You are on page 1of 6
2. KALIKA RIGSAR JOINT VENTURE |) P.0-BoxNot 113, Kota Shopping Cente, Trashigang, Bhutan ¥ Tol: 975-4621 132, +075-17111899 and Fax: O75-4-521212 E-mail kalkarigsariv@gmall.com Info@kalicagroup com \winl 17 uly 2023 The Engineer's Representatve/ Team Leader Mis Egis International JV with Egis (India) and Gyelishen Consultancy as Sub-Censultants Phuentsholing Township Development Project ‘Toorse, Phuntsholing. Kind Attention: Me. Nicolas Flamant / Team Leader Project: Construction of Common Urban Infrastrectures, Zone A, Phuentholing Township Development Project (PTDP), Phuentsling Bhutan (Package: CW-2A) Sub: Submission of CV for Key personnel - Mechanical Engineer. Reference: PIDP/KR-JVi01/2023/380, dated 16/05/2023 Dear Sir, With reference to the above subject, we are herewith submitting the CV of the Key personnel MrShrin Venkatesh Karveer Mechanical Engineer as per the contract under Engineers ‘equirement Clause 6.1 for your review and appeova Assuring you our best services always ‘Thanking you, Yours sincerely, Project Manager| ce: 1. PIU/Projest Director for kind information. 2. PIU/Project Manager fr kind information 3. PIC/Deputy Team Leader for kind information RESUME Name: Shera V Karveer Ph no “61-9002616263 E-mail shiral karveer@omai com ‘Experience and Skis Hight slate and dedicated water supply engineer wth professional expeence of 10 years and having 2 stong background in water resource management an nasi, Seokng a chalenging positon {outle my expertise in ensuing he eftsent ana sustanabia devary of Sean waters conics, while aéressing envenmental cansieratens and promoting water conservation. Saund KNowedge in poet executon,montoring, oparaten. and maintenance of urban and rural wat supply yet, Profelency in peroming” water aud, reduction of nonevenue. water and pele two ‘management system, ‘iar supply Management & Non-Reverua Water Managemert 1a years Terauaion*( Meehan Engineering tom Gaps Insts of | retin ___ Test FossGrduten | Wet ant Wastewater Engnoome (Dimerstanal Academy) Totalyenrs ofexperionce [1Oyeas Name cttheenployer__Kalpstars Powe Intemational Limited | Poston bls [Leeaton Erpenenca ct of ho enBe mpoyment npomment Postion held ‘eesbon perio are of te oy | Postion held Tecaton [in anda, Sangre, Oavenger=) | [Bernas arch 2016 Feb-2021 | [Name of the employer Larsen & Toubro (ECC Division) | Pee Ur an pene nd ania ras! Tacaton ina (gate) | Exserene Jan 2014 March 2078 RESUME Name: Shia) V Karveer Ph no 61-9902416263 mall ~ shai karveertamallcom Project etal: A Project woth 180 crores which Involves —The pipe replacement and operation “and maintenance for he period of 10 years, forthe Burhanpur ditt ety. Duration: Jan 2023 tt date ‘lent saya Pradesh Urban Development Co, Ltd Roles and Responsibilities: ‘+ Responsible fr Condon assessment of existing water supty dtrbuton sate covering ‘wat supply components such an, intake wal WTP, ppeines. Coveted series reserves Buk metering. ana other water supply appurtenant incu, pumping machineries, pumps ‘Stators for Buthanpu un areas (12 Nos Zones), ‘Involved inthe Operaton and Maintonance of water supply sytem forthe ey, + Roviw Contract bigs eros Analyze water supply systems, evaluating water demand and developing srg for Sustanable water management ‘+ Colatoraion wn foc’ authartes and communes to develop and plant water Conservation intatives, ele In rican reduction in wat wastage + Lesd me team of engraers fore sect Now of work and project completion as per Tors. Project Deals: A grant project worth 400 Euro's which Involves Technologies & engineering solutions for sustainable water los control and reduction on Water Supply Systems inthe Kingdom of Bhutan. Duration: Feb-2021 to Dee-2022 Client: Minit of Works & Human Setlement (MoWHS), Thimphu Bhutan Role and Responsibilities: ‘+ Responsible for Condition aseossment of exisng water supply dstibuton system covering ater supply compenens such as pipelines, Elevated sorvoe reserva, PUpIng Stations, pumping machineries, WP's and oer water suppl appurtenant fosThimphs luban areas (2 Ne plot aoa). ‘+ Consumers assot mapong and dota cotecton by doing house fo household uray and ‘undrstatg demand ptt of pl areas ‘+ Flow measurement forthe ESR command areas using advanced electromagnetic / ttrasone flow meters (ncusingpregrarmng) camp on and meron probe techniques, + Estimaton of Non Fevenve Water based an consumption and supply data, preparation of ator balance system as par WIA standaas and preparation of moni water balance repos frees + ldenticaion of eal losses and apparent losses based on system analyst a planning ‘iigation measure for educa loses in he sym + Trvolod in preparation Perarmance evaluation mato Key perfomance ieators and ‘montorng the repens. + Leading the eam for water Sek cetcton! rection aces using savancec lak detection instrument (Oxmic et umert). “+ Responsible for Svatege planing for roplacement of consume Water meter though study | Of ing pateme and caitraton soning methodologies 1+ Preparation of response matiees to cSont drecons in @ reosptve and custome focused ‘manner, maining echnical quay sardards and thus utlng Nghe level krouledge and |___ Sate wir cwn aoapine RESUME Name: ShriralV Karveer Ph no 81-0902416263 E-mail shir kareer@omai.com Project: A project worth Re. 635 Crores which involves laying and commissioning of water ‘mains, OHT'tehabiltation, and construction of new ONT. snd rehabitston ot water | treatment plant under the smarty project echeme for Oavanagers cy Duration: ne 2016 to February 2021 (ent: KUIDFC (Karnataka Urban Intastucture Development and Finance Corpoction) Roles and Responsibilies: “+ Responsible fr digization of assets dota using an asset mapping tol ealed Ropes for {stg 3 WTP (Water Treatment Plat, 31 NOs of OHSR (Over Head Serves Resencrs). ‘Nos ack wel ima using ropes andro applcton + Leasing a team for enddo-end execution and commssioning of water pelines rnging (4000 rm, 700mm, soomm, 480ren)D mater, HDPE (meno 250m ana saloon ‘TEM meters, House seni cannecion¢ ae pe apprved drawings ndscaines + Responsible for planing and performing hyrots! pressure tet for nowy lid watering ‘asing of pumping macnnaras& stations + Lead te team for commissioning of zones, subzones and decommissioning of old network system + Involved i performance montring ofthe subcontractors, Cnt lesoning actves ona day ‘to-day bess ané prepared reports fr neceseary approval om constants icles Project 2: project worth Rs. 250 Croros which Involves improvement of war distribution {ervices to 125 milion pooplo with the sim of supplying water to consumors 3 houts day, 7 days 2 week. Reduce water losses, Improve customer services, network rapping & 1S ‘survey for Primary Network 800 km, Secondary Network 1000 ken, Tertiary Network 4000 km ‘surveyed per zone (based on network longth inthe Zane) covering full Mumbsl Cty, enhance Involeing, and deliver general services inthe region, Cent: MOGM (Municipal Corporation of Greater Mumbai) Roles and Responsible + Response for porforming nesum leak detection tst (Patented to SUEZ in plot projet sea for 300 k's using helum mass specrometar Pater snifing ASN mode! fo detec invisible, undetected uidented aks ‘+ Operate advanced acoustic nstrumerts tke gound microphone, Istening sick, lak noise CCrrelator,Fuj noise water leak detector DNR18& noes eager odetct ivi ea, ‘+ Supervise level checks, estate dlscharge trough leaks & montoring lak epi work followed by resnspecton + Generating NRW value, reviewing and checking necessary calculations snd sesign 4 Aseistinescvng al tectncal sues for water supply and rept acte, ‘+ Provide training to personnel ivaived in leak detection operation, and maintnance eam. RESUME Name: Shia V Karveer Ph no :s1-9902416263, mall ~ shai karvzertamallcom rears Projet 1: A projct worth Rs. 350 Crore which emphasizes on studying the curt domestic water distribution network of 108 KM, considering the operations perspective, redesigning the network o reduce unaccountod supplies in the dented municipal zones, also nelides Selection of wator thet and replacing old and corroded pipes, household convections and ‘eters, and monitor the total supply to each OMA and revenue collection in each month «aleulate the water loss. Unsccounted water supply nthe cy ts nearly 50 por cout ofthe total Supply. The target i to rede thie to M6 per cen. Duration: Jan 2014 to March 2016, Cent: BWSSB (Bangalore Water Supply & Sewerage Board) Roles and Responsibilities: + Wiater main Survey ~ incudes study of ppeine elevation, ripe ameter, pipe rate umber of tranches, number of househol eonnectons, and navsehalé mele Stara (old ornew). + Review the capac ofthe water main feeder ~ Conduct flow measurement, and water pressre anaes + Coneict Pressure Zero Test (PZT) to olathe boundaries by wing wate lagers (Prmayer UK make), + Conduct network esk detection using vies tke acoustic stening sick, craton, Hydraulex (PANEZ) “+ Datrct Meters (OM) — Recommend size and specications (electromagnetic his case) of Dis, supervise instalation of DM's and provide cher puts to dengn tam asrequled sh. bates of water gem ersonal detalis: Tanguages Englah Kannada, nae Wa ] Hartt Sat Maried | Garert Reset +203, Bank Galen, Macha Garon, Bahanpur Pn Sade 450991 eran Resiial #056, Dana Nagar, Dupe Road, Near Saraswat Englah schoo! acess {Gratprabha, Pin Co 591308 hereby declare that the above information is re tothe best of my knowige DATE: 1207/2023, ‘SHRIRAJ V KARVEE RESUME Name: Shriraj V Karveor Ph no 83-9902416263 stiri karvser@amai com

You might also like