system. compressed air system. Additionally, the X8I control network
can expand to include monitoring and control of various
compressed air system components.

SECTION 2 — SAFETY
 OPERATION

! WARNING Risk of Danger • The X-Series Automation System must only be operated by
competent personnel under qualified supervision.
• Never remove or tamper with safety devices, guards or
WARNING Risk of Electric Shock insulation materials fitted to the X-Series Automation
System.
WARNING Risk of High Pressure • The X-Series Automation System must only be operated at
! the supply voltage and frequency for which it is designed.
• When main power is switched on, lethal voltages are
WARNING Consult Manual present in the electrical circuits and extreme caution must
be exercised whenever it is necessary to carry out any work
on the unit.
• Before installing or operating the X-Series Automation
System, take time to carefully read all the instructions • Do not open access panels or touch electrical components
contained in this manual, all compressor manuals, and while voltage is applied unless it is necessary for
all manuals of any other peripheral devices that may be measurements, tests or adjustments Such work should
installed or connected to the unit. be carried out only by a qualified electrician equipped
with the correct tools and wearing appropriate protection
• Electricity and compressed air have the potential to cause against electrical hazards.
severe personal injury or property damage.
• All air compressors and/or other equipment connected to
• The operator should use common sense and good working the unit should have a warning sign attached stating “THIS
practices while operating and maintaining this system. All UNIT MAY START WITHOUT WARNING” next to the display
applicable codes should be strictly adhered to. panel.
• Maintenance must be performed by adequately qualified • If an air compressor and/or other equipment connected to
personnel that are equipped with the proper tools. the unit is to be started remotely, attach two warning signs
to the equipment stating “THIS UNIT CAN BE STARTED
 INSTALLATION
REMOTELY”. Attach one sign in a prominent location on
• Installation work must only be carried out by a competent the outside of the equipment, and the other sign inside the
person under qualified supervision. equipment control compartment.
• A fused isolation switch must be fitted between the main
power supply and the X-Series Automation System.
• The X-Series Automation System should be mounted in
such a location as to allow operational and maintenance
access without obstruction or hazard and to allow clear
visibility of indicators at all times.
• If raised platforms are required to provide access to the
X-Series Automation System, they must not interfere with
normal operation or obstruct access. Platforms and stairs
should be of grid or plate construction with safety rails on
all open sides.

EN- 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 MAINTENANCE AND REPAIR • Make sure that all instructions concerning operation and
• Maintenance, repairs or modifications must only be carried maintenance are strictly followed and that the complete
out by competent personnel under qualified supervision. unit, with all accessories and safety devices, is kept in good
working order.
• If replacement parts are required, use only genuine
parts from the original equipment manufacturer, or an • The accuracy of sensor devices must be checked on a
alternative approved source. regular basis. They must be calibrated when acceptable
tolerances are exceeded. Always ensure any pressure
• Carry out the following operations before opening or within the compressed air system is safely vented to
removing any access panels or carrying out any work on atmosphere before attempting to remove or install a
the X-Series Automation System: sensor device.
i. Isolate the X-Series Automation System from the main • The X-Series Automation System must only be cleaned
electrical power supply. Lock the isolator in the “OFF” with a damp cloth, using mild detergents if necessary.
position and remove the fuses. Avoid the use of any substances containing corrosive acids
ii. Attach labels to the isolator switch and to the unit stating or alkalis.
“WORK IN PROGRESS - DO NOT APPLY VOLTAGE”. Do • Do not paint the control faceplate or obscure any
not switch on electrical power or attempt to start the indicators, controls, instructions or warnings.
X-Series Automation System if such a warning label is
attached.

80443864 Rev. E EN-


RELEASED 05/Jun/2018 16:59:56 GMT

EN

SECTION 3 — X4I SYSTEM OVERVIEW


It is recommended that installation and commissioning be carried out by an authorized and trained product supplier.
Ingersoll Rand Automation
Model X4I

SPECIFICATIONS The Maximum Number of Compressors Controlled By The X4I Is Four (4).
Dimensions 11.45” x 9.45” x 6.0”
The Maximum Number Of Direct ir-PCB Connections To The X4I is Four (4).
291mm x 241mm x 152mm
Weight 14lb (6.4kg)
Mounting Wall, 4 x screw fixings
Enclosure IP65, NEMA 4
Supply 230Vac +/- 10%, 50 Hz
115Vac +/- 10%, 60 Hz
Power 50VA
Temperature 32°F to 115°F
(0°C to 46°C)
Humidity 0% to 95% RH
(non-condensing)

Supply ir-PCB COMPRESSOR CONTROL CABLE


Voltage 7 Conductor Cable, 18 Gauge, Stranded, Earth Shielded
Local Disconnect (Breaker) Box OR
On/Off Cable
Fused for 50VA Single Conductor Wire, 18 Gauge Stranded, Quantity (7)
Switch
In Grounded Conduit No Greater Than 330FT (100M)
Power Cable 24VAC Control Voltage
3 conductor (N, L, E) Pressure
(Sized in accordance with local Transducer
electrical and safety regulations). Cable

PRESSURE TRANSDUCER CABLE


2 Conductor Cable, 18 Gauge Stranded
Earth Shielded
No Greater Than 330FT (100M)
24VDC Control Voltage

X4I X05 CONNECTOR PT CONNECTOR


25 +VDC Pin #3
26 Signal Pin #1
Reference X4I Operations Manual for Pressure ir-PCB ir-PCB
Sensor Connection Details

PRESSURE TRANSDUCER

To Plant Air
System
RECEIVER
Ir-PCB Compressor #1 Ir-PCB Compressor #2
Control Cable Control Cable

DRIP LEG

ir-PCB ir-PCB

From Air
Compressors

Ir-PCB Compressor #4 Ir-PCB Compressor #3


Control Cable Control Cable
Reference X4I Application and Interconnect Guide For
Wiring Connections Between The X4, The ir-PCB, and
The Compressor

EN- 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

SECTION 4 — X8I SYSTEM OVERVIEW


It is recommended that installation and commissioning be carried out by an authorized and trained product supplier.
Ingersoll Rand Automation
Model X8I

SPECIFICATIONS The Maximum Number of Compressors Controlled By The X8I Is Eight (8).
Dimensions 13.4” x 9.45” x 6.0” The Maximum Number Of Direct ir-PCB Connections To The X8I is Four (4).
340mm x 241mm x 152mm Any Combination Of Compressor Connection Methods May Be Used As Long As
Weight 16.5lb (7.5kg) the Maximum Number Of Compressors (8) Is Not Exceeded.
Mounting Wall, 4 x screw fixings
Enclosure IP65, NEMA 4
Supply 230Vac +/- 10%, 50 Hz X8I
115Vac +/- 10%, 60 Hz
Power 100VA The EXP Box Will Add Another
Temperature 32°F to 115°F (4) Direct ir-PCB connections.
(0°C to 46°C) The X8I Supports 1 EXP Box.
Humidity 0% to 95% RH
This Would Allow A Total Of (8)
(non-condensing)
EXP Compressors To Be Connected
And Controlled Via The ir-PCB.
Supply
Voltage
Local Disconnect (Breaker) Box OPTIONAL
On/Off Cable EXP RS485 Network Cable
Fused for 100VA
Switch
Power Cable EXP RS485 NETWORK CABLE
3 conductor (N, L, E) Pressure Belden 9841 or Equivalent
(Sized in accordance with local Transducer In Grounded Conduit
electrical and safety regulations). Cable No Greater Than 33FT (10)

RS485 Network Cable

PRESSURE TRANSDUCER CABLE


RS485 NETWORK CABLE
2 Conductor Cable, 18 Gauge Stranded
Belden 9841 or Equivalent
Earth Shielded
In Grounded Conduit
No Greater Than 330FT (100M)
No Greater Than 4000FT (1219M)
24VDC Control Voltage

X8I X05 CONNECTOR PT CONNECTOR


25 +VDC Pin #3
26 Signal Pin #1
Reference X8I Operations Manual for Pressure ir-PCB ir-PCB
Sensor Connection Details

PRESSURE TRANSDUCER

To Plant Air
System
RECEIVER
Ir-PCB Compressor #1 Ir-PCB Compressor #2
Control Cable Control Cable

ir-PCB COMPRESSOR CONTROL CABLE


7 Conductor Cable, 18 Gauge, Stranded, Earth Shielded
OR
DRIP LEG Reference X8I Application and Interconnect Guide For Single Conductor Wire, 18 Gauge Stranded, Quantity (7)
Wiring Connections Between The X8I, The ir-PCB, In Grounded Conduit No Greater Than 330FT (100M)
and The Compressor 24VAC Control Voltage

From Air Reference X8I Application and Interconnect Guide For


Compressors The RS485 Network is a Serial, Point to Point
Wiring Connections Between The X8I, The ir-485 or irV-
Communication Network Refer to the X8I Application and
485 Gateway and The Compressor, S3 Direct Connects, and
Interconnect Guide For Wiring Details and Connectivity.
Optional Special Application Interface Boxes

Ingersoll
Rand ir-485 Gateway
102 psi
For All
ir-485 IR (Non- Nirvana) Compressors
IntelliSys “Red Eye”, SG and SE

ir-485 OR
I\O Direct To VSD EX
S3 irV-485 Gateway
From VSD Pressure
Transducer
For All
irV-485 Nirvana Compressors
To VSD Pressure
Transducer Input 20HP (15KW) and Above

1
2D
LE
D
LE
3 4
ir-
PCB

80443864 Rev. E EN-


RELEASED 05/Jun/2018 16:59:56 GMT

EN

SECTION 5 — VSD OVERVIEW


It is recommended that installation and commissioning be carried out by an authorized and trained product supplier.
Ingersoll Rand Automation
VSD Box
From VSD Box
To ir-PCB
To Intellisys Controller

LE
LE
D
2D
1
ir-PCB

VSD

1 > Intellisys Discharge


Pressure Transducer
1 2
2 > VSD Discharge
Pressure Transducer

From Pressure Transducer


To VSD Box

NOTE : An additional frequency measuring device called a SPEED KIT is mandatory for proper operation.

From VSD Box


To IR-5000 or IRV302 Pressure Transducer Input

From VSD Box


To ir-PCB
To 1PS Pressure Switch
LE
LE
D
2D
1

VSD

1 > Discharge Pressure


Transducer

2 > VSD Discharge


Pressure Transducer

From Pressure Transducer


To VSD Box

NOTE : An additional frequency measuring device called a SPEED KIT is mandatory for proper operation.

From VSD Box


To IR-5000 or IRV302 Pressure Transducer Input

EN- 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

SECTION 6 — ASSISTANCE
Contacting Technical Support Services or Service Bulletins listed on the IR Tech Direct can provide further assistance if there are
other questions or concerns during Installation and Start-up. Also, additional Application and Compressor Interconnect Guides
will be posted and available on the IR Tech Direct as they are developed and created.

SECTION 7 — COMPRESSOR INTERCONNECT DRAWINGS


The following Appendix’s contain reference drawings designed to assist with the connection of the X – Series Automation
System to Ingersoll Rand Air Compressors as well as Non-Ingersoll Rand Air Compressors. These drawings are for Guidance
Only; connections may differ with date, model, type, variant, special, custom or concession builds. This information is intended
to be used in conjunction with the compressor’s original control circuit diagram.

 INTELLISYS CONTROLLER E-PROM RECOMMENDATION REFERENCE LIST


Minimum Recommended E-prom Levels - IntelliSys Controllers

IntelliSys - First Generation Redeye IntelliSys - Second Generation SE

SSR 50 - 450HP 2.4 SSR 15 - 100HP (DSA) 1.75


Sierra 100 - 200HP 2.7 SSR-UP (Pegasus) 1.23
Recip 1.62 SSR 22-150KW (ESA) 1.93
Sierra 50 -100HP 1.3

IntelliSys - Second Generation SG IntelliSys - Nirvana SGN


SSR 50 - 450 (1 & 2 Stage) 1.5 Nirvana CC 100 - 200HP 1.45
SSR 75 - 350kW (ESA) 1.5 IntelliSys - Nirvana SGNe

Sierra 125-400HP 1.35 Nirvana CC 50 - 300HP 2.4

Recip 1.28 Nirvana OF 50 - 200HP 1.2

 INTELLISYS CONTROLLER INTERCONNECT RECOMMENDATION


When using the X8I or X12I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred” method
when interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-
30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
When using the X4I Automation System, the ir-PCB is the only method when interfacing and connecting to the FG (redeye),
SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP) Compressors. See Appendix B for
interconnect drawings for these applications X4i with software revision E20 is capable of using RS485 connection in place of
IR-PCB.

80443864 Rev. E EN-


EN-10
EN

NIRVANA 15-30KW (20-40HP)


DanFoss Controller
Redeye Controller Modbus Functionality in Controller
No Modbus Functionality in Controller Set Modbus To ON
ir-485 Operates in irbus mode irV-485 Set Modbus Address To Unique
Set Sequence Control To “ON” Modbus Address
Set Remote Start / Stop To “OFF” 1-8 For X8I 1-12 For x12I
Set Remote Control To “ON”
Series Compressors

Set Remote Start / Stop To “OFF”

NIRVANA
SGN / SGNe Controller
SE Controller Modbus Functionality in Controller
No Modbus Functionality in Controller Set Modbus To ON
ir-485 Operates in irbus mode irV-485 Set Modbus Address To Unique
Set Sequence Control To “ON” Modbus Address
Set Remote Start / Stop To “OFF” 1-8 For X8I 1-12 For x12I
Set Sequence Control To “ON”
Set Remote Start / Stop To “OFF”

SG Controller
Modbus Functionality in Controller Redeye Recip and SG Recip Controller
Set Modbus To ON
No Modbus Functionality in Controller
Set Modbus Address To Unique
ir-485 irV-485 Operates in irbus mode
Modbus Address
Set Sequence Control To “ON”
1-8 For X8I 1-12 For x12I
Set Remote Start / Stop To “OFF”
Set Sequence Control To “ON”
Set Remote Start / Stop To “OFF”
RELEASED 05/Jun/2018 16:59:56 GMT

Eiger: early R-Series


S3 Controller Xe-70M-Xe-90M-Xe-145M
Modbus Functionality in Controller turn Comm Control ON
RS485 Direct to S3 RS485 Direct to
Set Modbus To ON set Airbus address to compressor
From X8I or X12I Xe-70M, Xe-90M,
Set Modbus Address To Unique number
Automation and Xe-145M
Modbus Address on Xe-70M only, set Active
System Protocol to "Airbus"
1-8 For X8I 1-12 For x12I
Set Remote Control To “ON”
Set Remote Start / Stop To “OFF”

All Compressors Controllers Must Have Automatic Start / Stop Set To ON


APPENDIX A - IR-485, IRV-485, AND RS485 DIRECT TO INGERSOLL RAND INTELLISYS,
NIRVANA 15-30KW (20-40HP), AND R-SERIES COMPRESSOR INTERCONNECT DRAWINGS
 IR-485, IRV-485, AND RS485 DIRECT to Ingersoll Rand Intellisys, Nirvana 15-30kW (20-40hp) and R-

80443864 Rev. E
From Previous X8I or X12I To Next
Automation Network X8I or X12I Automation
Component Network Component

80443864 Rev. E
RS485 RS485

RJ11 Modbus Cable


X04 Supplied With The
And X02 irV-485 Gateway
X05 Modify As Shown By
Removing The RJ11 Plug.
 irV-485 To INTELLISYS SGN / SGNe

L2 L1 L2 L1

SHIELD GROUND

SHIELD SGN/SGNe
Mounting Bolt

GROUND
0VDC WIRE

+24VDC
P10
P8
1 2 1 2

2 1 2 1 2 1

SGN / SGNe
NC 3 2 1 3 2 1 3 2 1 3 2 1
As Viewed From
-V +V The Back Side Of Phoenix 6Pin
The Controller

LE D #6
LE D #7
LE D #8
LE D #9
OUTPUT 24VDC 0.3A X02 CONNECTOR

L1
L1

L2
L2
X04
irbus /

LE D # 2
LE D #3
LE D #5
LE D #4

s creen
s creen
X05 ir485 X03 Modbus
idec
irV-485
P7
RELEASED 05/Jun/2018 16:59:56 GMT

L2
DC ON 2
7.5 W OUTPUT
POWER SUPPLY
1 2 3 4 5 6

PS5R-A24 SW1 SW2 SW3


V.ADJ 1

12

10
11

4
8
9

1
2
3
5
6
7

+24V ac/dc
0V ac/dc
L1

LE D #1
ON
X01
INPUT 50/60HZ 1 2 OFF
100/240 VAC 0.17A

L N SGN / SGNe
Phoenix 6Pin
Place Ground COM PORT
Wire Lug Behind On Right Side
SGN/SGNe As Viewed From
Mounting Bolt The Back
+24 0
V V
L N G +24VDC DC DC
From Compressor
0VDC
110 / 230VAC
EN

EN-11
From Previous X8I or X12I To Next
Automation Network X8I or X12I Automation

EN-12
EN
Component Network Component

RS485 RS485
 ir-485 To INTELLISYS SG

X04 RJ11 Modbus Cable


And X02
Supplied With The
X05 irV-485 Gateway

L2 L1 L2 L1

SHIELD GROUND

SHIELD SG
Mounting Bolt

GROUND
0VDC WIRE

+24VDC
P10
1 2

2 1 2 1 2 1
P9

SG
SG RJ11 COM PORT
NC 3 2 1 3 2 1 3 2 1 3 2 1
As Viewed From On Right Side
-V +V The Back Side Of As Viewed From
The Controller

LE D #6
LE D #7
LE D #8
LE D #9
OUTPUT 24VDC 0.3A X02 The Back

L1
L1

L2
L2
X04
irbus /

LE D #2
LE D #3
LE D #5
LE D #4

s creen
s creen
X05 ir485 X03 Modbus
P8

idec
RELEASED 05/Jun/2018 16:59:56 GMT

RJ11
L2 (4)
1 2 3 4

ir-485 CONNECTOR
DC ON W OUTPUT 6
7.5 5
POWER SUPPLY 4
P7

PS5R-A24 3
SW1 SW2 SW3 2
V.ADJ 1

12

10
11

4
8
9

1
2
3
5
6
7

+24V ac/dc
0V ac/dc
LE D #1
ON
X01
INPUT 50/60HZ 1 2 OFF L1 (2)
100/240 VAC 0.17A

L N
Place Ground
Wire Lug Behind
SG Mounting Bolt
+24 0
V V
L N G +24VDC DC DC
From Compressor
0VDC
110 / 230VAC

80443864 Rev. E
From Previous X8I or X12I To Next
Automation Network X8I or X12I Automation
Component Network Component

80443864 Rev. E
RS485 Note: Learning Mode must be performed to communicate with SE IntelliSys controllers. RS485
Refer to manual CCN 80444094 for the learning mode procedure.
 ir-485 To INTELLISYS SE

X04 RJ11 Modbus Cable


And X02
Supplied With The
X05 ir-485 Gateway

L2 L1 L2 L1

SHIELD GROUND

SHIELD SG
Mounting Bolt

GROUND
0VDC WIRE
RJ11
L2 (4)
+24VDC CONNECTOR
6
5
4
3
J8

2 1 2 1 2 1 2
1

L1 (2)
NC 3 2 1 3 2 1 3 2 1 3 2 1

-V +V SE
SE

LE D #6
LE D #7
LE D #8
LE D #9
OUTPUT 24VDC 0.3A X02 As Viewed From

L1
L1

L2
L2
X04
irbus / The Back Side Of RJ11 COM PORT

LE D # 2
LE D #3
LE D #5
LE D #4

s creen
s creen
X05 ir485 X03 Modbus The Controller On Right Side
idec
RELEASED 05/Jun/2018 16:59:56 GMT

ir-485 As Viewed From


The Back
DC ON 7.5 W OUTPUT
POWER SUPPLY
PS5R-A24 SW1 SW2 SW3
V.ADJ

12

10
11

4
8
9

1
2
3
5
6
7

+24V ac/dc
0V ac/dc
J11

LE D #1
ON
X01
INPUT 50/60HZ 1 2 OFF
100/240 VAC 0.17A

L N
Place Ground
Wire Lug Behind
SE Mounting Bolt
+24 0
V V
L N G +24VDC DC DC
From Compressor
0VDC
110 / 230VAC
EN

EN-13
From Previous X8I or X12I To Next
Automation Network X8I or X12I Automation

EN-14
EN
Component Network Component

RS485 RS485

X04
And RJ11 Modbus Cable
X02 Supplied With The
X05
 ir-485 To INTELLISYS REDEYE

irV-485 Gateway

L2 L1
L2 L1
SHIELD
GROUND
SHIELD

L2 (4) L1 (2) Place Ground


GROUND Wire Lug Behind
0VDC WIRE Starter Interface
Redeye Board Mounting
+24VDC Starter Interface Screw
Board
Mounting Bolt RJ11
2 1 2 1 2 1 CONNECTOR

6543 2 1
NC 3 2 1 3 2 1 3 2 1 3 2 1

-V +V

LE D #6
LE D #7
LE D #8
LE D #9
OUTPUT 24VDC 0.3A X02

L1
L1

L2
L2
X04 J2
irbus /

LE D # 2
LE D #3
LE D #5
LE D #4

screen
screen
X05 ir485 X03 Modbus
RELEASED 05/Jun/2018 16:59:56 GMT

idec Sequencer Port


ir-485 Test Port
J3
DC ON 7.5 W OUTPUT
POWER SUPPLY BTS
PS5R-A24 SW1 SW2 SW3
V.ADJ

12

10
11

4
8

5
6
7
9

1
2
3
REDEYE STARTER

+24V ac/dc
0V ac/dc
LE D #1
ON INTERFACE BOARD
X01 RJ11 COM PORT
INPUT 50/60HZ 1 2 OFF
100/240 VAC 0.17A On Top Center
As Viewed Facing Board
L N

REDEYE STARTER
+24 0 INTERFACE BOARD
V V As Viewed Facing Board
L N G +24VDC DC DC
From Compressor
0VDC
110 / 230VAC

80443864 Rev. E
80443864 Rev. E
2 1 4 3 2 1 6 5 4 3 2 1

24VAC
See Instruction manual R6 R5 R4
Earth before use ( R2 R1
(
R3
X01
X02 X03

X04 X09 X07 X08 X06 X05


C8 C7 C6 C5 C4 C3 C2 C1 C+

RxD
GND
RS485-1
 RS485 To INTELLISYS S3

RS485-1

LOAD
C-ANA3
ANA2
C-ANA2
C-ANA1
ANA1

L2-
L1+
L2-
L1+

Vcc
TxD
9 8 7 6 5 4 3 2 1 2 1 2 1 2 1 6 5 4 3 2 1

IntelliSys S3
As Viewed From
The Back Side Of
The Controller

2 1 2 1

SHIELD
RELEASED 05/Jun/2018 16:59:56 GMT

RS485 RS485

From Previous X8I or X12I To Next


Automation Network X8I or X12I Automation
EN

EN-15
Component Network Component
From Previous X8I or X12I To Next
Automation Network X8I or X12I Automation

EN-16
EN

Component Network Component

RS485 RS485

X04
And RJ11 Modbus Cable
X02 Supplied With The
X05
irV-485 Gateway

L2 L1
L2 L1 NIRVANA 15-30KW
(20-40HP)
SHIELD
 irV-485 To NIRVANA 15-30KW (20-40HP)

CONTROL BOARD
GROUND
As Viewed Facing Board
SHIELD

GROUND
0VDC WIRE

+24VDC

2 1 2 1 2 1

NC 3 2 1 3 2 1 3 2 1 3 2 1

-V +V

LE D #6
LE D #7
LE D #8
LE D #9
OUTPUT 24VDC 0.3A X02

L1
L1

L2
L2
X04 NIRVANA
irbus /

LE D #2
LE D #3
LE D #5
LE D # 4

screen
screen
X05 ir485 X03 15-30KW
idec Modbus
RELEASED 05/Jun/2018 16:59:56 GMT

(20-40HP)
ir-485 COM PORT
DC ON On Right
7.5 W OUTPUT
POWER SUPPLY
Side As
PS5R-A24 SW1 SW2 SW3 Viewed
V.ADJ

12

10
11

4
8

5
6
7
9

1
2
3

+24V ac/dc
0V ac/dc
L1 L2 From The

LE D #1
ON Back
X01
INPUT 50/60HZ 1 2 OFF
100/240 VAC 0.17A 2 1

L N
61 68 69 61 68 69

+24 0
V V
L N G +24VDC DC DC Phoenix 3Pin Place Ground Wire Lug
From Compressor CONNECTOR Behind
0VDC
110 / 230VAC NIRVANA 15-30KW

80443864 Rev. E
(20-40HP) Mounting Bolt
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 RS485 Direct Interconnect To Ingersoll Rand Xe-70M Controlled Compressors

80443864 Rev. E EN-17


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 RS485 Direct Interconnect To Ingersoll Rand Xe-90M and Xe-145M Controlled Compressors

EN-18 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

APPENDIX B - IR-PCB TO INGERSOLL RAND INTELLISYS CONTROLLED COMPRESSOR


INTERCONNECT DRAWINGS
 IR-PCB INTERCONNECT TO INGERSOLL RAND UNIGY & NIRVANA 20-40 HP COMPRESSORS
FOR UNIGY COMPRESSORS:
• All Unigy Phase 1 compressors “MUST” be converted to Phase 2 or higher. Contact Technical Support Services for the CCN’s
required for this conversion.
FOR NIRVANA 20-40HP COMPRESSORS:
• When using the X8I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred” method when
interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-
30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications.
• When using the X4I Automation System, the ir-PCB is the only method when interfacing and connecting to the FG (redeye),
SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP) Compressors. See Appendix B for
interconnect drawings for these applications.
• Remote Control “MUST” be set to “ON”.
• Remote Start / Stop must be set to “OFF”.
• Check the Nirvana Software revision level. It “MUST” be updated to Version 1.10 or greater. Contact Technical Support
Services to acquire the update.
DRAWING NOTES FOR UNIGY PHASE 1 MACHINES:
• Note: All Unigy Phase 1 compressors “MUST” be converted to Phase 2 or higher. Contact Technical Support Services for
the CCN’s required for this conversion. The Drawing “Unigy Phase 1 1of2” is a representation for “AFTER” the conversion is
completed.
• Note: The Unigy Target Pressure “MUST” be set equal to the “midpoint” of the X -Series Automation pressure control band.
DRAWING NOTES FOR UNIGY PHASE 2/3 MACHINES:
• Note: The Unigy Target Pressure “MUST” be set equal to the “midpoint” of the X -Series Automation pressure control band.

DRAWING NOTES FOR NIRVANA 20-40HP MACHINES:


• Note: Remote Control “MUST” be set to on.

• Note: The Nirvana Target Pressure “MUST” be set equal to the “midpoint” of the X -Series Automation pressure control band.

80443864 Rev. E EN-19


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Unigy Phase 1(1 of 2)

5.5 – 11 kW
7.5 - 15 HP
Unigy 1
+24VDC
+24VDC

DI-2
DI-4
D13

NO
EN

0V
10

13

14

12

11

17
9

5
VFD/FIX
HATS

E-STOP
SA1

C
NO

NO
Load/Unload

NC

NC
C01 VFD/fixed

RUN
+VDC

ALARM
Load Enable

READY

OUT IN
C04
C02

IR-PCB

LED 3
RUN
LED 2 LOAD
C03
LOAD UNL
SEQ CONT

LED 1 SEQ
LED 5 V
+20V

LED 4
GND
D11
D12

READY
V

2
1

3
4
5
6
V

1
C05
X - SERIES AUTOMATION
COMPRESSOR #1
X01 TERMINAL

V1
1

3
4
5
6
2

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

EN-20 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Unigy Phase 1 (2 of 2)

80443864 Rev. E EN-21


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Unigy Phase 2/3 (1 of 2)

5.5 – 11 kW
7.5 - 15 HP
Unigy
+24VDC
+24VDC

DI-2
DI-4
D13

NO
EN

0V
10

13

14

12

11

17
9

5
VFD/FIX
HATS

E-STOP
SA1

C
NO

NO
Load/Unload

NC

NC
C01 VFD/fixed

RUN
+VDC

ALARM
Load Enable

READY

OUT IN
C04
C02

IR-PCB

LED 3
RUN
LED 2 LOAD
C03
LOAD UNL
SEQ CONT

LED 1 SEQ
LED 5 V
+20V

LED 4
GND
D11
D12

READY
V
1
2
3
4
5
6

2
V

1
C05
X - SERIES AUTOMATION
COMPRESSOR #1
X01 TERMINAL

V1
1

3
4
5
6
2

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

EN-22 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Unigy Phase 2/3 (2 of 2)

80443864 Rev. E EN-23


EN-24
EN

X - SERIES AUTOMATION
12 +24VDC
COMPRESSOR #1
+VDC
X01 TERMINAL
Remote
C01 VFD/fixed 18 VFD / FIXED
V1 V V
Load Enable
1 1 SEQ CONT Remote
32 LOAD ENABLE
 Nirvana 15 –30KW (20 –40HP) (1 of 2)

Load/Unload
2 2 LOAD UNL
Remote
3 3 GND C03 33 LOAD / UNLOAD
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 V

IN
C
LED 2 LOAD
NC
LED 1 SEQ
37 SAFE

ALARM

LED 4
RUN

READY
LED 3
4 C
C05
C04 RUN
1
20 COM
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB Alternate Connection Method For


READY Input If Alarm Contacts Are 6 NC
Being Used

Nirvana
20 - 40 HP
15 – 30 kW

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Nirvana 15 -30KW (20-40HP) (2 of 2)


TN, TT, IT 3+PE. 380-460V, 50Hz/60Hz.

80443864 Rev. E EN-25


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND FIRST GENERATION INTELLISYS “REDEYE” CONTROLLED


COMPRESSORS
FOR REDEYE INTELLISYS CONTROLLED MACHINES:
• When using the X8I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred” method when
interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-
30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
• When using the X4I Automation System, the ir-PCB is the only method when interfacing and connecting to the FG (redeye),
SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP) Compressors. See Appendix B for
interconnect drawings for these applications.
• The ‘MASTER CONTROL’ setting of the Intellisys controller must be set to ‘ON’
• The ‘SEQUENCER’ setting of the Intellisys controller must be set to ‘ON’.
• Remote Start / Stop must be set to “OFF”.
• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation or ACS.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
• FOR DSA REDEYE CONTROLLERS,the ‘SEQUENCER Option’ must be purchased. installed and then turned on.
CCN: 39225099
• FOR DSA REDEYE CONTROLLERS,the ‘REMOTE START / STOP Option’ must be purchased and Installed to enable MASTER
CONTROL. CCN: 39479423
• FOR ESA REDEYE INTELLISYS CONTROLLERS,the SI1 interface (CCN: 42425710) must be used to allow the Redeye to be
controlled by the X -Series Automation.
• FOR SIERRA REDEYE INTELLISYS CONTROLLERS, the SI1 interface (CCN: 42425710) must be used to allow the Redeye
Controller to be sequenced/controlled by the X -Series Automation
DRAWING NOTES FOR REDEYE INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full voltage wiring the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys BTS1-28 terminal.

EN-26 80443864 Rev. E


80443864 Rev. E
Analog Barrier Board
BTS3-
Remote Load/Unload
X - SERIES AUTOMATION 11 (was Remote Start)
COMPRESSOR #1
 SSR Redeye (1 of 3)

+VDC 12
X01 TERMINAL
C01 VFD/fixed
V1 V V Remote Load Enable
Load Enable 16 (was Remote Stop)
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL 18
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

BTS1-
ALARM

LED 4
RUN

READY
0VAC 1M 1

LED 3
C05
C04 RUN
1
BTS1-
2 READY HATS
110VAC 34
E-STOP
IR-PCB

BTS2-
1
2
RELEASED 05/Jun/2018 16:59:56 GMT

3
Starter Interface Board

BTS2
HATS
110VAC 34
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-27
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR Redeye FV (2 of 3)

ELECTRICAL SCHEMATIC FULL VOLTAGE

EN-28 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR Redeye SD (3 of 3)

ELECTRICAL SCHEMATIC STAR DELTA

80443864 Rev. E EN-29


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND SECOND EDITION INTELLISYS “SE” CONTROLLED COMPRESSORS
FOR ALL SE INTELLISYS CONTROLLED MACHINES:
• When using the X8I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred” method when
interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-
30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
• When using the X4I Automation System, the ir-PCB is the only method when interfacing and connecting to the FG (redeye),
SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP) Compressors. See Appendix B for
interconnect drawings for these applications.
• The ‘SEQUENCER’ setting of the Intellisys controller must be set to ‘ON’.
• Remote Start / Stop must be set to “OFF”.
• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation or ACS.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
FOR UP SE INTELLISYS CONTROLLERS,
• NOTE: Must use option chip or special EPROM to connect IR-PCB to SE IntelliSys

Minimum Software Version 1.11


CCN: 39217047 (w/o PORO)
CCN: 39217039 (w PORO)

When installing the Sequence Option to enable Remote Load/Unload, the Remote Start/Stop input terminals are now used for
the Remote Load inputs. Remote Start Stop will no longer be functional. The SI1 interface (CCN: 42425710) can be used in place
of the Sequence Option to allow the SE controlled machines to function with both Remote Load Unload and Remote Start
Stop.
Software Version 1.20 and Greater

The ‘CONTACT SEQUENCE’ setting of the Intellisys controller must be set to ‘ON’.
DRAWING NOTES FOR UP SE INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full voltage wiring the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys J5-1 terminal.
• Note: For Pegasus machines wiring may be factory installed connecting the Intellisys Alarm Relay J5-9, J5-10 and J5-11 to a
terminal strip but unused. Remove any factory installed wiring from the Intellisys Alarm Relay contacts and connect the X
-Series Automation Interface board wiring directly to the Intellisys Alarm Relay terminals J5-9 and J5-10.
FOR ESA SE INTELLISYS CONTROLLERS, the ‘SEQUENCER Option’ must be purchased. installed and then turned on.
Minimum Software Version 1.40
CCN: 39217047 (w/o PORO)
CCN: 39217039 (w PORO)

When installing the Sequence Option to enable Remote Load/Unload, the Remote Start Stop input terminals are now used for
the Remote Load inputs. Remote Start Stop will no longer be functional. The SI1 interface (CCN: 42425710) can be used in place
of the Sequence Option to allow the SE controlled machines to function with both Remote Load Unload and Remote Start
Stop.
DRAWING NOTES FOR ESA SE INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full voltage wiring the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys J5-1 terminal.

EN-30 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

FOR DSA SE INTELLISYS CONTROLLERS, the ‘SEQUENCER Option’ must be purchased. installed and then turned on.
CCN: 22179238

When installing the Sequence Option to enable Remote Load/Unload, the Remote Start Stop input terminals are now used for
the Remote Load inputs. Remote Start Stop will no longer be functional. The SI1 interface (CCN: 42425710) can be used in place
of the Sequence Option to allow the SE controlled machines to function with both Remote Load Unload and Remote Start
Stop.
DRAWING NOTES FOR DSA SE INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full Voltage wiring, the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys terminal 42.
FOR SIERRA SE INTELLISYS CONTROLLERS, the SI1 interface (CCN: 42425710) must be used to allow the SE Controller to be
sequenced/controlled by the X -Series Automation.

80443864 Rev. E EN-31


EN-32
EN

 SE UP (1 of 2)

X - SERIES AUTOMATION J1
COMPRESSOR #1 Remote Load/Unload
+VDC 11
X01 TERMINAL (was Remote Start)
C01 VFD/fixed 12
V1 V V Remote Enable
Load Enable 13 (was Remote Stop)
1 1 SEQ CONT
Load/Unload 14
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
J5
0VAC 1M 1
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
J5
2 READY
110VAC 7
E-STOP
IR-PCB
J5
9
10
RELEASED 05/Jun/2018 16:59:56 GMT

11 Intellisys SE
UP Series

J5
110VAC 7
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SE UP (2 of 2)
INTELLISYS-DOL

80443864 Rev. E EN-33


EN-34
EN

 SE ESA (1 of 2)

X - SERIES AUTOMATION J1
COMPRESSOR #1 Remote Load/Unload
+VDC 11
X01 TERMINAL (was Remote Start)
C01 VFD/fixed 12
V1 V V Remote Enable
Load Enable 13 (was Remote Stop)
1 1 SEQ CONT
Load/Unload 14
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
J5
0VAC KM1 1
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
J5
2 READY
110VAC 7
MCB2 HAT E-STOP
IR-PCB
J5
9
10
RELEASED 05/Jun/2018 16:59:56 GMT

11 Intellisys SE
ESA Series

J5
110VAC 7
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SE ESA (2 of 2)
INTELLISYS

80443864 Rev. E EN-35


EN-36
EN

 SE DSA (1 of 2)

X - SERIES AUTOMATION J1
COMPRESSOR #1 Remote Load/Unload
+VDC 6 (was Remote Start)
X01 TERMINAL
C01 VFD/fixed 5
V1 V V Remote Enable
Load Enable 4 (was Remote Stop)
1 1 SEQ CONT
Load/Unload 3
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
J5
0VAC 1M 42
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
J5
2 READY 1ATS
110VAC 36
E-STOP
IR-PCB
J5
34
33
RELEASED 05/Jun/2018 16:59:56 GMT

Intellisys SE
32 DSA Contact
Cooled

J5
110VAC 36.
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SE DSA (2 of 2)

FULL VOLTAGE

80443864 Rev. E EN-37


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND SECOND GENERATION INTELLISYS “SG” CONTROLLED


COMPRESSORS
FOR SG INTELLISYS CONTROLLED MACHINES:
• When using the X8I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred” method when
interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-
30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
• When using the X4I Automation System, the ir-PCB is the only method when interfacing and connecting to the FG (redeye),
SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP) Compressors. See Appendix B for
interconnect drawings for these applications
• The ‘SEQUENCER’ setting of the Intellisys controller must be set to ‘ON’.
• Remote Start / Stop must be set to “OFF”.
• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation or ACS.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
• FOR SIERRA SG INTELLISYS CONTROLLERS, the SI1 interface (CCN: 42425710) can be used as an alternative to allow the SG
Controller to be sequenced/controlled by the X -Series Automation
DRAWING NOTES FOR SG INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full Voltage wiring, the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys P1-2 terminal.

EN-38 80443864 Rev. E


80443864 Rev. E
 SG SSR (1 of 2)

X - SERIES AUTOMATION P3
COMPRESSOR #1
+VDC 25 Remote Load Enable
X01 TERMINAL
C01 VFD/fixed 26
V1 V V
Load Enable 27 Remote Load/Unload
1 1 SEQ CONT
Load/Unload 28
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
1Sb P1
0VAC 1M 2
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
P1
2 READY 1ATS
110VAC 1
E-STOP
IR-PCB
P2
3
2
RELEASED 05/Jun/2018 16:59:56 GMT

1 Intellisys SG

P!
1ATS
110VAC 1
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-39
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SG SSR (2 of 2)

EN-40 80443864 Rev. E


80443864 Rev. E
 SG Sierra (1 of 2)

X - SERIES AUTOMATION P3
COMPRESSOR #1
+VDC 25 Remote Load Enable
X01 TERMINAL
C01 VFD/fixed 26
V1 V V
Load Enable 27 Remote Load/Unload
1 1 SEQ CONT
Load/Unload 28
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
1Sb P1
0VAC 1M 2
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
P1
2 READY 1ATS
110VAC 1
E-STOP
IR-PCB
P2
3
2
RELEASED 05/Jun/2018 16:59:56 GMT

1 Intellisys SG

P!
1ATS
110VAC 1
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-41
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SG Sierra (2 of 2)

EN-42 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND NIRVANA INTELLISYS “SGN / SGNE” CONTROLLED


COMPRESSORS
FOR SGN/SGNE INTELLISYS CONTROLLED MACHINES:
• When using the X8I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred” method when
interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-
30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
• Ingersoll Rand does NOT recommend using a X4i with any 50Hp to 300Hp Nirvana. The Nirvana will not be properly
monitored or trimmed if connected to an X4i with the SI1. When using the X4I Automation System, the ir-PCB is the only
method when interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and
Nirvana 15-30KW (20-40HP) Compressors. See Appendix B for interconnect drawings for these applications
• The SI1 interface (CCN: 42425710) must be used to allow the SGN/SGNe Controller to be sequenced/controlled by the X
-Series .
• Note: Using the SI1 interface with a IR-PCB and X4i, the X4i will only treat the Nirvana 50 to 300Hp range compressor as a
fixed speed. It cannot trim it correctly.
• The ‘SEQUENCER’ setting of the Intellisys controller must be set to ‘ON’.
• Remote Start / Stop must be set to “OFF”.
• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation or ACS.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
DRAWING NOTES FOR NIRVANA MACHINES:
• Note: The Nirvana Target Pressure “MUST” be set equal to the Midpoint of the X -Series Automation pressure control band.

• Refer to the X -Series Automation Overview Drawing for the X -Series Automation Compressor 2 through 4 X01 to IR-PCB
terminal connections.

80443864 Rev. E EN-43


EN-44
EN

Sequence Interface 1

X - SERIES AUTOMATION 1 Remote Load / Unload


COMPRESSOR #1
+VDC
X01 TERMINAL
2
C01 VFD/fixed
 Nirvana SGN/SGNe (1 of 3)

V1 V V
Load Enable
3 Run
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL
4 Remote Load Enable
3 3 GND C03
NO
4 4 D11 5 Neutral
C

OUT
5 5 D12
NC 6 Neutral
6 6 +20V C02
NO
LED 5 VFD 7 Hot COM

IN
C
LED 2 LOAD
NC
LED 1 SEQ

ALARM

LED 4
RUN

READY
N H

LED 3
C05 110 VAC
C04 RUN COM
Supply
1
SGN/
2 READY SGNe
P1
HATS
IR-PCB 110VAC 1
E-STOP
SGN/
SGNe
RELEASED 05/Jun/2018 16:59:56 GMT

P2
3
2
1
P!
1ATS
110VAC 1 Intellisys Controller
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Nirvana SGN/SGNe (2 of 3)

80443864 Rev. E EN-45


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Nirvana SGN/SGNe (3 of 3)

EN-46 80443864 Rev. E


80443864 Rev. E
Sequence Interface 1

X - SERIES AUTOMATION 1 Remote Load / Unload


COMPRESSOR #1
+VDC
X01 TERMINAL
2
C01 VFD/fixed
V1 V V
Load Enable
3 Run
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL
4 Remote Load Enable
3 3 GND C03
NO
4 4 D11 5 Neutral
C

OUT
5 5 D12
NC 6 Neutral
6 6 +20V C02
NO
 SI1 Interface to Redeye, SE, SG Controllers

LED 5 VFD 7 Hot COM

IN
C
LED 2 LOAD
NC
LED 1 SEQ

ALARM

LED 4
RUN

READY
N H

LED 3
C05 110 VAC
C04 RUN COM
Supply
1 SE SE
2 READY Redeye DSA ESA/UP SG
BTS1- J5 J5 P1
HATS
IR-PCB 110VAC 34 36 7 1
E-STOP
SE SE
Redeye DSA ESA/UP SG
RELEASED 05/Jun/2018 16:59:56 GMT

BTS2- J5 J5 P2
1 34 9 3
2 33 10 2
SE SE
Redeye DSA ESA/UP SG 3 32 11 1
BTS1- J5 J5 P1
1ATS
110VAC 34 36 7 1 Intellisys Controller
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-47
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND INTELLISYS S3 CONTROLLED COMPRESSORS


FOR ALL S3 INTELLISYS CONTROLLED MACHINES:
• The ‘REMOTE CONTROL’ setting “RC” of the Intellisys controller must be set to ‘ON’.

• Remote Start / Stop must be set to “OFF”.


• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
DRAWING NOTES FOR INTELLISYS S3 MACHINES:
• Note: R1 Relay -IR CCN: 39403290

• Note: R1 Relay Base – IR CCN: 39125091

EN-48 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Intellisys S3 (1 of 2)

Remote Load/Unload
Remote Load Enable

Intellisys S3
X03
X04

X02
2
1

7
8

3
4
Contact
KM2

110VAC
KM1

Contact
0VAC

Coil
R1
R1
C

C
NO

NO
Load/Unload

NC

NC
C01 VFD/fixed

RUN
+VDC

ALARM
Load Enable

READY

OUT IN
C04
C02

IR-PCB

LED 3
RUN
LED 2 LOAD
C03
LOAD UNL
SEQ CONT

LED 5 VFD

LED 1 SEQ
+20V

LED 4
GND
D11
D12

READY
V
1
2
3
4
5
6

2
V

1
C05
X - SERIES AUTOMATION
COMPRESSOR #1
X01 TERMINAL

V1
1

3
4
5
6
2

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E EN-49


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Intellisys S3 (2 of 2)

EN-50 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 CMC Sierra (1 of 2)

Remote Load/Unload
Remote Load Enable

CMC
BCM

+24VDC
Terminal
Strip

2TB

2TB

2TB

1TB
1

5
1Sb
1M
1TB12
C

C
NO

NO
NC

NC
Load/Unload
C01 VFD/fixed

RUN
+VDC

ALARM
Load Enable

READY

OUT IN
C04
C02

IR-PCB

LED 3
RUN
LED 2 LOAD
C03
LOAD UNL
SEQ CONT

LED 5 VFD

LED 1 SEQ
+20V

LED 4
GND
D11
D12

READY
V

2
1

3
4
5
6
V

1
C05
COMPRESSOR #1
X01 TERMINAL
X4I / X8I / X12I

V1
1

3
4
5
6
2

The CMC Controller must be updated with Release Version 1.42 or greater. The file can be found on the
ServiceNet. Select Centrifugal, then select CMC Files, then select V320. The Executable file is 22458368.exe

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E EN-51


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 CMC Sierra (2 of 2)

EN-52 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 ir-PCB to Xe-50M E02 and E03 software


Xe-50M with software revision E02 or E04. interconnect to ir-PCB

80443864 Rev. E EN-53


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 ir-PCB to Xe-50M software E05 or newer


IR-PCB TO XE-50M WITH E05 OR EO6 REVISION SOFTWARE INTERCONNECT

EN-54 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 ir-PCB Interconnect for Xe-70M Fixed Speed equipped compressors


Xe-70M Fixed Speed

80443864 Rev. E EN-55


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 ir-PCB Interconnect for Xe-90M and Xe-145M Fixed Speed equipped compressors

R Series Fixed Speed, SSR, or Sierra with Xe-90M or Xe-145M

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

EN-56 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

APPENDIX C -IR-PCB TO INGERSOLL RAND PRESSURE SWITCH CONTROLLED COMPRESSOR


INTERCONNECT DRAWINGS
 IR-PCB INTERCONNECT TO INGERSOLL RAND PRESSURE SWITCH CONTROLLED COMPRESSORS
FOR ALL COMPRESSORS:
• Compressors to be connected must have automatic Start / Stop capability .

DRAWING NOTES FOR PRESSURE SWITCH CONTROLLER MACHINES:


• Ensure each compressor is equipped with independent Excessive Pressure Shutdown Switch. An increase in pressure
differential across air treatment equipment can result in excess compressor discharge pressure. See Appendix A, Page 70
and 71 for application drawings. In most applications, the model and type of pressure switch supplied with the compressor
can be used as the Excessive Pressure Shutdown Switch. If this is specific model/type of pressure switch is not readily
available, any pressure switch can be utilized as long as it equals or exceeds the specifications of the pressure switch found
on the compressor.
• Set the Excessive Pressure Shutdown Switch to “OPEN” 5 PSI less than the maximum discharge pressure recommended by
the compressor manufacturer.

80443864 Rev. E EN-57


EN-58
EN

Restart TD
MOL HATR Relay
E-STOP Contact SS Contact Contact

110VAC
 SSR UP5 11-22 SD (1 of 2)

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload To TM2 Relay
2 2 LOAD UNL P To KM1 Contact
3 3 GND C03
NO
4 4 D11
To KM2 Contact
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

KM1 0 VAC
KM1 Relay
ALARM Contact

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR UP5 11-22 SD (2 of 2)

80443864 Rev. E EN-59


EN-60
EN

KM1 TM3
Relay Relay
Contact Contact
Restart TD
MOL MMS HATR Relay
E-STOP Contact Contact SS Contact Contact

110VAC
 SSR UP5 22-37 SD (1 of 2)

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload To TM2 Relay
2 2 LOAD UNL P To KM1 Contact
3 3 GND C03
NO
4 4 D11
To KM2 Contact
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
KM1 0 VAC
KM1 Relay
ALARM Contact

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
RELEASED 05/Jun/2018 16:59:56 GMT

2 READY

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR UP5 22-37 SD (2 of 2)

80443864 Rev. E EN-61


EN-62
EN

Restart TD
HATR Relay
E-STOP COL ON OFF Contact Contact

110VAC
 SSR UP6 15-30 FV (1 of 2)

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
To 1SV
C

OUT
5 5 D12 To 3SV
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
M 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR UP6 15-30 FV (2 of 2)

80443864 Rev. E EN-63


EN-64
EN

Restart TD
HATR Relay
E-STOP OL ON OFF Contact Contact

110VAC
 SSR UP6 15-30 SD (1 of 2)

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To 1M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
C To 2M Contact

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC 1M
LED 1 SEQ
Contact
1M 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR UP6 15-30 SD (2 of 2)

80443864 Rev. E EN-65


1M TDRI
Relay Relay

EN-66
EN

Contact Contact

Restart TD
MMS HATR Relay
SS
E-STOP OL Contact Contact Contact
ON OFF

110VAC
 SSR UP6 40-50 FV (1 of 2)

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To 1M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
C To TDRI Contact

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
1M 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
RELEASED 05/Jun/2018 16:59:56 GMT

2 READY

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR UP6 40-50 FV (2 of 2)

80443864 Rev. E EN-67


EN-68
EN

1M TDRI
Relay Relay
Contact Contact

Restart TD
MMS HATR Relay
SS
E-STOP OL Contact Contact Contact
ON OFF
 SSR UP6 40-50 SD (1 of 2)

110VAC

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To 1M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
C To 2M Contact

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD 1M
NC Contact
LED 1 SEQ
1M 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
RELEASED 05/Jun/2018 16:59:56 GMT

2 READY

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
DRYER OPTION 3M 30L

3MTR

80443864 Rev. E
4M 40L

4FU 4MTR

5FU

6FU

1S
2M
 SSR UP6 40-50 SD (2 of 2)

T4 T4 T4

T5 T5 T5

T6 T6
A1 T6
14
SEE NOTES 1M
0L 2 7 4
L1 6 6 12
2
T1 T1 8 12 2
T1
3 5 3 5 6
L2 1MTR 1MTR
T2 T2 9 11 1MTR
T2 3 9
1 4
1 4 7 10 11
L3
T3 T3 1
T3 8 5 10
A2
2
MMS

4 5 4 5
T3 T3
3 6 T3
3 6
2MTR 2MTR 7
2FU 3FU T2 T2 2 2MTR 7
T2 2
1 8 8
9 1
9
T1 T1
120/1/60HZ T1
CPT
110/1/50HZ

2
1FU
1LT 200 / 380 / 575 Volts 230 Volts 460 Volts
G
1 1
2Ma TDa VERIFY ACTUAL MOTOR CONNECTIONS WITH MOTOR SCHEMATIC
1S
9 15 19 2

TD
9
1Sa 1Sb RC1
1Ma TDR1a
2M
20 2
23 5
1Mb 122 123 126 124 125
1M 4M
9 18 FOL
2RPS 40L
EDV
2
SS VAR 9 3M 2
RELEASED 05/Jun/2018 16:59:56 GMT

ES MMSa OFF ON 121 122 125


OLa HATR-1 TRa 1RPS 30L
HM
14 24 3 5 6 9
DRYER OPTION
TR
7 7
1Mc 2LT
W
IPS 17

2Mb TDR1b 10 1SV


2
8 25
3SV
10

S1
5SV
2
ON/OFF
6SV
MOD

TDR1 2
22 RST
3 HATR
22 11 2
HATR-2 HATS
12 11
HATR-3 3LT
22182349 REV H 3 R
EN

13 2

EN-69
EN-70
EN

To 1M Contact
X - SERIES AUTOMATION
To CR Relay
COMPRESSOR #1 OL E-STOP ST
+VDC
X01 TERMINAL To HM
VFD/fixed HATS
C01
 UP6 5-15 FV 1PH 60Hz (1 of 2)

110VAC To EDV
V1 V V To M
Load Enable
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL CR
Contact
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
PS
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

ALARM

LED 4
RUN
0 VAC

READY
LED 3
C05 M
C04 RUN
1
2 READY

IR-PCB
UnLoad
RELEASED 05/Jun/2018 16:59:56 GMT

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6 5-15 FV 1PH 60Hz (2 of 2)

80443864 Rev. E EN-71


EN-72
EN

To 1M Contact
X - SERIES AUTOMATION
To CR Relay
COMPRESSOR #1 OL E-STOP ST
+VDC
X01 TERMINAL To HM
HATS
C01 VFD/fixed To EDV
 UP6 5-15 FV 3PH 60Hz (1 of 2)

V1 V V 110VAC
Load Enable To M
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL CR
Contact
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
PS
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

ALARM

LED 4
RUN
0 VAC

READY
LED 3
C05 M
C04 RUN
1
2 READY

IR-PCB
UnLoad
RELEASED 05/Jun/2018 16:59:56 GMT

1PS Load

To Avoid Potential Wiring Issues , Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6 5-15 FV 3PH 60Hz (2 of 2)

80443864 Rev. E EN-73


EN-74
EN

To 1M Contact
X - SERIES AUTOMATION
To CR Relay
COMPRESSOR #1 OL E-STOP ST
+VDC
X01 TERMINAL To HM
HATS
C01 VFD/fixed 110VAC To EDV
V1 V V To 1M/1S/2M Contacts
Load Enable
1 1 SEQ CONT To TD Relay
 UP6 5-15 SD 3PH 60Hz (1 of 2)

Load/Unload
2 2 LOAD UNL CR
Contact
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
PS
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

1M
ALARM Contact

LED 4
RUN
0 VAC

READY
LED 3
C05 1M
C04 RUN
1
2 READY

IR-PCB
UnLoad
RELEASED 05/Jun/2018 16:59:56 GMT

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6 5-15 SD 3PH 60Hz (2 of 2)

80443864 Rev. E EN-75


EN-76
EN

To KM1 Contact
X - SERIES AUTOMATION MOL To CR Relay
COMPRESSOR #1 Contact E-STOP ST
+VDC
X01 TERMINAL To HM
HATS To EDV
C01 VFD/fixed 110VAC
V1 V V KM1/KM2/KM3 Contacts
Load Enable
1 1 SEQ CONT To KM1
Load/Unload
 UP6 5-15 FV 3PH 50Hz (1 of 2)

2 2 LOAD UNL CR
Contact
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD P

IN
C
LED 2 LOAD
NC
LED 1 SEQ

KM1
ALARM Contact

LED 4
RUN
0 VAC

READY
LED 3
C05 KM
C04 RUN
1
2 READY

IR-PCB
UnLoad
RELEASED 05/Jun/2018 16:59:56 GMT

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6 5-15 FV 3PH 50Hz (2 of 2)

80443864 Rev. E EN-77


EN-78
EN

To KM1 Contact
X - SERIES AUTOMATION MOL To CR Relay
COMPRESSOR #1 Contact E-STOP ST
+VDC
X01 TERMINAL To HM
HATS To EDV
C01 VFD/fixed 110VAC
V1 V V KM1/KM2/KM3 Contacts
Load Enable
To KM1
 UP6 5-15 SD 3PH 50Hz (1 of 2)

1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL CR
Contact
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD P

IN
C
LED 2 LOAD
NC
LED 1 SEQ

KM1
ALARM Contact

LED 4
RUN
0 VAC

READY
LED 3
C05 KM
C04 RUN
1
2 READY

IR-PCB
UnLoad
RELEASED 05/Jun/2018 16:59:56 GMT

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6 5-15 SD 3PH 50Hz (2 of 2)

80443864 Rev. E EN-79


EN-80
EN

MCB2 MOL K3
Contact HAT Contact E-STOP Contact SS ST
To TM3 Contact
To AS Switch
110VAC
K2 Contact
ST TM2 Contact
X - SERIES AUTOMATION CR
COMPRESSOR #1 (OPT) Contact
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL P To TM2 Relay
3 3 GND C03
NO
4 4 D11
To KM2 Contact
C

OUT
5 5 D12
NC
 SSR M15-22c 20-30HP XF EP HP HXP 50-60Hz (1 of 2)

6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ TM2
Contact

ALARM KM1 0 VAC

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SSR M15-22c 20-30HP XF EP HP HXP 50-60Hz (2 of 2)


NON-INTELLISYS

80443864 Rev. E EN-81


EN-82
EN

 M11 -M18.5 (1 of 2)

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
From Intellisys SS To Intellisys
C01 VFD/fixed Controller Controller
V1 V V
Load Enable Terminal 24 Terminal 9
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD PS

IN
C
LED 2 LOAD
NC
LED 1 SEQ

ALARM From Intellisys

LED 4
Controller

RUN

READY
LED 3
C05 Terminal 3
KM1
C04 RUN
1 From Intellisys
2 READY Controller
Terminal 4
IR-PCB
UnLoad
RELEASED 05/Jun/2018 16:59:56 GMT

1PS Load

To Avoid Potential Wiring Issues , Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 M11 -M18.5 (2 of 2)

80443864 Rev. E EN-83


EN-84
EN

K1
Contact
 M37-50 (1 of 2)

To 2TR Contact
48VAC
To 1VAC Contact
To 3OP Contact
X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL P To 2TR Relay
3 3 GND C03
NO
4 4 D11
To KM2 Contact
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
KM1 Contact
KM1 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05 KM3 Contact
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 M37-50 (2 of 2)

80443864 Rev. E EN-85


EN-86
EN

1CR
 M55-75 (1 of 2)

Contact

To 2TR Contact
48VAC
To 1VAC Contact
To 3OP Contact
X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL P To 2TR Relay
3 3 GND C03
NO
4 4 D11
To DC Contact
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ
MC Contact
MC 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05 SC Contact
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 M55-75 (2 of 2)

80443864 Rev. E EN-87


EN-88
EN

PUSH PULL
STOP START
HATS To 1CR Relay
110VAC

CR CR
 EP 20-30 ESP FV (1 of 2)

Contact Contact
1TD Contact

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
To 1TD Relay
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
C To 1M Contact

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD 1M
NC Contact
LED 1 SEQ
1M 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
RELEASED 05/Jun/2018 16:59:56 GMT

2 READY

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 EP 20-30 ESP FV (2 of 2)

80443864 Rev. E EN-89


EN-90
EN

PUSH PULL
STOP START
HATS To 1CR Relay
110VAC

CR CR
 EP 20-30 ESP SD (1 of 2)

Contact Contact
1TD Contact

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
To 1TD Relay
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
C To 2M Contact

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD 1M
NC Contact
LED 1 SEQ
1M 0 VAC
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
RELEASED 05/Jun/2018 16:59:56 GMT

2 READY

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 EP 20-30 ESP SD (2 of 2)

80443864 Rev. E EN-91


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND SMALL RECIPROCATING AIR COMPRESSORS


FOR ALL COMPRESSORS:
• Compressors to be connected must have automatic Start / Stop capability .

DRAWING NOTES FOR PRESSURE SWITCH CONTROLLER MACHINES:


• Ensure each compressor is equipped with independent Excessive Pressure Shutdown Switch. An increase in pressure
differential across air treatment equipment can result in excess compressor discharge pressure. See Apendix A Page 70 and
71 for application drawings. In most applications, the model and type of pressure switch supplied with the compressor can
be used as the Excessive Pressure Shutdown Switch. If this is specific model/type of pressure switch is not readily available,
any pressure switch can be utilized as long as it equals or exceeds the specifications of the pressure switch found on the
compressor.
• Set the Excessive Pressure Shutdown Switch to “OPEN” 5 PSI less than the maximum discharge pressure recommended by
the compressor manufacturer.
• Note: R1 and R2 Relay -IR CCN: 39403290
• Note: R1 and R2 Relay Base – IR CCN: 39125091

EN-92 80443864 Rev. E


80443864 Rev. E
X - SERIES AUTOMATION
COMPRESSOR #1 SS
+VDC ON OFF To M
X01 TERMINAL
C01 VFD/fixed To ETM
V1 V V 110VAC
Load Enable
1 1 SEQ CONT
Load/Unload
2 2 LOAD UNL LOLS
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
 UP6RE 7.5–15 175, UP6RX 7.5–15 175 (1 of 3)

LED 5 VFD P

IN
C
LED 2 LOAD
NC
LED 1 SEQ
OL
Contact
ALARM

LED 4
RUN
0 VAC

READY
LED 3
C05 M
C04 RUN
1
2 READY

IR-PCB
RELEASED 05/Jun/2018 16:59:56 GMT

UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-93
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6RE 7.5–15 175, UP6RX 7.5–15 175 (2 of 3)

EN-94 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 UP6RE 7.5–15 175, UP6RX 7.5–15 175 (3 of 3)

80443864 Rev. E EN-95


EN-96
EN

X - SERIES AUTOMATION
COMPRESSOR #1 SS
+VDC ON OFF
X01 TERMINAL
HATS To M
C01 VFD/fixed X1
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload LOLS
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
 Models (231, 7T2, 7T4, 15T2) 3 Phase

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD P

IN
C
LED 2 LOAD
NC
LED 1 SEQ
OL
Contact
ALARM 0 VAC

LED 4
RUN

READY
LED 3
X2
C05 M
C04 RUN
1
2 READY

IR-PCB
RELEASED 05/Jun/2018 16:59:56 GMT

UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Models (231, 7T2, 7T4, 15T2) 3 Phase

80443864 Rev. E EN-97


EN-98
EN

X - SERIES AUTOMATION
COMPRESSOR #1 SS
+VDC ON OFF
X01 TERMINAL
HATS To M
C01 VFD/fixed L1
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload LOLS
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12
NC R2
6 6 +20V C02
NO
LED 5 VFD P

IN
C
LED 2 LOAD
NC
LED 1 SEQ
 Models 2340, 2475, 2545, 7100, 15T & 3000 (1 of 3)

ALARM

LED 4
RUN

READY
LED 3
To Customer Supplied
C05
C04 RUN External Neutral
1
R1
2 READY To Customer Supplied
External 110VAC
IR-PCB R2
OL
Contact
L2
M
RELEASED 05/Jun/2018 16:59:56 GMT

R1
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Models 2340, 2475, 2545, 7100, 15T & 3000 (2 of 3)

80443864 Rev. E EN-99


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Models 2340, 2475, 2545, 7100, 15T & 3000 (3 of 3)

EN-100 80443864 Rev. E


80443864 Rev. E
Restart TD
MOL HATR Relay
E-STOP Contact SS Contact Contact

110VAC

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V
Load Enable
1 1 SEQ CONT
Load/Unload To TM2 Relay
2 2 LOAD UNL P To KM1 Contact
3 3 GND C03
NO
4 4 D11
To KM2 Contact
C

OUT
5 5 D12
NC
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

KM1 0 VAC
KM1 Relay
ALARM Contact
SSR UP5 11-22 SD

LED 4
RUN

READY
LED 3
C05
C04 RUN
 Excessive Pressure Shutdown Switch Example Before Installation

1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-101
EN

EN-102
Restart TD
MOL HATR Relay
E-STOP Contact SS Contact Contact

110VAC

X - SERIES AUTOMATION
COMPRESSOR #1
+VDC
X01 TERMINAL
C01 VFD/fixed
V1 V V To TM2 Relay
Load Enable
1 1 SEQ CONT To KM1 Contact
Load/Unload
2 2 LOAD UNL P
3 3 GND C03
NO To KM2 Contact
4 4 D11
C

OUT
5 5 D12 Excessive
NC
6 6 +20V C02 Pressure
NO Shutdown
LED 5 VFD Switch

IN
C
LED 2 LOAD
NC
LED 1 SEQ

KM1 0 VAC
KM1 Relay
ALARM Contact
SSR UP5 11-22 SD

LED 4
RUN

READY
LED 3
C05
 Excessive Pressure Shutdown Switch Example After Installation

C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

APPENDIX D - IR-PCB TO INGERSOLL RAND NON-NIRVANA VSD COMPRESSOR


INTERCONNECT DRAWINGS
 Wiring The VSD Box To The Ingersoll Rand Non-Nirvana VSD

VSD Box
XPM-Ao2
4-20mA(1)

ANA1

ANA1
X07

+
25 26 27 28 29 30
#1
X02

Pressure
Transducer

+VDC
+
-
Signal

Case Ground
NOTE: Case ground is no longer used on transducers shipped in 2016 or later

+VDC
+24 13
Signal
A1 60
IR-5000
COM 55

39

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E EN-103


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-302 DISCHARGE (DELIVERY) PRESSURE SENSOR INTERCONNECT

NOTE: It is preferred to use the VSD B Box kit instead of the VSD mA Box kit when connecting to an Intellisys controlled
machine. Refer to Appendix A page A3 for SG controllers, or page A4 for SE controllers. Make sure you use code 1215 in the VSD
Box to set it to “Type B”. Set the VSD Box address to match the ir-485 address.

EN-104 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB Interconnect To Ingersoll Rand Second Generation IntelliSys “SG” Controlled


Compressors
FOR SG INTELLISYS CONTROLLED MACHINES:
• When using the X8I or X12I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred”
method when interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and
Nirvana 15-30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
• When using the X4I Automation System, the ir-PCB is the “recommended and preferred” method when interfacing and
connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP)
Compressors. See Appendix B for interconnect drawings for these applications.
Note: the X4i will NOT be able to trim the VFD capacity up and down smoothly, and X8i or X12i is preferred for VFD drives.
• The ‘SEQUENCER’ setting of the Intellisys controller must be set to ‘ON’.
• Remote Start / Stop must be set to “OFF”.
• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation or ACS.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
• FOR SIERRA SG INTELLISYS CONTROLLERS, the SI1 interface (CCN: 42425710) can be used as an alternative to allow the
SG Controller to be sequenced/controlled by the X -Series Automation
DRAWING NOTES FOR SG INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full Voltage wiring, the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys P1-2 terminal.

80443864 Rev. E EN-105


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Ingersoll Rand Intellisys Controlled VSD Compressors To VSD Interconnect (1 of 2)


SG SSR
NOTE: the drawing below is for utilizing a VSD mA Box kit, which is no longer the best way. Since 2010, a “VSD B Box” kit is the
proper way to connect an Ingersoll Rand fixed speed machine with Danfoss external drive to and X8i or X12i.

Remote Load/Unload
Remote Load Enable

Intellisys SG
P1

P1
P3

P1

P!
P2
25
26
27
28

1
2

3
2
1
1Sb

1ATS
1ATS
XCR

1M

E-STOP
Blowdown

E-STOP
To Existing

Solenoid
2CR Relay

110VAC
0VAC

110VAC

Alternate Connection Metthod For


READY Input If Alarm Contacts Are
XCR

READY
Being Used
C

C
NO

NO
NC

NC
Load/Unload
C01 VFD/fixed

RUN
+VDC

ALARM
Load Enable

READY

OUT IN
C04
C02

IR-PCB

LED 3
RUN
LED 2 LOAD
C03
LOAD UNL
SEQ CONT

LED 5 VFD

LED 1 SEQ
+20V

LED 4
GND
D11
D12

READY
V
1
2
3
4
5
6

2
V

1
C05
X01 TERMINAL
VSD BOX

V1
1

3
4
5
6
2

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

EN-106 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 VSD Box Interconnect To Ingersoll Rand Intellisys SG Controlled VSD Compressors (2 of 2)


WIRING SCHEMATIC FOR SSR 100-500 HP(75-450KW)
STAR DELTA, AIRCOOLED(1 OF 2)

80443864 Rev. E EN-107


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND SECOND EDITION INTELLISYS “SE” CONTROLLED COMPRESSORS
FOR ALL SE INTELLISYS CONTROLLED MACHINES:
• When using the X8I or X12I Automation System, the ir-485 and irV-485 Gateway is the “recommended and preferred”
method when interfacing and connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and
Nirvana 15-30KW (20-40HP) Compressors. See Appendix A for interconnect drawings for these applications
• When using the X4I Automation System, the ir-PCB is the “recommended and preferred” method when interfacing and
connecting to the FG (redeye), SG, SGN and SGNe, SE IntelliSys controlled compressors and Nirvana 15-30KW (20-40HP)
Compressors. See Appendix B for interconnect drawings for these applications.
• The ‘SEQUENCER’ setting of the Intellisys controller must be set to ‘ON’.
• Remote Start / Stop must be set to “OFF”.
• Auto Restart must be turned ‘ON’ to allow the machines to stop in Auto restart when unloaded by the X -Series Automation.
• The Intellisys must be run in the Online/Offline regulation mode. Do not use Modulation or ACS.
• Check the Intellisys software revision level. Always update to the latest revision prior to operation.
FOR UP SE INTELLISYS CONTROLLERS,
Minimum Software Version 1.11
CCN: 39217047 (w/o PORO)
CCN: 39217039 (w PORO)

When installing the Sequence Option to enable Remote Load/Unload, the Remote Start/Stop input terminals are now used for
the Remote Load inputs. Remote Start Stop will no longer be functional. The SI1 interface (CCN: 42425710) can be used in place
of the Sequence Option to allow the SE controlled machines to function with both Remote Load Unload and Remote Start
Stop.
Software Version 1.20 and Greater

The ‘CONTACT SEQUENCE’ setting of the Intellisys controller must be set to ‘ON’.
DRAWING NOTES FOR UP SE INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full voltage wiring the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys J5-1 terminal.
• Note: For Pegasus machines wiring may be factory installed connecting the Intellisys Alarm Relay J5-9, J5-10 and J5-11 to a
terminal strip but unused. Remove any factory installed wiring from the Intellisys Alarm Relay contacts and connect the X
-Series Automation Interface board wiring directly to the Intellisys Alarm Relay terminals J5-9 and J5-10.
FOR ESA SE INTELLISYS CONTROLLERS, the ‘SEQUENCER Option’ must be purchased. installed and then turned on.
Minimum Software Version 1.40
CCN: 39217047 (w/o PORO)
CCN: 39217039 (w PORO)

When installing the Sequence Option to enable Remote Load/Unload, the Remote Start Stop input terminals are now used for
the Remote Load inputs. Remote Start Stop will no longer be functional. The SI1 interface (CCN: 42425710) can be used in place
of the Sequence Option to allow the SE controlled machines to function with both Remote Load Unload and Remote Start
Stop.
DRAWING NOTES FOR ESA SE INTELLISYS CONTROLLED MACHINES:
• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full voltage wiring the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys J5-1 terminal.
FOR DSA SE INTELLISYS CONTROLLERS, the ‘SEQUENCER Option’ must be purchased. installed and then turned on.
CCN: 22179238

When installing the Sequence Option to enable Remote Load/Unload, the Remote Start Stop input terminals are now used for
the Remote Load inputs. Remote Start Stop will no longer be functional. The SI1 interface (CCN: 42425710) can be used in place
of the Sequence Option to allow the SE controlled machines to function with both Remote Load Unload and Remote Start
Stop.

EN-108 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

DRAWING NOTES FOR DSA SE INTELLISYS CONTROLLED MACHINES:


• Note: For Star Delta starter wiring the X -Series Automation Run signal should be connected directly to the 1M coil.

• Note: For Full Voltage wiring, the 1S (1Sb) interlock will not be used. The X -Series Automation Run signal can be connected
directly to the Intellisys terminal 42.
FOR SIERRA SE INTELLISYS CONTROLLERS, the SI1 interface (CCN: 42425710) must be used to allow the SE Controller to be
sequenced/controlled by the X -Series Automation

80443864 Rev. E EN-109


EN

EN-110
 SE UP (1 of 2)

X - SERIES AUTOMATION J1
COMPRESSOR #1 Remote Load/Unload
+VDC 11
X01 TERMINAL (was Remote Start)
C01 VFD/fixed 12
V1 V V Remote Enable
Load Enable 13 (was Remote Stop)
1 1 SEQ CONT
Load/Unload 14
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C To Existing

OUT
5 5 D12
NC 1SV
6 6 +20V C02 3SV
NO 2CR Relay
LED 5 VFD J5

IN
C
LED 2 LOAD 4
NC
LED 1 SEQ
XCR
XCR J5
0VAC 1M 1
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
J5
2 READY
110VAC 7
E-STOP
IR-PCB
J5
9
10
RELEASED 05/Jun/2018 16:59:56 GMT

11 Intellisys SE
UP Series

J5
110VAC 7
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SE UP (2 of 2)
WIRING SCHEMATIC UP6-20 TO UP6-30
FULL VOLTAGE, INTELLISYS

80443864 Rev. E EN-111


EN

EN-112
 SE ESA (1 of 2)

X - SERIES AUTOMATION J1
COMPRESSOR #1 Remote Load/Unload
+VDC 11
X01 TERMINAL (was Remote Start)
C01 VFD/fixed 12
V1 V V Remote Enable
Load Enable 13 (was Remote Stop)
1 1 SEQ CONT
Load/Unload 14
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12 To Existing
NC 1SV
6 6 +20V C02 3SV
NO
2CR Relay
LED 5 VFD

IN
C J5
LED 2 LOAD
NC 4
LED 1 SEQ
XCR
XCR J5
0VAC 1M 1
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
J5
2 READY 110VAC 7
MCB2 HAT E-STOP
IR-PCB
J5
9
10
RELEASED 05/Jun/2018 16:59:56 GMT

11 Intellisys SE
ESA Series

J5
110VAC 7
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SE ESA (2 of 2)
WIRING SCHEMATIC UP6-40 TO UP6-50-PE
FULL VOLTAGE, INTELLISYS

80443864 Rev. E EN-113


EN

EN-114
 SE DSA (1 of 2)

X - SERIES AUTOMATION J1
COMPRESSOR #1 Remote Load/Unload
+VDC 6 (was Remote Start)
X01 TERMINAL
C01 VFD/fixed 5
V1 V V Remote Enable
Load Enable 4 (was Remote Stop)
1 1 SEQ CONT
Load/Unload 3
2 2 LOAD UNL
3 3 GND C03
NO
4 4 D11
C To Existing

OUT
5 5 D12
NC 1SV
6 6 +20V C02 3SV
NO 2CR Relay
LED 5 VFD J5

IN
C
LED 2 LOAD 39
NC
LED 1 SEQ
XCR
XCR J5
0VAC 1M 42
ALARM

LED 4
RUN

READY
LED 3
C05
C04 RUN
1
J5
2 1ATS
READY 36
110VAC
E-STOP
IR-PCB
J5
34
33
RELEASED 05/Jun/2018 16:59:56 GMT

Intellisys SE
32 DSA Contact
Cooled

J5
110VAC 38
Alternate Connection Metthod For E-STOP
READY Input If Alarm Contacts Are
Being Used

READY

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 SE DSA (2 of 2)
WIRING SCHEMATIC FOR SSR 50E-100HP (37-75KW)FULL VOLTAGE, AIRCOOLED

80443864 Rev. E EN-115


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 IR-PCB INTERCONNECT TO INGERSOLL RAND PRESSURE SWITCH CONTROLLED COMPRESSORS


FOR ALL COMPRESSORS:
• Compressors to be connected must have automatic Start / Stop capability .

• Use the VSD mA Box kit for all pressure switch compressors with external Danfoss drives. Also addition of a Speed Kit is
necessary for the X8i or X12i to trim the VFD capacity properly.
DRAWING NOTES FOR PRESSURE SWITCH CONTROLLER MACHINES:
• Ensure each compressor is equipped with independent Excessive Pressure Shutdown Switch. An increase in pressure
differential across air treatment equipment can result in excess compressor discharge pressure. See Appendix A, Page 70
and 71 for application drawings. In most applications, the model and type of pressure switch supplied with the compressor
can be used as the Excessive Pressure Shutdown Switch. If this is specific model/type of pressure switch is not readily
available, any pressure switch can be utilized as long as it equals or exceeds the specifications of the pressure switch found
on the compressor.
• Set the Excessive Pressure Shutdown Switch to “OPEN” 5 PSI less than the maximum discharge pressure recommended by
the compressor manufacturer.

EN-116 80443864 Rev. E


80443864 Rev. E
Restart TD
HATR Relay
E-STOP COL ON OFF Contact Contact

110VAC

VSD BOX
X01 TERMINAL +VDC
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO To 1SV
4 4 D11
C To 3SV

OUT
5 5 D12
NC To 2CR
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

XCR
ALARM
SSR UP6 20-30 FV

LED 4
RUN
110VAC

READY
LED 3
C05 XCR M 0 VAC
C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load
 Ingersoll Rand Pressure Switch Controlled VSD Compressors To VSD Interconnect (1 of 2)

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-117
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Ingersoll Rand Pressure Switch Controlled VSD Compressors To VSD Interconnect (2 of 2)


WIRING SCHEMATIC UP6-20 TO UP6-30
FULL VOLTAGE, NON-INTELLISYS

EN-118 80443864 Rev. E


80443864 Rev. E
Restart TD
HATR Relay
E-STOP COL ON OFF Contact Contact

110VAC

VSD BOX
X01 TERMINAL +VDC
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO To 1SV
4 4 D11
C To 3SV

OUT
5 5 D12
NC To 2CR
6 6 +20V C02
NO
LED 5 VFD

IN
C
LED 2 LOAD
NC
LED 1 SEQ

XCR
ALARM
SSR UP6 20-30 FV

LED 4
RUN
110VAC

READY
LED 3
C05 XCR M 0 VAC
 Excessive Pressure Shutdown Switch Example Before Installation

C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.
EN

EN-119
EN

EN-120
Restart TD
HATR Relay
E-STOP COL ON OFF Contact Contact

110VAC

VSD BOX
X01 TERMINAL +VDC
C01 VFD/fixed
V1 V V
Load Enable To TR Relay
1 1 SEQ CONT To M Contact
Load/Unload
2 2 LOAD UNL
1PS
3 3 GND C03
NO
4 4 D11
C

OUT
5 5 D12 To 1SV
NC To 3SV
6 6 +20V C02 Excessive
NO Pressure To 2CR
LED 5 VFD Shutdown

IN
C
LED 2 LOAD Switch
NC
LED 1 SEQ

XCR
ALARM
SSR UP6 20-30 FV

LED 4
RUN
110VAC

READY
LED 3
C05 XCR M 0 VAC
 Excessive Pressure Shutdown Switch Example After Installation

C04 RUN
1
2 READY
RELEASED 05/Jun/2018 16:59:56 GMT

IR-PCB
UnLoad

1PS Load

To Avoid Potential Wiring Issues, Always Break / Make ir-PCB


Wire Connections At The Pressure Switch Or Cut / Splice The
Actual Pressure Switch Wires
Wire Per The Above Schematic

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E
RELEASED 05/Jun/2018 16:59:56 GMT

EN

 CMC Sierra (1 of 2)

Remote Load/Unload
Remote Load Enable

CMC
BCM

+24VDC
Terminal
Strip

2TB

2TB

2TB

1TB

1TB
1

5
1CR-A
4CR Relay

1M
1SV
To

1TB12
C

C
NO

NO
Load/Unload

NC

NC
C01 VFD/fixed

RUN
+VDC

ALARM
Load Enable

READY

OUT IN
C04
C02

IR-PCB

LED 3
RUN
LED 2 LOAD
C03
LOAD UNL
SEQ CONT

LED 5 VFD

LED 1 SEQ
+20V

LED 4
GND
D11
D12

READY
V
1
2
3
4
5
6

2
V

1
C05
X - SERIES AUTOMATION
COMPRESSOR #1
X01 TERMINAL

V1
1

3
4
5
6
2

The CMC Controller must be updated with Release Version 1.42 or greater. The file can be found on the
ServiceNet. Select Centrifugal, then select CMC Files, then select V320. The Executable file is 22458368.exe

Guidance only; connections may differ with date, model, type, variant, special, custom or concession builds.
This information is intended to be used in conjunction with the compressor’s original control circuit diagram.

80443864 Rev. E EN-121


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 CMC Sierra (2 of 2)

EN-122 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Interconnection of a VSD B Box kit to Xe-M rotary fixed speeds with Danfoss external drive
This article applies to the following Xe-90M and Xe-145M Fixed Speed compressors retrofitted with a Bolt-On VSD Drive and
VSD-B Box:
• R Series Xe-90M Contact Cooled

• R Series Xe-145M Contact Cooled


• Large SSR Xe-90M Contact Cooled
• Large SSR Xe-145M Contacted Cooled
• Sierra Xe-90M Oil Free
• Sierra Xe-145M Oil Free
• VSD-B Box CCN: 23410780
Modifications in this software version were limited to the following:
1. Increase Modbus response delay by ~15ms (provide proper response to the gateway)
2. Added specific Modbus registers required for gateway interface (allows master to see the controller correctly)
3. Addition of a “Gateway” selection setting within Factory Settings (toggle gateway options for proper integration)
4. Modified program to separate (allow) Remote Start/Stop functionality from sequencer control (Comm Control)
NOTE: For R Series Fixed Speed, software must be revision 2.6.0 or newer.
For SSR, software must be revision 2.4.0 or newer.
For Sierra, software must be revision 2.2.0 or newer.
Refer to Tech Direct answer 2614 to download latest software revisions.
Installation:
Physical mounting and wiring of the VSD-B Box is very similar to that of installing a VSD-B Box on an SG controlled compressor
with the exception of the interconnect wiring to and from the Xe-M controller. This article is intended to supplement the VSD-B
Box Operators Manual CCN 80445505. Follow the manual for general installation instructions and commissioning procedures.
It is worth noting that VSD Boxes in general should receive power from the same power feed as the compressor control panel.
Although not mandated, it is highly recommended to interlock the compressor controller with the VSD Box using the Group
Alarm Relay. Contact Technical Support for more information on this topic.

80443864 Rev. E EN-123


RELEASED 05/Jun/2018 16:59:56 GMT

EN

Transducer, communication, and auxiliary control wiring installation is not much different between the Xe-M controller and it’s
predecessor, the SG controller. In fact, integration of the Xe-M and VSD-B Box requires use of the IR-485 gateway included with
the kit. But, the IR-485 gateway’s IRBus/Modbus port (X02/X03 Figure 1) will connect to the Xe-M controllers Modbus port (P9-
COM2).

NOTE: You must use code 1215 to modify the VSD box from type mA to type B.
NOTE 2: You must add a Speed Kit, either CCN 39266150 or CCN 39266143, for the X8i or X12i to properly trim the VFD capacity.

EN-124 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT

EN

The gateway dip switch settings are similar to those when connecting an SG controller. For R Series controller type dip switch
settings, they should be set to the SSR SG type (refer to IR-485 Operators Manual CCN 80444094). For Sierra, use Sierra SG dip
switch settings.
With the VSD-B Box and gateway installed, connected and configured properly, the Xe-M controller must be configured to
make use of the new installation. Beside the standard configuration settings required upon commissioning (refer to VSD-B Box
and IR-485 Gateway Manuals), the new Xe-M software has a “Gateway” selection field that must be Enabled to allow proper
interface and control of the compressor. Figure 3 details the Gateway selection field within the Factory Settings tab.

Once installation and configuration is complete, validation should be performed by starting or allowing the compressor to
start via the X Series Automation System. A correctly installed and configured VSD-B Box and compressor interconnection will
function integrally. As an example, a properly operating VSD-B Box will start automatically with the compressor and begin
controlling the VSD by manipulating the pressure output to the drive.

80443864 Rev. E EN-125


RELEASED 05/Jun/2018 16:59:56 GMT

EN

 Connection of VSD B-BOX to Fixed Speed Xe-M with IR302 Bolt-On Drive

EN-126 80443864 Rev. E


RELEASED 05/Jun/2018 16:59:56 GMT
RELEASED 05/Jun/2018 16:59:56 GMT

ingersollrandproducts.com
© 2018 Ingersoll-Rand