SDLC - System/ Software Development Life -Wca work centered analysis-

Cycle aka Waterfall Model/ Classical Model proponent: steven alter


Phase 1: Analysis - What do we need to - Work of the information
do? analyst
Phase 2: Design - How do we do it? - Bpr - help in framing an
Phase 3: Implementation - Lets do it! approach for rethinking the
Phase 4: Testing - Were we able to do it? business in a creative way
Phase 5: Maintenance - Are there some business process
more work to do? Any rooms for reengineering)
improvement? 3. Analyzing system needs
- Tools: dfd (data flow diagram)
Activity Planning and Control - Analyzes the structured decisions
Steps made
1. Identify problems, opportunities and - Prepares a system proposal
objectives 4. Designing the recommended system
- critical to success for the rest of the - the analyst designs accurate data
project entry procedures so that data going
- problem s will be brought up by into the is is correct
ememe - Designing files or databases
- Allow the business gain competitive - Design controls and backup
advantage procedures to protect the system
Output: Feasibility report and data
(containing a problem definition and Eme eme
summarizing the objectives) feasible/not
feasible Systems flowcharting
2. Determining info requirements Flowcharting- a graphical method of
Tools: interviewing., sampling, investigating illustrating the step by step solution of a
hard data, questionnaires,observation problem
- Striving to understand hat info user
needs to perform their job Program flowchart - programmers
- Information analyst- specialist System flowchart/ process flowchart -
- Know the details of the graphic rep of the steps and procedures
current system
- Who- people involved System Flowchart Symbols
- What the business
activity
- Where the
environment it takes
place
- When- the timing
- How the current
procedures are
performed
- Official receipt, delivery receipt,
invoice
- Manual database: name eme

Annotation is jus description

flowchart
Include process participants in the heading

Computerized manual

5. Developing and documenting system analyst- make an is plan


is plan is a project

control
take appropriate action to expedite ( crash/
speed up)
resched activities to finish on time

implementation
buy erp
outsource (freelance programmer)
come up with own it dept

system design
designing effective output
output any useful info/data delivered to user
designing effective input
should

steps in drawing dfd


draw the context diagram
draw the diagram 0
show all the child diagram
convert logical dfd to physical dfd
- manual semi—-> fully automated

rule :
there will only be one process
many data entities and data flows
data store not allowed