You are on page 1of 1

X1 X2 X3 X4 X5 X6 Y1 Y2 Y3

ELEVATION-A ELEVATION-B

X6 X5 X4 X3 X2 X1 Y3 Y2 Y1

ELEVATION-C ELEVATION-D

X6 X5 X4 X3 X2 X1 Y3 Y2 Y1

M1 MACHINE ROOM M1 MACHINE ROOM


FINAL INSPECTION

SECTION THRU-E SECTION THRU-F

DESIGNER: PROJECT TITLE: OWNER: NO. ISSUES/REVISIONS DATE: BY: APP: DATE: 10.01.21 CONTENTS: SHEET NO.

0 PERMIT DRAWING 10.01.21 PHPC STI SCALE: AS-SHOWN


BYRON M. PAYOYO
CIVIL ENGINEER ENCLOSURE, M & E UTILITIES FOR SAN TECHNOLOGY, INC. CADD BY: PCBM ELEVATION & SECTION
C-03
PRC NO: 0084454 PTR NO: 1524414 FINAL INSPECTION AND M1 MACHINE GILBERT S. DIAZ
CHECKED BY: BMP

APPROVED BY: - REF. NO. SIZE:


TIN NO: 214-546-028 ISSUED AT: BIÑAN, LAGUNA OWNER'S REPRESENTATIVE
ISSUED ON: 11 JAN. 2021 LOCATION: BLOCK 7 PH.2, CAVITE ECONOMIC ZONE ROSARIO, CAVITE LOCATION: BLOCK 7 PH.2, CAVITE ECONOMIC ZONE ROSARIO, CAVITE QA/QC APPROVED: -
PERMIT DRAWING A3

You might also like