Professional Documents
Culture Documents
Sales Kit Aspire 14.11.2022
Sales Kit Aspire 14.11.2022
ASPIRE RESIDENCE,
CYBERJAYA
MAKLUMAT JUALAN PROJEK
LOKASI PROJEK
MAKLUMAT JUALAN PROJEK
LOKASI PROJEK
MAKLUMAT JUALAN PROJEK
MAKLUMAT PROJEK
a) 3 BLOK PEMBANGUNAN PANGSAPURI 25 TINGKAT (1168 UNIT TERMASUK 24 UNIT KEDIAMAN OKU)
b) 2 BLOK BANGUNAN TEMPAT LETAK KERETA 7 ½ TINGKAT BESERTA 6 UNIT PENCAWANG ELEKTRIK
DAN BILIK-BILIK MEKANIKAL
c) 1 UNIT RUMAH KELAB YANG MENGANDUNGI DEWAN SERBAGUNA, KOLAM RENANG, PEJABAT
PENGURUSAN, TADIKA, RUANG SOLAT, BILIK PERMAINAN DAN BILIK BACAAN
d) 2 UNIT PONDOK PENGAWAL DAN 1 UNIT KEBUK SAMPAH
DI ATAS SEBAHAGIAN PT 50496 (HSD 36145), CYBER 10, CYBERJAYA MUKIM DENGKIL DAERAH
SEPANG, SELANGOR DARUL EHSAN
Keluasan : 38.35 ekar
Jangkaan Tarikh Siap :
Blok 1 : SEPTEMBER 2023
Blok 2 : SEPTEMBER 2023
Blok 3 : SEPTEMBER 2023
No. Lesen Pemaju : 14153/04 – 2025/0146(R)
Tempoh Sah : 24/03/2022 -05/04/2025
No. Permit Iklan : 14153-1/02 – 2023/0133 (R)-(S)
Tempoh Sah : 24/02/2022 – 23/02/2023
Jenis Pegangan Tanah : Pegangn Bebas
Caj Penyelenggaraan : 0.27 sen / kps + 10% sinking fund
MAKLUMAT JUALAN PROJEK
SUSUN ATUR PEMBANGUNAN
PEMBANGUNAN MASA
HADAPAN
PEMBANGUNAN MASA
HADAPAN
PEMBANGUNAN MASA
HADAPAN
MAKLUMAT JUALAN PROJEK
KOMPOSISI PEMBANGUNAN
HARGA
KELUASAN JUALAN
BLOK JENIS BIL UNIT CATATAN
(Kaki Persegi) BERMULA DARI
RM
1 UNIT OKU /
B 900 8 280,000.00
TIADA BALKONI
JUMLAH 392
A 900 372 280,000.00 TIADA BALKONI
2
C 1,608 4 531,015.26 BERBALKONI
PEMBANGUNAN
MASA HADAPAN
D 1,175 4 413,380.00 BERBALKONI
JUMLAH 388
UNIT OKU /
B 900 8 280,000.00
TIADA BALKONI
JUMLAH 388
Facing shoplot
Facing shoplot
MAKLUMAT JUALAN PROJEK
KEMUDAHAN PROJEK
KOLAM RENANG
TERIMA KASIH