Professional Documents
Culture Documents
1644319049-GS3246 Ga1 Exp 31.07.22
1644319049-GS3246 Ga1 Exp 31.07.22
The Safety, Health & Welfare at work (General Applications) Regulations 2007
S.I. No: 299 of 2007. Amended Regulation 2012 SI No.224 of 2012
GENERAL PLANT REGULATIONS
NOTE: Each configuration should reflect the working arrangements, for example:
length of jib, fly jib, radius, angle, ballast, number of rope falls, height of hook.
Please detail the safe working loads for each configuration as per manufacturers
instructions.
Purpose of test: This is not a test. It is an examination with a load check. A test on a
machine is done when a new part is fitted or major work carried out on the electrical
or mechanical functions of the machine. A full test will take over 48 hours and is done
in accordance with manufacturers specification.
Purpose of thorough examination:………….Full safety exam
Particulars of test carried out:……………..N/A
Particulars of thorough examination carried out:… Full functional visual and safety
exam
Date of last examinations:……………… 01.08.21
Date of this examination:……………….. 01.02.22
Latest date of next thorough examination:……… 31.07.22
GA1Report of Thorough Examination (6 Monthly) continued
Serial No: GS46P - Model No: GS3246 Plant No: SL013
142748
Defect which is a danger to person: None
Repair renewal or alternation required to None required
remedy this defect:
Defect which could become a danger to No defect which could become a danger to
persons person at time of inspection
Action taken: No action to be taken
Repair, renewal or alternation required None required at time of inspection
to remedy these defects:
Date this was carried out: 01.02.22
Parts of machine not accessible for Internal of hydraulic manifold, pumps,
examination hoses, tanks & rams
Name & Address and qualification of Mr. John Donoghue T/a JD Repairs. Access
person on the report: equipment repair.
Signature:
For the person receiving form of work to be done: No work to be carried out
Results of Details of any Detail of any Name and Signature of person who
inspection further further position of made inspection
including action to be action person
defects and taken: necessary carrying out
locations: inspection:
In good No action No action Mr. John
working order required required Donoghue.
(Service
engineer)