MW Items 1.12 241
Simple Excavation works associated with the carrying out of any other minor works
Comparison of [or designated exempted works
Descriptions
No excavation within “scheduled area”
Depth of excavation
> 15 m&<3m. >0.3m&<1.5m,
Other PNAP APP-48 & Supervision Code - Provision of qualified supervision
considerations| —(PNAP APP-28 for supervision in the "scheduled areas").
Construction Site (Safety) Regulations 41 ~ Safe guarding the edges of
excavation.
No additional floor area will be resulted after the excavation work
The MOE, MOA & EVA not affected,
PINAP represents Pracice Notes for Authorized Person, Regislered Sruclutal Engineers & Regislered Geotechnical Engineers;
sion Code represents Code of Practice for Site Supenvsion 2005; MOE represents means of escape in case offre;
MOA represents means of access for firefighting and rescue & EVA represenls emergency vehicular access,
2010/103.6
External Rendering, External Wall Tiles, Roof Tiles or Panel Fixed by Metal Dowels
MW Items: 1.31 2.33
‘Simple Erection, repair or removal of panel fixed by metal dowels & fixings onto a
Comparison of | wall inside a building
Descriptions [1 hest point of the panel from adjoining floor
> 10 m. >3m&<10m.
Other Fire resistance of the wall not affected.
considerations
1.31
19
2010/10