You are on page 1of 9

W

N
JBBS : 0.5 M

S
JBBS: 0.5 M

E
POT.
B
1 2 3 3' 4 5
9.00

3.50 0.60 1.00 0.40 3.50


J
I

1.50
Gudang JBBB : 0.5 M

1.00
FLL. +1.25

H
Dapur & R. Makan
FLL. +1.25
KOLAM RENANG

FLL. +1.17
A A

Teras
2.15

2.15
POT. POT.

G
16 17 18 19 20
K. Mandi
2.35 FLL. +1.12

2.35
15 R. Keluarga
FLL. +1.25 F
11.00

Naik

10.50
14 13 12 11 10 9 8 7 6 5 4 3 2 1
E

1.00
D

1.00
Teras
FLL. +1.22
C
GSB : 4.46 M

0.50
FLL. +1.05
5.00

Halaman Depan B
FLL. +0.20

+0.54
+0.37

+0.71
FLL. +0.88

2.50

4.46
A
FLL. +0.00
5.50 3.50
9.00

AS JALAN
3.50

POT.

SITE PLAN
W

N
JBBS : 0.5 M

S
JBBS: 0.5 M

E
POT.
B
1 2 3 3' 4 5
9.00

3.50 0.60 1.00 0.40 3.50


J
I

1.50
Gudang JBBB : 0.5 M

1.00
FLL. +1.25

H
Dapur & R. Makan
FLL. +1.25
KOLAM RENANG

FLL. +1.17
A A

Teras
2.15

2.15
POT. POT.

G
16 17 18 19 20
K. Mandi
2.35 FLL. +1.12

2.35
15 R. Keluarga
FLL. +1.25 F
11.00

Naik

10.50
14 13 12 11 10 9 8 7 6 5 4 3 2 1
E

1.00
D

1.00
Teras
FLL. +1.22
C
GSB : 4.46 M

0.50
FLL. +1.05
5.00

Halaman Depan B
FLL. +0.20

+0.54
+0.37

+0.71
FLL. +0.88

2.50

4.46
A
FLL. +0.00
5.50 3.50
9.00

AS JALAN
3.50

POT.

LAYOUT PLAN
POT.
B
1 2 3 3' 4 5
9.00

3.50 0.60 1.00 0.40 3.50


J
I

1.50
Gudang

1.00
FLL. +1.25

H
Dapur & R. Makan
FLL. +1.25
KOLAM RENANG

FLL. +1.17
A A

Teras
2.15

2.15
POT. POT.

G
16 17 18 19 20
K. Mandi
FLL. +1.12
2.35

2.35
15 R. Keluarga
FLL. +1.25 F
11.00

Naik

10.50
14 13 12 11 10 9 8 7 6 5 4 3 2 1
E

1.00
D

1.00
Teras
FLL. +1.22
C

0.50
FLL. +1.05
5.00

Halaman Depan B
FLL. +0.20
+0.37
+0.54
+0.71
FLL. +0.88

2.50
A
FLL. +0.00
5.50 3.50
9.00
POT.

B
DENAH LANTAI 1
POT.
B
1 2 3 3' 4 5

9.00

3.00 2.50 1.75 1.75


J
I

1.50
R. Cuci Shower

1.00
FLL. +4.91 FLL. +4.90

H
K. Mandi
KOLAM RENANG FLL. +4.96

1.50
A 2.15 A
POT. POT.
R. Keluarga
FLL. +4.99

0.65
G
16 17 18 19 20 21
R. Tidur Utama

Turun
FLL. +4.99
2.35

15 F

3.35
11.00

10.50
14 13 12 11
E

K. Mandi
FLL. +4.96
D
2.50

R. Tidur Anak

1.50
FLL. +4.99 Balkon
Shower FLL. +4.94
FLL. +4.90 C
B
2.50

2.50
A
1.80 3.70 3.50
9.00
POT.

B
DENAH LANTAI 2
Murda

Atap Genteng
Ikuh Celedu

Plat Tampyas Finish Cat


Plat Tampyas Finish Cat

Tembok Finish Cat


Reling Balkom

Pas. Paras/Batu Jogya Putih 20/40

Pas. Paras/Batu Jogya Putih 20/40

Pas. Paras/Batu Jogya Putih 20/40

Loster Beton

Kayu Finish Polituran


Anak Tangga Batu Alam
Kolom Finish Cat

TAMPAK DEPAN
Murda

Atap Genteng
Ikuh Celedu

Plat Tampyas Finish Cat Plat Tampyas Finish Cat

Loster Beton

Reling

Anak Tangga Batu Alam

Kolom Finish Cat

Gril Kayu 5/14

TAMPAK SAMPING
Murda
Bubungan FFL +10.57
Atap Genteng

Rangka Baja Ringan 1.18


Ikuh Celedu FFL +9.39
List Plank
1.10
FFL +8.29
Ring Balok 15/20cm

Plafond

Dinding Pas Bata 3.30

Keramik 50x50
R. Keluarga R. Tidur Utama
FFL.+4.99 FFL.+4.99 FFL +4.99 10.57

Balok 15/40cm

Plafond

3.74

Keramik 50x50
Rabat Beton T= 10cm
Urigan Pasir Dipadatkan
Urigan Tanah Dipadatkan
Teras Teras
FFL.+1.17 FFL.+1.25 FFL +1.25

Sloof 20/50cm
1.25
Pondasi FFL ±0.00

0.60

5.10 3.90
9.00
1 3' 5

POTONGAN A-A
Murda
FFL +10.57
Bubungan
Atap Genteng 1.18
Rangka Baja Ringan
Ikuh Celedu FFL +9.39
List Plank
1.10
FFL +8.29
Ring Balok 15/20cm

Plafond

3.30
Dinding Pas Bata

FFL. K. Mandi R. Tidur Utama Balcon


FFL.+4.96 FFL.+4.99 FFL +4.99 10.57
+4.90 FFL.+4.94

Balok 15/40cm

Balok 15/40cm
Plafond

3.74
Ring Balok 15/20cm

Keramik 50x50
Rabat Beton T=10cm Dinding Pas. Bata
Urigan Pasir Dipadatkan Dapur & R. Makan R. Keluarga
Urigan Tanah Dipadatkan Teras
FFL.+1.25 FFL.+1.25 FFL.+1.22 FFL +1.25

Sloof 20/50cm
Sloof 15/30cm 1.25
Pondasi
FFL ±0.00

0.60
Pondasi

3.29 3.35 4.00


10.64
J I G D A

POTONGAN B-B
Keramik 50/50 cm

Sloof 20x50cm Rabat Beton T = 10cm

Keramik 50/50 cm Urugan Pasir Dipadatkan


Rabat Beton T = 10cm
0.10 0.20
Urugan Pasir Dipadatkan
0.05 0.20 0.05

0.05 0.05
0.04 0.10 0.10
0.10 0.05 0.05
0.05
Sloof 20x50cm
0.40 0.40
0.32
Urugan Tanah Dipadatkan

Urugan Tanah Dipadatkan


0.65 0.65 0.65

Pondasi Batu Kali Pondasi Batu Kali

0.35 0.35
Tanah Asli Tanah Asli
0.20 Pas. Batu Kosong 0.20 Pas. Batu Kosong
0.05 Pasir Urug 0.05 Pasir Urug

0.05 0.70 0.05 0.10 0.15


0.05 0.70
0.80 0.75

DETAIL PONDASI BATU KALI (P1) DETAIL PONDASI BATU KALI (P2)
Sloof 15x30cm
0.30

Tanah Asli
Urugan Tanah Dipadatkan
0.75

Pondasi Batu Kali

0.20 Pas. Batu Kosong


0.05 Pasir Urug

0.05 0.50
DETAIL PONDASI BATU KALI 0.55 DETAIL PONDASI BATU KALI (P3)