Professional Documents
Culture Documents
N
JBBS : 0.5 M
S
JBBS: 0.5 M
E
POT.
B
1 2 3 3' 4 5
9.00
1.50
Gudang JBBB : 0.5 M
1.00
FLL. +1.25
H
Dapur & R. Makan
FLL. +1.25
KOLAM RENANG
FLL. +1.17
A A
Teras
2.15
2.15
POT. POT.
G
16 17 18 19 20
K. Mandi
2.35 FLL. +1.12
2.35
15 R. Keluarga
FLL. +1.25 F
11.00
Naik
10.50
14 13 12 11 10 9 8 7 6 5 4 3 2 1
E
1.00
D
1.00
Teras
FLL. +1.22
C
GSB : 4.46 M
0.50
FLL. +1.05
5.00
Halaman Depan B
FLL. +0.20
+0.54
+0.37
+0.71
FLL. +0.88
2.50
4.46
A
FLL. +0.00
5.50 3.50
9.00
AS JALAN
3.50
POT.
SITE PLAN
W
N
JBBS : 0.5 M
S
JBBS: 0.5 M
E
POT.
B
1 2 3 3' 4 5
9.00
1.50
Gudang JBBB : 0.5 M
1.00
FLL. +1.25
H
Dapur & R. Makan
FLL. +1.25
KOLAM RENANG
FLL. +1.17
A A
Teras
2.15
2.15
POT. POT.
G
16 17 18 19 20
K. Mandi
2.35 FLL. +1.12
2.35
15 R. Keluarga
FLL. +1.25 F
11.00
Naik
10.50
14 13 12 11 10 9 8 7 6 5 4 3 2 1
E
1.00
D
1.00
Teras
FLL. +1.22
C
GSB : 4.46 M
0.50
FLL. +1.05
5.00
Halaman Depan B
FLL. +0.20
+0.54
+0.37
+0.71
FLL. +0.88
2.50
4.46
A
FLL. +0.00
5.50 3.50
9.00
AS JALAN
3.50
POT.
LAYOUT PLAN
POT.
B
1 2 3 3' 4 5
9.00
1.50
Gudang
1.00
FLL. +1.25
H
Dapur & R. Makan
FLL. +1.25
KOLAM RENANG
FLL. +1.17
A A
Teras
2.15
2.15
POT. POT.
G
16 17 18 19 20
K. Mandi
FLL. +1.12
2.35
2.35
15 R. Keluarga
FLL. +1.25 F
11.00
Naik
10.50
14 13 12 11 10 9 8 7 6 5 4 3 2 1
E
1.00
D
1.00
Teras
FLL. +1.22
C
0.50
FLL. +1.05
5.00
Halaman Depan B
FLL. +0.20
+0.37
+0.54
+0.71
FLL. +0.88
2.50
A
FLL. +0.00
5.50 3.50
9.00
POT.
B
DENAH LANTAI 1
POT.
B
1 2 3 3' 4 5
9.00
1.50
R. Cuci Shower
1.00
FLL. +4.91 FLL. +4.90
H
K. Mandi
KOLAM RENANG FLL. +4.96
1.50
A 2.15 A
POT. POT.
R. Keluarga
FLL. +4.99
0.65
G
16 17 18 19 20 21
R. Tidur Utama
Turun
FLL. +4.99
2.35
15 F
3.35
11.00
10.50
14 13 12 11
E
K. Mandi
FLL. +4.96
D
2.50
R. Tidur Anak
1.50
FLL. +4.99 Balkon
Shower FLL. +4.94
FLL. +4.90 C
B
2.50
2.50
A
1.80 3.70 3.50
9.00
POT.
B
DENAH LANTAI 2
Murda
Atap Genteng
Ikuh Celedu
Loster Beton
TAMPAK DEPAN
Murda
Atap Genteng
Ikuh Celedu
Loster Beton
Reling
TAMPAK SAMPING
Murda
Bubungan FFL +10.57
Atap Genteng
Plafond
Keramik 50x50
R. Keluarga R. Tidur Utama
FFL.+4.99 FFL.+4.99 FFL +4.99 10.57
Balok 15/40cm
Plafond
3.74
Keramik 50x50
Rabat Beton T= 10cm
Urigan Pasir Dipadatkan
Urigan Tanah Dipadatkan
Teras Teras
FFL.+1.17 FFL.+1.25 FFL +1.25
Sloof 20/50cm
1.25
Pondasi FFL ±0.00
0.60
5.10 3.90
9.00
1 3' 5
POTONGAN A-A
Murda
FFL +10.57
Bubungan
Atap Genteng 1.18
Rangka Baja Ringan
Ikuh Celedu FFL +9.39
List Plank
1.10
FFL +8.29
Ring Balok 15/20cm
Plafond
3.30
Dinding Pas Bata
Balok 15/40cm
Balok 15/40cm
Plafond
3.74
Ring Balok 15/20cm
Keramik 50x50
Rabat Beton T=10cm Dinding Pas. Bata
Urigan Pasir Dipadatkan Dapur & R. Makan R. Keluarga
Urigan Tanah Dipadatkan Teras
FFL.+1.25 FFL.+1.25 FFL.+1.22 FFL +1.25
Sloof 20/50cm
Sloof 15/30cm 1.25
Pondasi
FFL ±0.00
0.60
Pondasi
POTONGAN B-B
Keramik 50/50 cm
0.05 0.05
0.04 0.10 0.10
0.10 0.05 0.05
0.05
Sloof 20x50cm
0.40 0.40
0.32
Urugan Tanah Dipadatkan
0.35 0.35
Tanah Asli Tanah Asli
0.20 Pas. Batu Kosong 0.20 Pas. Batu Kosong
0.05 Pasir Urug 0.05 Pasir Urug
DETAIL PONDASI BATU KALI (P1) DETAIL PONDASI BATU KALI (P2)
Sloof 15x30cm
0.30
Tanah Asli
Urugan Tanah Dipadatkan
0.75
0.05 0.50
DETAIL PONDASI BATU KALI 0.55 DETAIL PONDASI BATU KALI (P3)