Document Type: Level III Procedure/Work Plan Title : Document Number :

WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01


INSTRUCTION WORK INSTRUCTION

Page : 1 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

INFOTREE SDN BHD (INFO3)


Block 8, Unipark Suria,
Jalan Ikram-Uniten, 43000 Kajang,
Selangor

Revision Date Description By Review Approve

1 01/10/ 2019 Issue for Implementation QMS HOU MR MGR


MS ISO 9001:2015
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 2 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

1.0 TOOLS REQUIRED


 Drill
 Screw Driver
 Wire Cutter
 Electrical Insulation Tape (Black)
 Screws and wall plugs

2.0 RESPONSIBILITY

 HOU (PSU) - Head of PC Support Unit


 PSUS - PC Support Unit Staff

3.0 WORK INSTRUCTION


3.1 Scope
This work instruction covers the installation of PC and peripheral devices.

3.2 Install PC
No Instructions PIC KPI
1 Upon received new hardware purchased, unpack the boxes and HOU(PSU)
make sure all hardware: PSUS
a. Appearance in good conditions
b. Quantity ordered is same with received
c. Specification ordered is same with received
d. Function well
Hardware for PC installation:
 Monitor
 CPU
 Mouse
 Keyboard
 Cables
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 3 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

2 Next, set up the PC at required workplace requested by CLT and HOU(PSU)


plug in all cables into their respective slots. Then, switch ON the PSUS
PC.

3 Next, configure windows and install Microsoft Office. HOU(PSU)


 Word PSUS
 Excel
 Power point
 Access
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 4 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

4 Then, proceed with installation of antivirus. HOU(PSU)


 Sophos Endpoint Security PSUS

5 Next, assign IP (internet protocol) address based on Ikram’s IP HOU(PSU)


range. PSUS
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 5 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

6 Process complete. Handover invoice and Delivery Order (DO) to HOU(PSU) 1 hour
CLT for acknowledgement. PSUS from
no.1
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 6 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

3.2 Install Peripheral devices


No Instructions PIC KPI
1 Upon receive CLT request to install peripheral devices, HOU(PSU)
HOU(PSU) will proceed to purchase finger print reader device
and magnetic access door
Please refer to ADM-F-850-002 Purchasing procedure.
2 Upon received new hardware purchased, unpack the boxes and HOU(PSU)
make sure all hardware: PSUS
e. Appear in good condition
f. Quantity ordered is same with received
g. Specification ordered is same with received
h. Function well
Hardware for Fingerprint Reader installation:
 Fingerprint Reader
 Power Supply Unit
 Network Cable
 4 Core Cable

3 Next, install reader at location requested by CLT. HOU(PSU)


Mark the location for Power Supply Unit and Fingerprint PSUS
Reader. Drill holes for cable route, then drill holes for screw,
insert wall plug and fix the devices bracket in place.
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 7 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

4 Measure the length for the 4 core cable from power supply unit HOU(PSU)
to fingerprint reader location. Network cable length is measured PSUS
from the reader to the nearest network switch. Next, insert the 4
core cable and network cable through the hole drilled earlier.
Connect the 4 core cable with socket connector provided and
tape it. Connect network cable to connector provided.

5 Fix all connector to slots provided at the back of the reader, fix it HOU(PSU)
to the bracket then screw the reader tight. PSUS
Document Type: Level III Procedure/Work Plan Title : Document Number :
WORK INSTALL PC/PERIPHERAL DEVICES PSU-850-001-WI01
INSTRUCTION WORK INSTRUCTION

Page : 8 of 8
HEAD OF PC SUPPORT UNIT Revision: 1
INFOTREE SDN BHD (INFO3)
Co. No. 491202-P Date : 01/10/2019

6 Next, assign designated IP (internet protocol) address based on HOU(PSU)


Ikram’s IP range to enable the reader to be access and control PSUS
from the fingerprint reader server

7 Process complete. Handover invoice and Delivery Order (DO) to HOU(PSU) 1 hour
CLT for acknowledgement. PSUS from
no.1

4.0 APPENDIX