• Trial bores, preliminary test piles, and static load testing of 1% (minimum 1 pile) of contract piles.
• Fencing above retaining wall is not covered at this stage of design, however fencing will be part of
scope of contractor. All design and details for connection will be provided by the consultant.
• Ensure a harmonious visual integration of the cantilever retaining wall system with the overall
project design.
• Apply finishing touches that enhance the appearance of the compound wall while maintaining
structural integrity.
• Adhere to relevant codes, regulations, and industry standards to ensure compliance with safety
and structural requirements.
• Conduct regular inspections and testing to verify the integrity of the tension/compression piles,
and overall compound wall.
• Implement corrosion protection measures, coatings, or treatments to extend the life span of the
structure.
• Ensure that the compound wall is constructed to withstand the potential challenges posed by the
coastal environment.