You are on page 1of 10

SIEMENS Fit Up and Weld Visual Report Format Number: SIEMENS

Issuing Department PG SU AP IN QM PQM Reviewing Department PG SU AP IN QM PQM Document Type: FOR

Prepared: Dilip Chaudhary Approved By: Mridul sen Gupta Language: En

Project:1X20MW STG PROJECT Plant:KAMANDA STEEL PLANT Unit:1X20 MW STG System:

Name of Client: M/s RUNGTA MINES LIMITED KAMANDA Report No:RML/SL/TEE-DR-0283 Date:

ISO/ Line Number:62OP42504-U1-6730102096-41 Piping Class:CARBON STEEL (CS) Service:STEAM Pre‐Heat Temperature: 10 0C (Min)

Equipment Number: ATM FLASH TANK DRAIN HEADER Equipment Drawing Number: Inter Pass Temperature: 150 0C (Max)

Temporary
Heat Number Type Of Thickness Dimensional & WPS Root W/V attachment Final Weld
Sr No. Matcode/Spool No. (Note-1) Joint No. Joint Size (NB) (mm) Allignment FITUP CHECK Fit-up Date Number Welder Number (Note:7) NDT Visual Final WV Date
Check
(Note-5)

DR-0283-01 NA J-1 BW 168.3 7.11 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021


1
DR-0283-01 NA J-2 BW 60.3 cl.3000 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
2
DR-0283-01 NA J-2a BW 60.3 5.54 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
3
DR-0283-01 NA J-2b BW 60.3 5.54 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
4
DR-0283-01 NA J-3 SW 48.3 cl.3000 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
5
DR-0283-01 NA J-3a SW 48.3 5.08 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
6
DR-0283-01 NA J-3b SW 48.3 5.08 OK OK 5/6/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
7
DR-0283-01 NA J-4 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
8
DR-0283-01 NA J-5 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
9
DR-0283-01 NA J-6 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
10
DR-0283-01 NA J-7 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
11
DR-0283-01 NA J-8 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
12
DR-0283-01 NA J-9 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
13
DR-0283-01 NA J-10 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
14
DR-0283-01 NA J-11 SW 33.4 cl.3000 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
15
DR-0283-02 NA J-12 SW 168.3 7.11 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
16
DR-0283-02 NA J-13 SW 168.3 7.11 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
17
DR-0283-02 NA J-14 SW 168.3 7.11 OK OK 5/8/2021 WPS/COND/FAB03 W-02 OK NA OK 5/15/2021
18

Note :- 1. For LTCS/ NACE/ IBR Material Heat Number shall be recorded . 2. For LAS/ SS/ Non- Ferrous material,upon satisfactory PMI,QMD engineer shall sign . 3. In Case of LTCS and NACE welding consumables batch number shall be recorded. 4. During LTCS welding heat input shall be monitored & recorded in Remarks. 5. Up o
temporary attachment area,QMD engineer shall sign. 6. Internal Cleaning to be checked as per format No: EPCMD-2-QMOO-FMT-PP-011. 7. Before starting 2nd run welding, root weld visual must be cleared for socket weld, any joint for compressor suction line, major pumps, internally lined pipes, lube oil and control oil lines, sulfuric ac

Siemens Execution Siemens QA/QC Customer Execution Customer QMD


Signature

Name

Date

Unrestricted
umber: SIEMENS-FOR003

Page: 1 of 1

0 0C (Min)

50 0C (Max)

PMI
Report Internal
( Note-2 & Note Cleaning as per Remarks
Format (Y/N)
-3)

NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES

corded in Remarks. 5. Up on acceptance of DPT/MPT on


d control oil lines, sulfuric acid and oxygen line

Customer QMD

Unrestricted
SIEMENS Fit Up and Weld Visual Report Format Number: SIEMENS-

Issuing Department PG SU AP IN QM PQM Reviewing Department PG SU AP IN QM PQM Document Type: FOR

Prepared: Dilip Chaudhary Approved By: Mridul sen Gupta Language: En

Project:1X20MW STG PROJECT Plant:KAMANDA STEEL PLANT Unit:1X20 MW STG System:

Name of Client: M/s RUNGTA MINES LIMITED KAMANDA Report No:RML/SL/TEE-DR-0282 Date:

ISO/ Line Number:62OP42504-U1-6730102096-42 Piping Class:CARBON STEEL (CS) Service:STEAM Pre‐Heat Temperature: 10 0C (Min)

Equipment Number:ATM FLASH TANK VENT TO ATMOSPHERE& DRAIN TO TRENCH Equipment Drawing Number: Inter Pass Temperature: 150 0C (Max)

Temporary PMI
Heat Number Type Of Thickness Dimensional & WPS Root W/V attachment Final Weld Report
Sr No. Matcode/Spool No. (Note-1) Joint No. Joint Size (NB) (mm) Allignment Fit-Up Check Fit-up Date Number Welder Number (Note:7) NDT Visual Final WV Date ( Note-2 & Note
Check
(Note-5) -3)

DR-0282-01 NA J-1 BW 88.9 5.49 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA


1
DR-0282-01 NA J-2 BW 88.9 5.49 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
2
DR-0282-01 NA J-3 BW 33.4 4.55 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
3
DR-0282-01 NA J-3a BW 33.4 4.55 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
4
DR-0282-01 NA J-3b BW 33.4 4.55 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
5
DR-0282-01 NA J-3c BW 33.4 4.55 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
6
DR-0282-01 NA J-3d BW 33.4 4.55 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
7
DR-0282-01 NA J-4 BW 88.9 5.49 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
8
DR-0282-02 NA J-5 BW 88.9 5.49 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
9
DR-0282-02 NA J-6 BW 88.9 5.49 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
10
DR-0282-03 NA J-7 BW 88.9 5.49 OK OK 7/20/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
11
DR-0282-03 NA J-7a BW 33.4 4.55 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
12
DR-0282-03 NA J-7b BW 33.4 4.55 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
13
DR-0282-03 NA J-7c BW 33.4 4.55 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
14
DR-0282-03 NA J-7d BW 33.4 4.55 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
15
DR-0282-03 NA J-7e BW 33.4 4.55 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
16
DR-0282-03 NA J-8 BW 88.9 5.49 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
17
DR-0282-04 NA J-9 SW 88.9 5.49 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
18
DR-0282-04 NA J-10 SW 88.9 5.49 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
19
DR-0282-05 NA J-11 SW 88.9 5.49 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
20
DR-0282-05 NA J-12 SW 88.9 5.49 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
21
DR-0282-05 NA J-13 SW 88.9 5.49 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
22
VT-0281-01 NA J-14 BW 219.1 8.18 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
23
VT-0281-01 NA J-15 SW 33.4 4.55 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
24
VT-0281-01 NA J-16 BW 219.1 8.18 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
25

Unrestricted
VT-0281-01 NA J-17 BW 219.1 8.18 OK OK 7/22/2021 WPS/COND/FAB03 W-02 OK NA OK 7/26/2021 NA
26

Note :- 1. For LTCS/ NACE/ IBR Material Heat Number shall be recorded . 2. For LAS/ SS/ Non- Ferrous material,upon satisfactory PMI,QMD engineer shall sign . 3. In Case of LTCS and NACE welding consumables batch number shall be recorded. 4. During LTCS welding heat input shall be monitored & recorded in Remarks. 5. Up o
temporary attachment area,QMD engineer shall sign. 6. Internal Cleaning to be checked as per format No: EPCMD-2-QMOO-FMT-PP-011. 7. Before starting 2nd run welding, root weld visual must be cleared for socket weld, any joint for compressor suction line, major pumps, internally lined pipes, lube oil and control oil lines, sulfuric ac

Siemens Execution Siemens QA/QC Customer Execution Customer QMD


Signature

Name

Date

Unrestricted
EMENS-FOR003

Page: 1 of 1

Internal
Cleaning as per Remarks
Format (Y/N)

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

Unrestricted
YES

ks. 5. Up on acceptance of DPT/MPT on


, sulfuric acid and oxygen line

QMD

Unrestricted
SIEMENS Fit Up and Weld Visual Report Format Number: SIEMENS

Issuing Department PG SU AP IN QM PQM Reviewing Department PG SU AP IN QM PQM Document Type: FOR

Prepared: Dilip Chaudhary Approved By: Mridul sen Gupta Language: En

Project:1X20 MW STG PROJECT-KAMANDA Plant:KAMANDA STEEL PLANT Unit:1X20MW STG System:

Name of Client: M/s RUNGTA MINES LIMITED -KAMANDA Report No:RML/SL/TEE/VT-0805 Date:

ISO/ Line Number:62OP42504-U1-673010209-43 Piping Class:CARBON STEEL(CS) Service:STEAM Pre‐Heat Temperature: 10 0C (Min)

Equipment Number:HP FLASH TANK VENT TO ACC DUCT Equipment Drawing Number: Inter Pass Temperature: 150 0C (Max)

Temporary PMI
Heat Number Type Of Thickness Dimensional & WPS Root W/V attachment Final Weld Report
Sr No. Matcode/Spool No. (Note-1) Joint No. Joint Size (NB) (mm) Allignment Fit-Up Check Fit-up Date Number Welder Number (Note:7) NDT Visual Final WV Date ( Note-2 & Note
Check
(Note-5) -3)

VT-0805-01 NA J-1 BW 273.1 9.27 OK OK 8/10/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA


1
VT-0805-01 NA J-2 BW 273.1 9.27 OK OK 8/10/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA
2
VT-0805-02 NA J-3 BW 273.1 9.27 OK OK 8/10/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA
3
VT-0805-02 NA J-4 BW 273.1 9.27 OK OK 8/10/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA
4
VT-0805-03 NA J-5 BW 273.1 9.27 OK OK 8/12/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA
5
VT-0805-03 NA J-6 BW 273.1 9.27 OK OK 8/12/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA
6
VT-0805-04 NA J-7 BW 273.1 9.27 OK OK 8/12/2021 WPS/COND/FAB03 W-02 OK NA OK 8/15/2021 NA
7
VT-0805-04 NA J-8 BW 273.1 9.27 OK OK 8/12/2021 WPS/COND/FAB03 W-02 OK NA OK 8/16/2021 NA
8
VT-0805-05 NA J-9 BW 273.1 9.27 OK OK 8/12/2021 WPS/COND/FAB03 W-02 OK NA OK 8/16/2021 NA
9
VT-0805-06 NA J-10 BW 273.1 9.27 OK OK 8/14/2021 WPS/COND/FAB03 W-02 OK NA OK 8/16/2021 NA
10
VT-0805-07 NA J-11 BW 273.1 9.27 OK OK 8/14/2021 WPS/COND/FAB03 W-02 OK NA OK 8/16/2021 NA
11
VT-0805-07 NA J-12 BW 273.1 9.27 OK OK 8/14/2021 WPS/COND/FAB03 W-02 OK NA OK 8/16/2021 NA
12
VT-0805-08 NA J-13 BW 273.1 9.27 OK OK WPS/COND/FAB03 OK NA NA
13
VT-0805-08 NA J-14 BW 273.1 9.27 OK OK WPS/COND/FAB03 OK NA NA
14
VT-0805-08 NA J-15 BW 273.1 9.27 OK OK WPS/COND/FAB03 OK NA NA
15

Note :- 1. For LTCS/ NACE/ IBR Material Heat Number shall be recorded . 2. For LAS/ SS/ Non- Ferrous material,upon satisfactory PMI,QMD engineer shall sign . 3. In Case of LTCS and NACE welding consumables batch number shall be recorded. 4. During LTCS welding heat input shall be monitored & recorded in Remarks. 5. Up o
temporary attachment area,QMD engineer shall sign. 6. Internal Cleaning to be checked as per format No: EPCMD-2-QMOO-FMT-PP-011. 7. Before starting 2nd run welding, root weld visual must be cleared for socket weld, any joint for compressor suction line, major pumps, internally lined pipes, lube oil and control oil lines, sulfuric ac

Siemens Execution Siemens QA/QC Customer Execution Customer QMD


Signature

Name

Date

Unrestricted
EMENS-FOR003

Page: 1 of 1

Internal
Cleaning as per Remarks
Format (Y/N)

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

ks. 5. Up on acceptance of DPT/MPT on


sulfuric acid and oxygen line

QMD

Unrestricted
SIEMENS Fit Up and Weld Visual Report Format Number: SIEMENS

Issuing Department PG SU AP IN QM PQM Reviewing Department PG SU AP IN QM PQM Document Type: FOR

Prepared: Dilip Chaudhary Approved By: Mridul sen Gupta Language: En

Project:1X20 MW STG PROJECT-KAMANDA Plant:KAMANDA STEEL PLANT Unit:1X20MW STG System:

Name of Client: M/s RUNGTA MINES LIMITED -KAMANDA Report No:RML/SL/TEE/VT-0805 Date:

ISO/ Line Number:62OP42504-U1-673010209-44 Piping Class:CARBON STEEL(CS) Service:STEAM Pre‐Heat Temperature: 10 0C (Min)

Equipment Number:HP FLASH TANK DRAIN TO CONDENSATE STORAGE TANK Equipment Drawing Number: Inter Pass Temperature: 150 0C (Max)

Temporary
Heat Number Type Of Thickness Dimensional & WPS Root W/V attachment Final Weld
Sr No. Matcode/Spool No. (Note-1) Joint No. Joint Size (NB) (mm) Allignment Fit-Up Check Fit-up Date Number Welder Number (Note:7) NDT Visual Final WV Date
Check
(Note-5)

DR-0803-01 NA J-1 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021


1
DR-0803-01 NA J-1a BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
2
DR-0803-01 NA J-2 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
3
DR-0803-02 NA J-3 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
4
DR-0803-02 NA J-3a SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
5
DR-0803-02 NA J-3b SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
6
DR-0803-02 NA J-3c SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
7
DR-0803-02 NA J-3d SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
8
DR-0803-02 NA J-3e SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
9
DR-0803-02 NA J-3f SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
10
DR-0803-02 NA J-3g SW 33.4 4.55 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
11
DR-0803-02 NA J-4 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
12
DR-0803-03 NA J-5 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
13
DR-0803-03 NA J-6 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
14
DR-0803-03 NA J-7 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
15
DR-0803-03 NA J-8 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
16
DR-0803-03 NA J-9 BW 114.3 6.02 OK OK 8/25/2021 WPS/COND/FAB03 W-02 OK NA OK 8/30/2021
17

Note :- 1. For LTCS/ NACE/ IBR Material Heat Number shall be recorded . 2. For LAS/ SS/ Non- Ferrous material,upon satisfactory PMI,QMD engineer shall sign . 3. In Case of LTCS and NACE welding consumables batch number shall be recorded. 4. During LTCS welding heat input shall be monitored & recorded in Remarks. 5. Up o
temporary attachment area,QMD engineer shall sign. 6. Internal Cleaning to be checked as per format No: EPCMD-2-QMOO-FMT-PP-011. 7. Before starting 2nd run welding, root weld visual must be cleared for socket weld, any joint for compressor suction line, major pumps, internally lined pipes, lube oil and control oil lines, sulfuric ac

Siemens Execution Siemens QA/QC Customer Execution Customer QMD


Signature

Name

Date

Unrestricted
umber: SIEMENS-FOR003

Page: 1 of 1

0 0C (Min)

50 0C (Max)

PMI
Report Internal
( Note-2 & Note Cleaning as per Remarks
Format (Y/N)
-3)

NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES
NA YES

corded in Remarks. 5. Up on acceptance of DPT/MPT on


d control oil lines, sulfuric acid and oxygen line

Customer QMD

Unrestricted