01 CASTING
1. [MCQ] 3. [MCQ]
Directional solidification in castings can be
Assertion (A): Aluminium alloys are cast in hot
improved by using
chamber die casting machine.
(a) Chills and chaplets
Reason (R): Aluminium alloys require high melting
(b) Chills and padding
when compared to zinc alloys.
(c) Chaplets and padding
(a) Both A and R are true and R is the correct
(d) Chills, chaplets and padding
explanation of A
4. [MCQ]
(b) Both A and R are true but R is not a correct
explanation of A Consider the following ingredients used in moulding
1. Dry silica sand 2. Clay
(c) A is true but R is false
3. Phenol formaldehyde 4. Solidum silicate
(d) A is false but R is true
Those used for shell mould casting include
2. [MCQ] (a) 1, 2 and 4 (b) 2, 3 and 4
Match List-I (Product) with List-II (Process of (c) 1 and 3 (d) 1, 2, 3 and 4
manufacture) and select the correct answer using the 5. [MCQ]
codes given below the lists. Which of the following methods are used for
List-I obtaining directional solidification for riser design?
A. Automobile piston in aluminium alloy 1. Suitable placement of chills.
B. Engine crankshaft in spheroidal graphite iron 2. Suitable placement of chaplets.
C. Carburettor housing in aluminium alloy 3. Employing padding.
D. Cast titanium blades Which of these statements are correct?
List-II (a) 1 and 2 (b) 1 and 3
1. Pressure die-casting (c) 2 and 3 (d) 1, 2 and 3
2. Gravity die-casting 6. [MCQ]
3. Sand casting Misrun is a casting defect which occurs due to
4. Precision investment casting (a) Very high pouring temperature of the metal
5. Shell moulding (b) Insufficient fluidity of the molten metal
Codes: (c) Absorption of gases by the liquid metal
A B C D (d) Improper alignment of the mould flasks
(a) 2 3 1 5 7. [MCQ]
(b) 3 2 1 5 Which of the following pairs are correctly matched?
(c) 2 1 3 4 1. Pit moulding . . . for large jobs
(d) 4 1 2 3 2. Investment moulding . . . Lost wax process
3. Plaster moulding . . . Mould prepared in gypsum
GATE WALLAH MECHANICAL WORKBOOK 1
CASTING
(a) 1, 2, and 3 (b) 1 and 2 1. The molten metal should enter the mould cavity
(c) 1 and 3 (d) 2 and 3 with as high a velocity as possible.
8. [MCQ] 2. it should facilitate complete filing of the mould
cavity.
Which one of the following pairs is not correctly
3. It should be able to prevent the absorption of air
matched?
of gases from the surroundings on the molten
(a) Aluminium alloy . . . Pressure die casting piston
metal while flowing through it.
(b) Jewellery . . . Lost wax process
Select the correct answer using the codes given
(c) Large pipes . . . Centrifugal casting
below:
(d) Large bells . . . Loam moulding
(a) 1, 2 and 3 (b) 1 and 2
9. [MCQ]
(c) 2 and 3 (d) 1 and 3
If the melting ratio of a cupola is 10 : 1, then the coke
13. [MCQ]
requirement for one ton melt will be
(a) 0.1 ton (b) 10 tons A spherical drop of molten metal of radius 2 mm was
(c) 1 ton (d) 11 tons found to solidify in 10 seconds. A similar drop of
10. [MCQ] radius 4 mm would solidify in
(a) 14.14 second (b) 20 seconds
Assertion (A): Steel can be melted in hot blast
(c) 18.30 second (d) 40 seconds
cupola.
Reason (R): In hot blast cupola, the flue gases are 14. [MCQ]
used to preheat the air blast to the cupola so that the In solidification of metal during casting,
temperature in the furnace is considerably higher compensation for solid contraction is
than that in a conventional cupola. (a) Provided by the oversize pattern
(a) Both A and R are true and R is the correct (b) Achieved by properly placed risers
explanation of A (c) Obtained by promoting direction solidification
(b) Both A and R are true but R is not a correct (d) Made by providing chills
explanation of A
15. [MCQ]
(c) A is true but R is false
(d) A is false but R is true Match List-I (Type of casting) with List-II
(Working principles) and select the correct answer
11. [MCQ]
using the codes given below the lists.
A sand-casting mould assembly is shown in the
List-I
given figure. The elements marked A and B are
A. Die casting B. Centrifugal casting
respectively
C. Centrifuging D. Continuous casting
List-II
1. Molten metal is forced into the die under
pressure
2. Axis of rotation does not coincide with axis of
mould
3. Metal solidifies when mould is rotating
4. Continuously pouring molten metal into mould
(a) Sprue and riser (b) Ingate and riser Codes:
(c) Drag and runner (d) Riser and runner A B C D
12. [MCQ] (a) 1 3 2 4
Which of the following are the requirements of an (b) 4 3 2 1
ideal gating system? (c) 1 2 3 4
(d) 4 2 3 1
For more questions, kindly visit the library section: Link for web: https://smart.link/sdfez8ejd80if