1.1.1Foundation
detail, and the equipment shall be installed only after foundation meeting
the requirements.
1.1.2preparation
1) Before locating the equipment, clean the operation site and remove it
debris.
3) Check the quantity and quality of spare parts and fasteners of pirates
5) According to the construction needs to mark out the safe operation area,
pile foundation; The distance between the four piles; Whether the level
2. Installation process
The crane and forklift truck cooperate with the professionals to assemble
2.1 Lubricate screw threads and nut end faces of all bolts on pillars. first,
connect the pillars (4 pieces) and the upper middle connecting pipe (2
pieces) of the pillar with M16 bolts as shown in Figure 1. The bolts can
ÿÿÿÿÿÿÿ
ÿÿÿÿÿÿ
Figure 1
2.2 Connect the pillars and the middle connecting pipe (2 pieces) under
ÿÿÿÿÿÿ
ÿÿÿÿÿÿÿ
Figure2
double nuts. The pretightening torque of the first nut should be 80%, the
pretightening torque of the second nut should be 80%, and then tighten all
100%. When tightening for the last time, the pretightening torque on each
ÿÿÿÿ
Figure 3
ÿ ÿ PT ÿ ÿ ÿ ÿ
ÿ ÿ PT ÿ ÿ ÿ ÿ
ÿÿÿÿ
Figure 4
ÿÿÿ
ÿÿÿ
ÿÿÿ
Figure 5
Connect the side pull arm parts with pins and lock them with shaft clamps.
Machine Translated by Google
1ÿAfter the assembly of the whole frame, the crane will lift the bracket
professionals
2ÿAdjust the length of the support column to ensure that the total height
Of the device is 7300 mm, and the deviation does not exceed 7 mm. The
Inclination deviation between the center line of ÿ50 holes of the beam
hanger lug and the reference horizontal plane shall not exceed
1/1500 (6mm after calculation). The column installation Angle (the Angle
between the column center line and the reference horizontal plane) should
be equal and symmetric (that is, ensure that the distance between the
vertical center line and the column center line of the support components
is equal).
4ÿAdjust the supporting bolts of the flange of the horizontal rod of the
support rod and the longitudinal rod of the support rod to ensure that the
Distance between the center lines of the four support columns is 8120 mm
and 4153 mm. After the size is qualified, tighten the M16 bolts with a
plum wrench, weld and fix the support columns, and conduct
ÿÿ
Figure 6
Move the hull under the frame and the crane lifts and connects with the
hanger. Manually move the hull and visually check whether the hull can
ÿÿÿ
Machine Translated by Google
figure 7
drawing, check the alignment of the steering wheel and the bottom of it
817
ÿÿÿ
Figure 8
After the drive component is connected to the power supply, the first test
is whether the normal push, whether the normal power brake failure.
Swing 3~5 times in the no-load state to observe whether the thrust of the
drive is enough, whether the swing can reach the rated swing, whether the
Contact area between the steering wheel and the hull can reach more than
75%, if not, adjust the position of the driving parts, the tightness of the
After debugging and confirming that the driver is normal, check carefully
all parts of the device. Whether the tightness of bolts meets the
requirements; Whether the long spring and cotter pin of each shaft end
are configured and installed in accordance with the provisions; Test the
Electrical device: the main motor current is normal, the switch is sensitive
and reliable, the wire connection is firm and reliable, test the power
supply line is normal; Check whether all running parts are normal.