Inspected by Test Doc JOBASM 0005

Khawarizmi & Zulhilmi SO No AMTC/ECPJ1030


AUTOSTRIP MACHINE INSPECTION QC Team Dept Incharge AUTOSTRIP SECTION
FORM / CERTIFICATE Verified by Inspec on Date 20/12/22
Mr Lim
Machine No ASM38C 1222-01-02
QC Head
Project : American Medical Telesis Corpora on
Autostrip Machine Specifica on
Robot Arm Model Chain Pitch Sprocket Roller Arm Model Frame Colour Machine Type
28 Arm 90 mm 50.8 mm √ MQ Swing Head √ Blue √ New √
32 Arm 95 mm 60 mm Y-Fork Swing Head Other Recon
38 Arm √ 100 mm √
42 Arm 110 mm

1) Machine Main Frame


1.1) Frame Visual and Appearance Check 1.2) Frame Dimension Check
Dimension Drawing Tolerance Range Actual Error Result
Part /mm /mm /mm Length/mm /mm PASSED / FAILED
3455-
Length 1 3550 ±5
3555
3550 - PASSED
995-
Length 2 1000 ±5
1005
1000 - PASSED
995-
Length 3 1000 ±5
1005
1000 - PASSED

Length 4 375 ±5 370-380 374 - PASSED

Length 5 890 ±5 885-895 892 - PASSED

Length 6 400 ±5 395 - 405 398 - PASSED

Length 7 942 ±5 937-947 942 - PASSED

Length 8 842 ±5 837-847 842 - PASSED

Welding Pain ng No Rust/Dented 2) Machine Accessories & Parts


Checking Part Quality Quality Surface 2.1) Machine Accessories & Parts Visual Check
Side 1 √ √ √
Pain ng No Rust/Damage
Side 2 √ √ √
Quality Part
Side 3 √ √ √ Item
Side 4 √ √ √ Moving Wheels (4 units) √ √
Side 5 √ √ √ Front Drive Sprocket (4 units) & Keyway √ √
Side 6 √ √ √ Main Chain (c/w Rota ng Sha , Bearing & Plate) √ √
Result = PASSED PASSED PASSED S/S Top Cover √ √
Remark = Frame pain ng and welding quality all ok. No rust and S/S Bearing Cover √ √
dented surface found. Result = PASSED PASSED
Remark = Frame pain ng and welding quality all ok. No rust and dented surface
found.
3) Gripper Arm Set = MQ Type 4) Railway System Part
3.1) Gripper Arm Visual and Appearance Check 4.1) Railway System Part Visual and Appearance Check
Welding Pain ng
Arm Sets Quan ty Condi on Condi on
MQ Arm Parts Railway Parts Quality Quality
Centering Block √ √ Gripper Arm Railway √ √ √
MQ Fork √ √ Open Sta on √ √ √
Main Drive U-Housing √ √ Close Sta on √ √ √
Bearing P-Casing √ √ Discharge Sta on √ √ √
Gripper Arm Set (Le & Right) Arm 1 - √ √ Release Sta on √ √ √
Sliding S/S Roller Arm 38 (All √ √ Discharge Sta on Adjuster √ √ √
Housing Plate 38 arms) √ √ Auto Greece Dispancer √ √ √
Puliing Spring Long √ √ Parking Sta on Guide √ √ √
Y-Guide Set √ √ Brush for Greece flow √ √ √
SS Dust Shield √ √ Result = PASSED PASSED PASSED
Screws,nuts and small bearing √ √
Remark = Railway System Parts welding, pain ng and condi on all ok.
Result = PASSED PASSED
Remark = All 38 arms installed ok. No rust part and all arm parts got
sufficient quan ty.
5) Whole Parts of Machine
5.1) Final QC Check
Screw, nuts and bolt ghtening for Sprocket Allignment
Chain Tensioning Check No Corrosion Found (All Parts)
sha s, track and arms Check
Condi on √ √ √ √
Result = PASSED PASSED PASSED PASSED
Remark = All Machine Parts (Machine frame, machine accessories, gripper arm sets and railway system parts) got QC PASSED.