You are on page 1of 1

8 7 6 5 4 3 2 1

175 Construction joint to be chipped out and remove


6100 (INSIDE) loose concrete, roungh surface to wash with water jet.
6100 (INSIDE) Sand face
25thk. Water proof plaster
150 1525 1525 1525 1525 150 Plaster PVC Swallable Water Stopper Square bar Apply cement slurry just before start new contcreting above.
150x150 Fillet

175
1100 5002 776 776 175 Shear Key 170
50x50 50 Thk. (min.) Screeding ( Water Proof)
N2A N2B

FB4d
laying in slope 1:200

FB4d
F

FB4d

FB4d
FB2a FB2

50
P10 P10 P10 P10 P10 Basin water proofing (FFL) F

200
Basin Slab

150
150

FB3d

Confirm with Vendor


FB3d

600
25 thk. Water Proof TOS

700
700

500
FB2a FB2 25 thk. Water

Confirm with Vendor


375
Plaster
Proof Plaster
Basin slab
A A Roof Beam

300

1525
N5A N3A / N4A RCC Wall 100@150c/c CT RCC Wall
P2 FB1a FB1b FB1a FB1b Plaster

170 RCC Wall


P2 200 P1 100@150c/c

1220

1220
P1 100@150c/c Construction Joint Detail 10 0@150c/c Both face

2025
2025
COLUMN 300x300 P10 PVC Swallable 10 0@150c/c Both face
8 0@150c/c 80@300/c
Pedestal Water stopper

FB4c
P10

FB4c
FB4c

FB4c
50 Thk. (Min.) Water Proof Screeding P11 80@300/c

FB3c
FB3c

1525
laying in slope 1:200 Vertical Reinf. 1-80 50 Thk. (min.) Watter Proof screeding
1-80 10 0@150c/c
Horizontal Tie Slab CT Base slab

200

200
Basin Slab Levl Bothways FFL 111.225 Base Slab Levl

390
FB2a FB2 FB2a FB2 EL 111.225

5000
5000

1126
P10 BESIN PARTITION WALL P10
75 75
100@150c/c 10 0@150c/c Slab Reinf.
E 500 E

1525
Bothways at top 175 RCC Wall RB Bothways RB

7774
7775

2975
2975

N2C
THIS PRINT IS THE PROPERTY OF SMV ENGINEER'S IT IS TO BE USED ONLY FOR THE PURPOSE FOR WHICH IT WAS LENT AND MUST NOT BE USED ON ANY DETERIMENTAL TO THE INTEREST OF THIS COMPANY AND IT IS SUBJECT TO RETURN ON DEMAND.

Detail of Wall Between two Compartment


P10 P10 Detail of Wall outer (Peripherial) Beam
Section 5-5
P1 300
P1
P1
SEC. 5-5 1065 175

1525
P2 P1 P2 75 150 75
400
B B

Z:\02. Current Projects\2019\(5) INDIAIN JOBS\519001_Govind Organics\2) SMV DRAFTING\2. STRUCTURE\3_Submission\2020.07.13_LADIES TOILET SUNK_R.M & F.G\519001-RC-UT-21 (3) LO AND DETAIL OF COOLING TOWER BASIN AT EL 111.225M.dwg
100@150c/c

75 150 75
FB1a FB1b FB1a FB1b FOUNDATION BOLTS 75 450 100@150c/c

300
P10 1/2" BSW.4NOS 100@150c/c
FOR EACH PEDESTAL

175
FB4b
FB3b
Bolt projection (65mm) confirm with 100@150c/c

2225
2225

FB4b

450
Mech. or Vendor prior to concreting

1525
FB4b

FB4b
80@150c/c
FB3b

10 0@150c/c

400
1525 1525 1525 1525 Detail of Wall Pedestal P10 80@300c/c 80@150c/c
1065
N5B N3B/N4B 150

600

600

1065
100@150c/c
300

300
75 150 75 400

5000

5000
150x150 Fillet (TYP)

600

400
FB2a FB2 P11 FB2a FB2

450
P11 P11 P11 P11 N3A/N4A 100@150c/c 75 450

170 RCC Wall

150 75
BESIN

1525
FOUNDATION BOLTS 80@150c/c

2000
D PARTITION WALL D

170
1/2" BSW.8NOS
FOR EACH PEDESTAL 100@150c/c

2776
2776

600
150
10 0@150c/c

400
80@300c/c
P10 P10

75 150
175 150 100@150c/c
A
A
Detail of RCC Wall Corner

1525
P2 P1 P1 P2 P1 P1 150x150 Fillet (TYP)

C C

450
Detail of Wall Pedestal P11 Top Reinf. 80@150c/c
Basin water Proofing
FB1a FB1b FB1a FB1b 100@150c/c 100@150c/c

1263
A COLUMN 300x300 A 300 Bothways at bottom
P10 P10 100@150c/c
100@150c/c

150
7776
7775

CT Basin Slab

1525
8 - 12 0 100@150c/c

2500
2500

FB4a
150 thk. Slab

300
Beam

FB4a

H
FB4a

FB4a
FB3a

N2/ 80@150 c/c


100 @150c/c Detail of RCC Wall Among
Rings Rings
Bothways at

FB3a
2 - Sets bottom
P10 P10
FB2 Pedestal P10 Bottom Reinf.
5000

5000
FOUNDATION BOLTS

1525
B
FB2a FB2a FB2 SECTION. A-A 1/2" BSW.4NOS
C Beam Top bars Thru FOR EACH PEDESTAL C

5
Beam Tie Rings
CT Basin Slab
P10 T.O.C
2500
2500

P10 300
6 - 12 0
100@150c/c

176 49

75 75
1525
Bothways at 4 - 16 0 400 Top Extra bars
375 N3B/N4B
bottom N5

150
P1
500

500

600
230
150
P10 75 75
150

150
150

D D
263

Beam

375
Beam Bottom bars Beam
P2 FB1a FB1b FB1a P10 P10 P10 P1 P10
P1 P2 FB1b 8 0@150 c/c Pedestal P1/ P2 150
P1 Rings Horizontal Tie
150 1525 1525 1525 1525 150 Pedestal Ring
2 - Sets Vertical Reinf.
150 1100 5000 150 Pedestal P1/ P2
TYP. DETAL FOR COOLING TOWER
1100 5000 375
SUPPORT COLUMN

5
2' 2 1 2 1 Pedestal P11 Reinf. Arrangement Detail for Pedestal P1 & P2
Structural Layout of Slab Structural Member Marking Layout >> READ THIS DRAWING IN CONJUCTION WITH RC-UT-21(2) - SHEET.2
& MECH. DWG. LO101-R2A-09.03.20
>> FOR NOZZLE LOCATION REFER DRAWING NO. LO101-R2A-09.03.20 & SEC101-R1-09.03.20 Notes :
B 1. All dimensions are in millimeters and levels are in meters unless noted otherwise B
100 P10 P10 P10 P10 P10 P10 P10 P10 P10 P11 P10 P10 P10 P10 P10 2. Layout,dimensions & levels to be checked with Mech. drg. & if any ambiguity
P10
Pedestal is found,contact engineer in-charge prior to proceed
700
Pedestal Pedestal P11 3. Follow written dimensions only,do not scale the dimensions
1220
1220

P10 P10
80 @150c/c 2-16 0 Thru 80 @150c/c 230 4. All Concrete shall be M25, machine mixed and vibrated U.N.O.
300 1250 2-16 0 Thru
4-20 0 Thru 2-16 0 Thru 1450 1450 1450 1450 1450 1-16 0 Extra at support
FFL 1 4-20 0 Thru FFL 3
2-16 0 Thru
5. Reinforcement grade shall be Fe 500 TMT bars
TOC
6. Clear cover to main steel in wall & Slab 25mm, Beam 35mm
46 x Bar Dia. (TYP)

46xBar Dia.

400
400

450
Rings 1-16 0 Extra 1-16 0 Extra 1-16 0 Extra 1-16 0 Extra
600

Rings
200 200
3 3-20 0 Thru
FOR CONSTRUCTION
TYP. 3-20 0 Thru 3-20 0 Thru 3-20 0 Thru
1
4-16 0 Thru
4-16 0 Thru 80150c/c 80150c/c 80150c/c SEC. 3-3 R1 14.07.20 FLOOR LEVEL REVISED AS PER ARCH. DWG JK PVP
SEC. 1-1 ALL ALL ALL
R0 21.06.2020 ISSUED FOR CONSTRUCTION CHETAN PVP
8 0100c/c 80100c/c 8 0150c/c 80100c/c
12 Nos. Rest 12 Nos.
FB3a (230x450) FB3b (230x450) FB3c (230x450) FB3d (230x450)
All REV.NO. DATE DESCRIPTION DRAWN CHECKED
FB1a (300X600) FB1b (300X600) 700
CLIENT :
300
1100 3-16 0 Thru 230 1250
3-20 0 Thru 1450 1450 3-20 0 Thru 1450 1450 3-20 0 Thru 1450 3-20 0 Thru
YASH SPECIALITY CHEMICALS LLP.
2 FFL TOC 3-16 0 Thru 4
A
SMV ENGINEERS

400
450

2-12 0 Thru 2-12 0 Thru 2-16 0 Extra 2-16 0 Extra 2-16 0 Extra 2-16 0 Extra CONSULTANT:

600
2-16 0 Extra at Support
Rings 2ND FLOOR, MAHARSHI COMPLEX,
Rings NEAR SARDAR PATEL BAVLA, AHMEDABAD-380014
2
3-20 0 Thru 3-200 Thru PHONE: 079-48901473 EMAIL:admin@smvengineers.com
8 0150c/c 80@ 150c/c SEC. 2-2 3-20 0 Thru 4
3-20 0 Thru 3-20 0 Thru 3-20 0 Thru
DRAWN VINIT 17.06.2020 TITLE:- L/O AND DETAIL OF COOLING TOWER BASIN
All All 80100c/c 80150c/c 80100c/c 80100c/c 80150c/c 80100c/c 8 0100c/c 80150c/c 8 0100c/c SEC. 4-4 AT +113.45M LVL
12 Nos. ALL 12 Nos. 12 Nos. ALL 12 Nos. 12 Nos. ALL 12 Nos. CHECKED PVP 17.06.2020 UTILITY AREA - PRODUCTION BUILDING
FB2 (230X450) FB2 (230X450) APPROVED ASP 17.06.2020 SHEET NO. JOB. NO. DRG. NO. REV.
FB4a (300x600) FB4b (300x600) FB4c (300x600) FB4d (300x600)
8 7 6 5 4 3 SCALE 1:50 03 OF 03 519001 519001-RC-UT-21(3) R1
PAPER SIZE: A1