PROCESS & INSTRUMENTATION DRAWING

LS

V23
PG07
CITRIC HYPO
ACID
V22
80NB UPVC DP
EMF V21
pH = 7.8 - 8.0
TSS = 350 mg/l CHLORINE

6.5m3/hr
V04 V06
BOD = 250 mg/l PG01 PG02 SELF CIP PUMP DOSING

65NB UPVC
CIP TANK
COD = 500-600 mg/l CLEANING (HYPO & CITRIC) SYSTEM
PERMEATE (HYPO & CITRIC)
O&G = 50-70 mg/l NV01
FILTER
V03 V05 NV02 WATER LINE LS
(SCF) 80NB OIL SKIMMER PRIMARY TUBE
UPVC pH DO SECONDARY TUBE 80NB UPVC
HECS
TANK SETTLER MEDIA(RCC) LS
SCOPE
100NB MBR 80NB UPVC SETTLER MEDIA(RCC)
V02

6.5 CUM/HR
UPVC TANK - 1 V26 V29

65NB UPVC
EFFLUENT PG08 PG09

6.5m3/hr
INLET 70 KLD
V17 V20
LS 100NB UPVC

65NB UPVC
PG05 PG06 CHLORINE
CONTACT V25 NV07 V28 NV08
V01 RAW EFFLUENT AERATION
TANK V16 NV05 V19 TANK (RCC)
TRANSFER PUMP FLASH MIXER NV06
DRAIN V24
TANK (RCC)
LINE V15
BAR SCRREN EQUALIZATION MBR
CLIENT
CHAMBER TANK 100NB UPVC
SCOPE
180 m3/hr 100NB UPVC
OIL COLLECTION V27
TANK V18

65NB GI
MBR PERMEATE

65NB GI
PERMEATE
V31 V33 WATER LINE PUMP
PG09 PG08
V30 V32 LS
130 m3/hr

NV18 NV19 MBR


100 NB GI
100 NB GI

V08 V10
PG03 PG04 TANK -2
V07 V09
NV03 NV04

AIR BLOWER

AIR BLOWER
DEWATERING LINE TO

MBR
COLLECTION TANK

V45 V39

V55

V56
PG13 PG11

NV12 WI NV10 WI
80NB UPVC pH = 7.5 - 7.8 BWO BWO
V41 V40 V35 V34
TSS = <5 mg/l

REJECTED SLUDGE LINE

100NB UPVC
100NB UPVC
HECS BOD = <2 mg/l

3 CUM/HR
V62 V59 V52 80NB UPVC SCOPE COD = <20 mg/l ACTIVATED CARBON PRESSURE SAND

65NB UPVC
PG17 PG16 TO O&G = <2 mg/l FILTER FILTER
LS

V54

V53
GARDENING

12 CUM/HR
V51 V48 100NB UPVC
V61 V58

65NB UPVC
NV16 NV15 PG15 PG14
40NB UPVC V16 WO WO
EMF PG12 PG10
V60 V50 NV13 V47 V44 V38
PG18 V65 SLUDGE TREATED
NV14 NV11 NV09
1 CUM/HR

FILTER PRESS HOLDING WATER DRO BWI DRO


(1 CUM/HR) TANK V46 TANK (RCC)
100NB UPVC V43 V42 V37 V36
NV17 V64 CLIENT
V57 SLUDGE TRANSFER RAS SCOPE
PUMP 100NB UPVC
TRANSFER
V63
PUMP V49

SCREW PUMP

COLLECTION
NOTE: TANK

1. ALL CIVIL WORKS ARE IN CLIENT SCOPE.


REVISION TITLE: CLIENT: APPROVED/DATE

REV BY DATE DESCRIPTIONS EDIT


HECS(P)Ltd
ENGINEEING CHECKED/DATE
0 AMR 26.03.20 ISSUED FOR APPROVAL NAME DATE
PROCESS & INSTRUMENTATION DRAWING FOR M/s. GANNON DUNKERLEY & CO. LTD.,
1 AMR 08.06.20 ISSUED FOR APPROVAL DRAWN AMR 26.03.20
EFFLUENT TREATMENT PLANT - 70 KLD HYDERABAD. DESIGNED CR 26.03.20
DRAFTING CHECKED/DATE

- MBR TECHNOLOGY CHECKED CEO 26.03.20

CLASS I.D SCALE REV


IMO No.
1

DWG NO : DD - HECS - GDCL - ETP - MBR - P&ID - 001