COMMISSIONING REPORT

SPRINKLER SYSTEM
CLIENT :
PMC :
PHE CONSULTANT :
DESIGN & BUILT
CONTRACTOR :
BUILDING/ AREA

Valve Status Function Remarks


Main Control Valve Open Close Pass Fail
All other Valves in main
Open Close Pass Fail
water supply
Drain valve Open Close Pass Fail
Inspection Test Valve Open Close Pass Fail
Visual Check for wetness,
Clean, Intact free from
obstruction :

Pipe work Pass Fail


Sprinkler Pass Fail
Rosette cap fixing Pass Fail
Sprinkler Charging Pass Fail
Dropper Alignment Pass Fail
Flow switch Integration Pass Fail