TIME & WORK Complete Chapter
TIME & WORK Complete Chapter
(a) 8
(b) 10
(c) 12
(d) 15
(a) 10⁵⁄₇
(b) 10⁴⁄₇
(c) 10
(d) None of these
(a) 30
(b) 32
(c) 36
(d) 40
(a) 12
(b) 15
(c) 16
(d) NOT
(a) 10
(b) 12
(c) 15
(d) NOT
For Detailed Solution & Approach,
Refer the Video:
https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
A, B and C can do a work and 10 days,
12 days and 15 days respectively. They
start the work together but A left after
working 3 days and C left 4 days before
the completion of the work. In how
much time the whole work completed.
(a) 6⁴⁄₉
(b) 4⁷⁄₉
(c) 7⁵∕₉
(d) 6 ⁵∕₉
For Detailed Solution & Approach,
Refer the Video:
https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
P takes 10 days to complete 40% of a task
while Q takes 18 days to complete 75% of
the same work. P and Q start a work
together but P leaves the work after a few
days, Q continued to work alone for 3 days.
If 63% work was still left, how many days
did P leave the work?
P िो किसी िार्य िे 40% िो पू रा िरने में 10 किन
लगते हैं जबकि Q िो उसी िार्य िे 75% िो पू रा
िरने में 18 किन लगते हैं P और Q ने कमलिर एि
िाम शुरू किर्ा ले किन P ने िुछ किनोों िे बाि
िार्य छोड़ किर्ा, Q3 किन ति अिेले िाम िरना
जारी रखा र्कि 63% िाम अभी भी बािी था तो P
ने कितने किन िाम िरिे िार्य छोड़ा ?
(a) 1
(b) 2
(c) 3 For Detailed Solution & Approach,
(d) 4 Refer the Video:
https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
A, B and C can complete a work separately in
24, 36 and 48 days respectively. They started
together but C left after 4 days of start and A
left 3 days before the completion of the work.
In how many days will the work be completed ?
(a) 18
(b) 20
(c) 24
(d) 30
(a) 9
(b) 12
(c) 15
(d) 18
A.4 days
B.4.5 days
C.6 days
D.7.5 days
E. None of these
(a) 30
(b) 45
(c) 50
(d) NOT
(a) 8 days
(b) 10 days
(c) 9 days
(d) 12 days
(a) 20 days
(b) 32 days
(c) 30 days
(d) 15 days
A. 6
B. 7
C. 9
D. 8
E. None of these
(a) 45
(b) 48
(c) 52
(d) 60
(a) 4
(b) 5
(c) 6
(d) 7
(a) 9
(b) 21
(c) 24
(d) 27
(a) 72
(b) 20
(c) 24
(d) 36
A. 14 days
B. 20 days
C. 16 days
D. 12 days
E. None of these
A. 120/11 days
B. 140/13 days
C. 75/12 days
D. 150/11 days
E. None of these
For Detailed Solution & Approach,
Refer the Video:
SBI PO PRELIMS 2017 https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
A and B together can do a piece of work
in 60 days, A and C can do the same work
in 45 days. The ratio of Work efficiency of
B and C is 1:2. In how many days they
together can do the same work?
A और B किसी िाम िो एि साथ 60 किनोों में िर
सिते हैं । A और C उसी िाम िो 45 किनोों में िर
सिते है । B और C िी िार्य िक्षता िा अनुपात 1:2
है । कितने किनोों में वे एि साथ इसी िाम िो पूरा
िर सिते है ?
A. 30 days
C. 24 days
B. 25 days
D. 36 days
E. None of these
RRB PO PRELIMS 2017
For Detailed Solution & Approach,
Refer the Video:
https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
40 men can complete a work in 48 days. If 64
men started working and after X days, 32
more men joined the work. If the remaining
work is completed in 16⅔ days, then find the
value of X.
A. 2
B. 5
C. 8
D. 4
E. 6
a) 2 days
b) 4 days
c) 6 days
d) 8 days
e) 10 days
(a) 4 hours
(b) 5 hours For Detailed Solution & Approach,
(c) 6 hours Refer the Video:
(d) 8 hours https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
Railneer is packaged in water bottling plant, रे लनीर िो िो मशीनोों M1 और M2 िी मिि से
with the help of two machine: M1 and M2. M1 पानी िे बॉटकलों ग प्ाोंट में पै ि किर्ा जाता है । M1
and M2 produces 400 and 600 bottles per और M2 प्रकत कमनट 400 और 600 बोतल िा
minute. One day's production can be processed उत्पािन िरते हैं । एि किन िे उत्पािन िो M1
by M1 operating alone for 9 hours, by M2 द्वारा िेवल 9 घोंटोों िे कलए, M2 ऑपरे कटों ग द्वारा
operating alone for 6 hours or by both M1 and अिेले 6 घोंटे र्ा िोनोों M1and M2 िे सों चालन िे
M2 operating simultaneously for 3 hours and 36 कलए एि साथ 3 घोंटे और 36 कमनट िे कलए
minutes. If one days production is processed by सों साकित किर्ा जा सिता है । र्कि एि किन िे
M1 operating alone for ⅓ of the time and M1 उत्पािन िो M1 द्वारा अिेले सों चालन द्वारा 1/3
and M2 simultaneously operating for ⅔ of the समर् िे कलए और M1 और M2 िो एि साथ 2/3
time, then in how many hours total production समर् िे कलए सों चाकलत किर्ा जाता है , तो एि किन
िा िुल उत्पािन कितने घोंटे में पू रा होगा?
of one day will be completed?
(a) 2 (b) 3 (c) 4.5 (d) 4.8
a) 50
b) 40 For Detailed Solution & Approach,
c) 10
Refer the Video:
d) 45
https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
Boston, Churchill and David are three बोस्टन, चकचयल और डे कवड तीन िमय चारी हैं ,
workers, employed by a contractor. They कजन्ें एि ठे िेिार ने कनर्ुक्त किर्ा है । वे पू रे
completed the whole work in 10 days. िाम िो 10 किनोों में पू रा िरते हैं । प्रारों भ में
Initially all of them worked together, but उन सभी ने एि साथ िाम किर्ा, ले किन
the last 60% of the work was completed अोंकतम 60% िाम िेवल चकचयल और डे कवड ने
by only Churchill and David together. कमलिर पू रा किर्ा। बोस्टन ने चकचयल और
Boston worked with Churchill and David डे कवड िे साथ शुरुआती िो किनोों ति ही
only for initial two days then he left the िाम किर्ा, किर खराब स्वास्थ्य िे िारण
work due to his poor health. Also उन्ोोंने िाम छोड़ किर्ा। साथ ही चकचयल िो
Churchill takes 20% less time to finish the अिेले िाम िरने वाले डे वी िी तु लना में
work alone than that of David working अिेले िाम खत्म िरने में 20% िम समर्
लगता है । र्कि उन्ें पू रे िार्य िे कलए 3000
alone. If they were paid Rs. 3000 for the
रुपर्े िा भु गतान किर्ा गर्ा, तो िम से िम
entire work, then what is the share of
िुशल व्यल्पक्त िा कहस्सा क्या है ?
least-efficient person?
(a) Rs. 900
(b) Rs. 1200
(c) Rs. 1000
(d) none of these For Detailed Solution & Approach,
Refer the Video:
https://www.youtube.com/watch?v=NnHawIe7bXc&t=7729s
Working together B and C take 50% more
number of days than A, B and C together
take and A and B working together, take
8/3 more number of days than A, B and
C take together. If A, B and C all have
worked together till the completion of
the work and B has received Rs. 120 out
of the total earning of Rs. 450, then in
how many days did A, B and C together
complete the whole work?
(a) 10 days
(b) 6 days
(c) 4 days
(d) 2 days