You are on page 1of 1

SUMMARY JAM KERJA OPERATOR ALAT BERAT

UNTUK PEMBAYARAN INSENTIVE


21 Aug s/d 20 Sep 2023

Bull Dozer Bull Dozer Bull Dozer


No. NIK Nama Loader WA500 Loader WA500 Loader W980L TOTAL TOTAL Keterangan
D155A D155A D155A
DZ-01 DZ-02 DZ-03 WA-01 WA-02 WA-03 (Jam) INSENTIVE

1 14120579 ABDI SURANI 13.0 58.0 82.0 - - - 153.0 Rp 765,000.00

2 10070256 ACHMAD 28.0 84.0 9.0 - - - 121.0 Rp 605,000.00 Heavy Equipment (HE,
DZ, WL & Crane Exs.
Harma ) @Rp.
3 11030326 AHMAD JAINI 17.0 - 106.0 13.9 35.3 7.0 179.2 Rp 896,000.00 5000/Jam

4 21030814 AMIRUDIN 50.0 128.0 29.0 4.0 6.2 - 217.2 Rp 1,086,000.00


Dump Truck (DT-ABN)
5 08120125 BAMBANG. H 81.0 11.0 - 12.4 16.8 - 121.2 Rp 606,000.00 @Rp.
3000 / Jam
Water Truck (WT)
6 17060628 BAYU ANGGA. K - - - 18.1 131.1 - 149.2 Rp 746,000.00 @Rp. 2000 /
Jam
Crane Truck (CT)
7 23050880 TRI WAHYUDI SAPUTRA - - - 50.5 134.1 - 184.6 Rp 923,000.00 @Rp. 2000 /
Jam
8 12080479 M. HANIANSYAH 37.0 10.0 - 95.1 19.3 - 161.4 Rp 807,000.00

9 17070680 MUHAMMAD YOGI - - - 75.2 101.2 - 176.4 Rp 882,000.00

10 17030614 PRIYANTO 20.0 44.0 - 75.0 25.3 6.0 170.3 Rp 851,500.00

11 11110387 SEPTIAN DWI - 13.0 145.0 - - - 158.0 Rp 790,000.00

TOTAL 246.0 jam 348.0 jam 371.0 jam 344.2 jam 469.3 jam 13.0 jam 1,791.50 jam Rp 8,957,500.00

Sangasanga, 25 Sep 23y


Dibuat Oleh Diperiksa Oleh Disetujui Oleh,

Heru Prasetyo Sutrisno Yon Cahyadi Juvenri Situngkir


Supv. Planner CPP SR. Supt. Operation CPP & Transhipment SR. Manager Mining Support General Manager/KTT