Professional Documents
Culture Documents
Boes C Swot
Boes C Swot
B. Strengths – Opportunities
S O SWOT Recommended Actionable Strategies
Initiated “Project SOAR”, a practice which
means to rise or increase, which solicited Conduct an Alumni Homecoming Activity which aims
S7 donations from schools, stakeholders, alumni to raise funds for the provision of school supplies.
and community for providing school supplies
S7 O1
to learners in need.
If the Alumni will continue to provide school SO5.7: Increased financial contribution from local
O1 supplies, then the learners will have adequate and international partners by 2028.
supplies for learning.
S5 O4 S5 Implemented the "Project SCALE", that aims to Conduct a Stakeholders Convergence to tap school
acquire an MRF that resulted to the increase of partners in taking part to achieve Very Good DRRM
DRRM level from needs improvement to good Level through financial support and services.
by school year 2019-2022.
S O SWOT Recommended Actionable Strategies
If the stakeholders will continue to provide
financial support then maintenance of school SO 4.8: Achieved 100% learners are in safe
O4
facilities will be ensured for the safety and
schools annually.
comfort of learners.
Implemented the School Feeding Program to Implement “Gulay para sa Kalusugan” a project which
address the severely wasted and wasted aims to involve the 4Ps in making and sustaining a
S2 learners which resulted to the improvement of vegetable garden in school to support the school’s
the nutritional status from 65 to 11 (83%)
feeding program and decrease the severely
S2 02 learners.
wasted/wasted learners.
If the feeding program to address the severely
wasted /wasted will be supported by the
02 SO 4.9: Achieved at least 80% leaners have
parents it will result to the improvement of the
nutritional status of the learners improved health statistics (BMI) by 2028.
Implemented "Project LAN", (Literacy and Strengthen the partnership of the school with the LGU
Numeracy) that aims to address the non- to support the Reading and Math Programs which will
numerates learners that resulted to the
S4 result to the increase in the performance level of
decrease from 50 to 10 learners for school year
learners in literacy and numeracy.
2019-2020
O6 O6. If the LGU will support the Literacy and SO3.3.1 Achieved at least 80% learners attained
the Numeracy Program of the school then the nearly proficient level or better in stage 1 learning
learners’ performance level in reading and standards of English by 2028
numeracy will improve.
SO3.3.2 Achieved at least 83% learners
attained nearly proficient level or better in stage 1
S O SWOT Recommended Actionable Strategies
learning standards of Filipino by 2028
SO3.3.3 Achieved at least 80% of learners
attained nearly proficient level or better in stage 1
learning standards of Mother Tongue by 2028
SO3.3.4 Achieved at least 75% of learners
attained nearly proficient level or better in stage 1
learning standards of numeracy by 2028
C. Opportunities - Weaknesses
O W SWOT Recommended Actionable Strategies
If the stakeholders will continue to provide Implement “SEF ka Dito” to submit resolution through
financial support then maintenance of school the SPTA to Local Government Unit for provision of
O4
facilities will be ensured for the safety and Special Education Fund (SEF) for the repair of
comfort of learners.
O4 W4 identified school facilities for major repairs
Incomplete enclosure of perimeter fence which
W5 resulted to "LOW" points in Pilar 1 (Safe SO 4.8: Achieved 100% learners are in safe
Learning Facilities) Category schools annually.
If the stakeholders will continue to provide Implement Project SCALE (Safe Community Attains
financial support then maintenance of school Learning Excellence) for repair and construction of
O4
facilities will be ensured for the safety and hand washing facilities
O4 W5 comfort of learners.
Not functional gender segregated toilets which
W5 resulted to "2 Star" rating under Sanitation SO5.1.1: Maintained/Improved SBM level of
Category for SY: 2020-2022 practice by 2028