Sl No Description Raised qty Completed As of today Remarks Progress status
qty pending qty
1 Handover pending 10 10 0
Closeout document review report
0
29
Civil snags
4 MEP Snags 146 146 29
26
Major snags
5 ELV Snags 0 0 26
10
Handover pending
Closeout document After received the closeout 10
6
review report 0 0 documents, will be reviewed and
submitted the observation if any.
Qty in nos
0 20 40 6
0
Closeout document review report
0
0
ELV Snags
0
146
MEP Snags
146
29
Civil snags
29
26
Major snags
26
10
Handover pending
10
Qty in nos
0 20 40 60 80 100 120 140 160 180 200
PROJECT CONSULTANT
Cove Mall (partial) hand over pending.
Sl No Description Remarks
1 Occupancy certificate.
2a Electrical & ELV systems as build approved-code ''A'' by consultant drawings Pending.
2f Control wiring diagram for AHU'S, Chillers, MDB's, Capacitor bank to be provided. Pending.
3a All MEP Systems Testing and commissioning consultant approved certificates to be provided. Pending.
4 O&M manuals.
4a All MEP system O& M manuals consultant approved-code ''A'' to be handed over. Pending.
5a Third party test certificates for Chilled water system, Domestic water biological report and etc., are not provided. Pending.
6a All plant room keys and MEP systems & Electrical panel keys, manhole opening keys and etc., to be provided. Pending.
7 Password matrix.
Password matrix for ELV system computers Fire alarm system, Access control system, CCTV system, Chiller manager
7a Pending.
system, UPS and etc., are not provided
8 TAB report.
8a HVAC water and air balancing third party report to be submitted Pending.
9 Spares details.
10 Warranty details
10c Warranty details to be provided (water proof, all MEP systems, Structural & etc). Pending.
Cove Mall Major- FM Comments.
Description Total
Total comments: 26
Comments rectified: 0
Pending comments: 26
Date 07.12.2015
Percentage of accomplishment: 0%
S/N: Description Remarks Picture Close Out Date
Chiller no:1 & 3 out of 4 each one compressor seems that not
4
working till date
6 Control wiring diagram for AHU's control panel are not provided
7 Control wiring diagram for Chiller's control panel are not provided
Control wiring diagram for Capacitor bank control panel are not
9
provided
Control wiring diagram for SMDB & DB's control panel are not
10
provided
Electrical load schedule for all Electrical distribution SMDB & DB's
11
are not provided
Panel keys for Fire alarm system, DB's, MDB's, Sliding door, Chiller
23
panel opning keys, CO2 or FM200 Panel keys & etc is not provided.
Total comments: 29
Comments rectified: 0
Pending comments: 29
Percentage of accomplishment: 0%
S/N: Description Location Picture
9 Fire hose cabinet marble needs to be fix. corridor fire hose cabinet
15 Signage needs to be include arabic letter and symbol. Male & Female toilet
S/N: Description Location Picture
Sliding door control panel and motor housing cover not closing
21 Entrance
properly.
AHU control panel cable distribution GI conduit not rooted and fixed
2 AHU-01-B
properly. Poor installation method- Not Acceptable
AHU cooling valve actuator cable without proper conduit and gland.
3 AHU-01-B
Poor installation method- Not Acceptable
Temporary wooden Duct support, shall fix with proper rigid support.
5 AHU-01-A
Poor installation method- Not Acceptable
AHU control panel cable distribution GI conduit not rooted and fixed
8 AHU-01-A
properly. Poor installation method- Not Acceptable
AHU cooling valve actuator cable without proper conduit and gland.
9 AHU-01-A
Poor installation method- Not Acceptable
CHW flow switch cable without gland. Poor installation method- Not
10 Chiller-01
Acceptable
11 Pressure gauge brass ball valve handle broken, shall be replace. Chiller-01
CHW flow switch cable without gland. Poor installation method- Not
13
Acceptable
CHW flow switch cable without gland. Poor installation method- Not
15 Chiller-3
Acceptable
S/N: Description Location Picture
22 Doors not working properly( not opening some time) Entrance door
37 Weather proof socket needs to be install external areas. Cove Mall Back side
41 Need to install properly and rusted area need to be painted Cove Mall Back side
42 Need to install properly and rusted area need to be painted Cove Mall Back side
43 Need to install properly and rusted area need to be painted Cove Mall Back side
45 Exposed cable need to install cover to hide this cables Cove Mall Back side Electrical room
46 Circuit Breaker tagging to be done properly Cove Mall Back side Electrical room
47 Rusted screws need to be changed Cove Mall Back side Electrical room
S/N: Description Location Picture
49 Damaged (melted) acrylic cover need to be changed Cove Mall Back side Electrical room
50 Inside panel acrylic cover screw missing Cove Mall Back side Electrical room
51 Panel needs to be clean or repainted. Cove Mall Back side Electrical room
53 Door closer need to be installed Cove Mall Back side Electrical room
54 Lights need to install properly and hide the holes Cove Mall Back side
64 Signage need to be done properly chilled water pipe Roof Chiller Pump Room
65 Motor is not running properly- noise pump-3 Roof Chiller Pump Room Roof Chiller Pump Room
66 Asset labeling need to be done in motor Roof Chiller Pump Room Roof Chiller Pump Room
67 Rusted area need to be painted Roof Chiller Pump Room Roof Chiller Pump Room
68 Pressure vessel Gauge need to be installed Roof Chiller Pump Room Roof Chiller Pump Room
Chilled water pump motor cable without proper gland, exposed Roof Chiller Pump Room Roof Chiller Pump Room
69
cables.
70 Exposed wiring need to be hidden Roof Chiller Pump Room Roof Chiller Pump Room
72 Rusted area need to be painted Roof Chiller Pump Room Roof Chiller Pump Room
73 Indicator is not working properly Roof Chiller Pump Room Roof Chiller Pump Room
74 Rusted area need to be painted, dead end cover to be install. Roof Chiller Pump Room Roof Chiller Pump Room
75 Rusted area need to be painted Roof Chiller Pump Room Roof Chiller Pump Room
76 Cladding need to be done properly Roof Chiller Pump Room Roof Chiller Pump Room
77 Need to install properly and rusted area need to be painted Roof Chiller Pump Room Roof Chiller Pump Room
78 Smoke detector need to be installed Roof Chiller Pump Room Roof Chiller Pump Room
79 Rusted area need to be painted Roof Chiller Pump Room Roof Chiller Pump Room
S/N: Description Location Picture
81 Butterfly valve Need to be connected with BMS Roof top Roof top
84 This Compressor has never started Circuit-2 Roof top-CH No:01 Roof top
85 Chiller no:2 both circuit compressor seems that not at all worked. Roof top-CH No:02 Roof top
86 This Compressor has never started Circuit-1 Roof top Roof top
88 Chiller no 2 water in let sensor pipe is leaking Roof top Roof top
89 Chiller no 3 water in let sensor pipe is leaking Roof top Roof top
106 AHU assets tag need to be installed Roof top Roof top
107 Need to be connected with drainage line Roof top Roof top
109 Panel Cable need to be installed properly Roof top Roof top
110 Fresh air filter need to be installed properly for easy service access. Roof top Roof top
118 Chilled water pipe not installed properly (tilted) AHU-1B Roof top
133 Burned cables and contactor need to be changed Main MDB Electrical room
137 As built Drawing is not matching with as per installation Main MDB Electrical room
140 Circuit tagging need to done properly Main MDB Electrical room
147 AHU-1 & 2 Actutaor not working according to thermostat set point Roof top
148 Chilled water pump not working hand mode Roof top
149 Chillers actuator not working always open position Roof top
Date 07.12.2015
RAK
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
RAK
RAK
REOM FM 300.00
REOM FM 300.00
REOM FM
Picture After Work completed By Completion status Cost (SR)
REOM FM 1000.00
RAK
RAK
RAK
Picture After Work completed By Completion status Cost (SR)
REOM FM
REOM FM
REOM FM
RAK
RAK
Picture After Work completed By Completion status Cost (SR)
RAK
Picture After Work completed By Completion status Cost (SR)
RAK
RAK
RAK
RAK
RAK
RAK
Picture After Work completed By Completion status Cost (SR)
REOM FM
REOM FM
Picture After Work completed By Completion status Cost (SR)
RAK
Picture After Work completed By Completion status Cost (SR)
REOM
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
REOM
REOM
REOM
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
Picture After Work completed By Completion status Cost (SR)
RAK
RAK
REOM
Picture After Work completed By Completion status Cost (SR)
Cove Mall ELV inspection- FM Comments.
Description Total
Total comments: 12
Comments rectified: 0
Pending comments: 12
Percentage of accomplishment: 0%
S/N: Description Location Picture
Total comments: 0
Comments rectified: 0
Pending comments: 0
Percentage of accomplishment: #DIV/0!