Sediment Pond - MW-6 should be relocated towards to North to have

100m distance from dry stack footprint and tagged as


WM-PZ-3
GWM Piezometer-3 - Relocate MW-1 with distance 100m from dry stack
footprint and tagged as WM-PZ-2
(Relocated GWM well-6) - Relocate MW-10 next to the haul road to have 500m
distance from south dry stack footprint and tagged as
WM-PZ-1
- Update WM wells tags and coordinates table
- Install 2 No’s Sediment ponds discharge point of run off
water discharge points at North and South

Sediment Pond
GWM Piezometer-1
GWM Piezometer-2