Professional Documents
Culture Documents
REVISI
REVISI
BAYAR = 576.000
06.07.23 RIncian Cetakan Ds. Silam
- 5x1,5 m 1 lbr = 190.000
- 4 x 1 m (2 lbr) = 200.000
- 07.07.23
4x1 m 1 lbr = 100.000 17.07.23
- 100x180 cm 3 lbr = 135.000
Total Keseluruhan = 769.000 - 100 x 150cm 1 lbr = 40.000
Total = 1.060.000
BG KHAIRIL BINAMANG
300,000
Rincian Cetakan Ds. 4 Balai
23-Jun-23 26.06.23
- 4 x1 m 1 lbr =100.000
- 4x1 m 1 lbr = 100.000
- 2x1 m 1 lbr = 50.000 27.06.23
- 3x2 m 1 lbr = 150.000
total = 150.000
05.07.23
- 100x80 cm 2 lbr = 40.000
KAK LIA PKM KAMPA
26.06.23 Total Keseluruhan = 590.000
1,5*1,5 cm ; 60,000
BG MARWAN
858,000
BG YUDI PAK DARWIN
Rincian Cetakan PKM Bangkinang Total Keseluruhan = 250.000
- 2 x 1 m (2 lbr) = 100.000
- 60 x 80 cm = 20.000 DEVI DW
21.06.23
20.01.23 - 300x150 cm = 115.000
- 1x1,5 m = 40.000
BG SAPRIL
Tgl.23.02.23 2x1 m = 50.000
- 3x1 m 1 lbr = 75.000
03.03.23 BG IPIR
- 4 x 1 m (4 lbr) =400.000 360,000
- TBC = 150.000
14.04.23
- 4x1 m 1 lbnr = 100.000
14.04.23
- 4x1 m = 100.000
- 3x1 m 2 lbr = 150.000
17.04.23
- 3x1 m 1 lbr posko = 75.000
27.04.23
- banner bpjs 3 lbr = 75.000
Bayar TF = 500.000
Sisa = 785.000
11.05.23
- 424 x 100 cm = 110.000
26.06.23
- 4x1 m 1 lbr = 100.000