Rotary Vertical Circulation


Installation Instruction Manual
Table of contents
I. Overview........................................................................................................................................................................................3
1 Introduction......................................................................................................................................................................... 3
2. Description......................................................................................................................................................................... 3
3. Safety Instructions......................................................................................................................................................... 3
4.technical parameter........................................................................................................................................................... 4
2. Schematic diagram of the overall installation and parts..........................................................................................5
1. Schematic diagram of the overall and parts........................................................................................................... 5
1.1. Schematic diagram of final assembly.............................................................................................................5
1.2. Schematic diagram of the frame part.............................................................................................................6
1.3. Schematic diagram of the driving part......................................................................................................... 7
1.4. Schematic diagram of chain and tray guide part....................................................................................... 8
2,Schematic diagram of components................................................................................................................................... 9
2.1. Schematic diagram of the framework.............................................................................................................10
2.2. Schematic diagram of the drive..................................................................................................................... 10
2.3. Schematic diagram of the column...................................................................................................................10
2.4. Schematic diagram of tray...............................................................................................................................11
2.5. Chain diagram.......................................................................................................................................................11
2.6. Schematic diagram of tray orientation.......................................................................................................12
2.7. Schematic diagram of the central beam diagonal bracing..................................................................... 12
3. Installation steps and key size requirements..............................................................................................................13
1. Overview of the overall installation process..................................................................................................... 13
2. Installation process description............................................................................................................................. 13
2.1. On-site assembly stage.....................................................................................................................................14
2.2. Construction preparation and foundation acceptance stage.................................................................17
2.3. On-site assembly of the main frame stage................................................................................................................. 20
4. Vertical circulation acceptance inspection standard................................................................................................25

the first1page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

一、Overview
1、foreword
The purpose of this installation manual is to guide the installation of the vertical
circulation three-dimensional garage, including the hoisting operation when the equipment
is unloaded, the hoisting operation when the equipment is assembled, the hoisting operation
when the equipment is installed, and the electrical construction and debugging in the later
stage. Every person responsible for installation and maintenance should read, understand
and use this installation manual carefully.
2. Description
(1)of this installation manual right of interpretation owned by the company.
(2)This installation manual applies only to Corresponding specifications of vertical
circulation three-dimensional garage.
(3)Instructions included in the installation manual,Regulations and information may
be incomplete.
(4)in this installation manual illustration and diagrams show important design details,
but in For dimensional accuracy and detail Not binding:
3. Safety Instructions
(1) The following basic instructions shall apply to all processes of installation work.
(2) Always follow the principle of safety first during installation.
(3) Please ensure that installation personnel read and understand all safety instructions,
and follow these instructions when installing the equipment.
(4) In addition to this manual, the general effective laws and regulations related to
accidents and other binding regulations should also be observed.
(5) The installer must wear safety helmet and safety belt during the whole installation
project.
the first2page total45Page
Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

4、technical parameter
see table below

Specifications table
device name Vertical circulation mechanical parking equipment
(PCX*-**Floor)
Equipment type Independent
Access type Bottom access
Number of parking Total parking spaces
***
length ***mm

Car size width ***mm


high ***mm
weight ***kg
drive mode chain
drive part Motor output power (kw) **
Rated speed (m/min) **
Operation method Push button or swipe card
In and out type Enter the garage before, exit the garage in reverse
control method PLC automatic control
power supply AC380V50HZ, three-phase five-wire system

2. Schematic diagram of the overall installation and parts


1、Overall and Parts Schematic Diagram
1.1. Schematic diagram of final assembly

the first3page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

the first4page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

1.2. Schematic diagram of the frame part

the first5page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

1.3. Schematic diagram of the driving part

the first6page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

1.4. Schematic diagram of chain and tray guide part

the first7page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

2、Schematic diagram of components


2.1. Schematic diagram of the framework

2.2. Schematic diagram of the drive

the first8page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

2.3. Schematic diagram of the column

2.4. Schematic diagram of tray

the first9page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

2.5. Chain diagram

2.6. Schematic diagram of tray orientation

the first10page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

2.7. Schematic diagram of the central beam diagonal bracing

3. Installation steps and key size requirements


1. Overview of the overall installation process
(2) Construction preparation and foundation acceptance stage
(3) Equipment arrival and hoisting stage
(4) On-site assembly of the main frame stage
(5) Main frame hoisting stage
(6) The installation stage of the main drive shaft, center beam, and diagonal bracing
(7) Tray assembly installation stage
(8) Main frame verticality adjustment stage
(9) Pallet-oriented operation and debugging stage
(10) Installation and commissioning of the electrical control system
(11) Operation and debugging stage of the whole machine
(12) Self-check stage
the first11page total45Page
Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

(13) Project installation acceptance stage


2. Installation process description
2.1. Construction preparation and foundation acceptance stage
2.1.1. The division of labor in the construction preparation stage
Operation
serial
Type of work Name license main duty
number
number

Mechanical parking
1 Site person in charge
equipment installation

Mechanical parking
2 security officer
equipment installation

Mechanical parking
3 Installer and Inspector
equipment installation

4 crane driver crane lifting

5 electrician Electrical site supervisor

2.1.2. Tools and equipment testing equipment required for installation


Main construction equipment Main testing instruments

serial serial
device name quantity equipment name quantity
number number

1 50t crane 1 set 1 DS3level 1 set

2 1t, 5t snap ring 4 each 2 500VMegohmmeter 1 set

3 1t, 5tElectric hoist Each 2 set 3 Avometer 1 set

6 meters magnetic line


4 5tjack 2 set 4 1 set
pendant

5 Hydraulic lift platform 1 set 5 1m Steel ruler 1 set

6 open end wrench 6 sets 6 100 mm feeler gauge 1 set

7 Construction 1 7 Laser rangefinder 1

the first12page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

distribution cabinet

8 Hand drill 2 units 8 0-200Vernier caliper 1 set

9 helmet 10 9 5m steel tape measure 3

Double safety rope


10 8 pairs 10 10m steel tape measure 2
harness

11 Tool Cabinet 1 11 level 2

12 quick ratchet wrench 6 sets 12 Theodolite 1 set

Slotted, Phillips
13 torque wrench 2 sets 13 2 each
screwdriver

14 50 meters of rope 4 14 Allen key 2 sets

15 Offset pliers 2

2.1.3. Basic acceptance stage


(1) Basic technical requirements
①The surface of the embedded bolts of the same benchmark should be on the same plane,
the height error should not exceed ±10mm, and the mutual positional dimensional error
should be less than 3mm. The bolts should be exposed to the ground and should be packaged
without damage.
②Check that the diagonal length error of each foot is less than 5mm.

the first13page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

③When the ground concrete is poured, ensure that the level error is ±5mm (the length
is within 8000mm).
④The horizontal error of the adjusting nut of the anchor bolt should be less than 3mm.
⑤ Only after the above conditions are checked and qualified, the next step of
construction can be carried out.
(2) Schematic diagram of basic key dimensions
Figure 1:

the first14page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Figure II:

Figure 3:

the first15page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

2.3. On-site construction stage

installation steps Schematic


1. The equipment is on site,
and the truck is hoisted and unloaded
After the equipment arrives at the
site, the hoisting and unloading area
will pull up the warning belt, and a
special person will be responsible
for the hoisting operation..

the first16page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a.


Reasonably use the sling to fix the
position to ensure that the frame is
lifted horizontally; b. When lifting,
try lifting to see if the hook is in the
center position.

2. Assemble the rear frame of


the equipment
After hoisting, the lower part
of the frame is placed on the
assembling platform to level and
stabilize; after hoisting again, the
upper part of the main frame is
docked with the lower part, and the
connecting screws and pin screws of
the main frame are installed and
tightened.The position of the
triangle plate where the large
chain is disconnected is butted

the first17page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

to form a closure.

Matters needing attention: a. The


main frame of the lower section
must be placed stably and firmly; b.
When the main frame of the upper
section is hoisted, it is leveled and
then lifted, so that it is easy to
connect to the main frame of the
lower section; c. After the upper and
lower main frames are connected to
the fastening screws, the overall
level is adjusted.

the first18page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

3. Install and fix the left and


right uprights of the rear frame
Hang the column and the rear
frame on the same plane, install the
left and right columns in sequence,
pre-tighten the bolts at both ends,
and then pre-tighten the middle bolt
to ensure their position and
verticality, and then tighten them
evenly in sequence. Require.

Matters needing attention: a.


See the picture to distinguish the left
and right columns; b. Adjust the
flatness before the column is lifted;
c. The screws must be fastened in
place at the connection with the
main frame.

the first19page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

the first20page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

4. After installing the large


chain of the frame
Remove the pin nut where the
triangular plate is installed, apply
grease appropriately, place the
triangular plate on the two chain
pins, properly tap and install it in
place, tighten the nut, and install the
split pin as required. The installation
position of the triangular plate is
located under the chain plate, After
the other triangular plates are
installed in place, properly use
external force (reverse chain) to
rotate the large chain, and after
installing all the triangular plates,
adjust the top semicircular guide rail
and tighten the screws.
Matters needing attention: a. Pay
attention to protecting the paint film
when the triangular plate is placed
on the frame; b. Install the split pin
after the pin shaft screw is fastened
in place; c. The triangular plate with
the reset bracket is the front frame.

the first21page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

5. After installation, frame


guide bracket and guide groove
Install the guide bracket first
according to the drawing, and adjust
the installation surface of the guide
groove to a height; install the guide
groove according to the
drawing,Adjust the guide rail
bracket and guide rail
according to the size
requirements of the drawings,
and tighten all the bolts after
meeting the size requirements.

the first22page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a.


Pay attention to the use of gaskets
when installing the guide bracket
and guide groove; b. Clean up the
steel sand leaked from the guide
bracket in time.

the first23page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

6. Assemble the front frame of


the equipment
Before hoisting, place the lower
part of the frame on the assembling
platform, level and stabilize; before
hoisting again, the upper part of the
frame is docked with the lower part,
and the connecting screws and pin
screws of the main frame are
installed and tightened.The
position of the triangle plate
where the large chain is
disconnected is butted to form
a closure.

the first24page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a. The


main frame of the lower section
must be placed stably and firmly; b.
When the main frame of the upper
section is hoisted, it is leveled and
then lifted, so that it is easy to
connect to the main frame of the
lower section; c. After the upper and
lower main frames are connected to
the fastening screws, the overall
level is adjusted. (same as the rear
frame)

the first25page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

7. Install and fix the left and


right uprights of the front frame
Hang the column and the rear
frame on the same plane, install the
left and right columns in sequence,
pre-tighten the bolts at both ends,
and then pre-tighten the middle bolt
to ensure their position and
verticality, and then tighten them
evenly in sequence. Require.

the first26page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a.


See the picture to distinguish the left
and right columns; b. Adjust the
flatness before the column is lifted;
c. The screws must be fastened in
place at the connection with the
main frame.

8. Install the front frame large chain

Remove the pin nut where the

triangular plate is installed, apply grease

appropriately, place the triangular plate on

the two chain pins, properly tap and

install it in place, tighten the nut, and

install the split pin as required. The

installation position of the triangular plate

is located under the chain plate, After the

other triangular plates are installed in

place, use the temporary power supply to

open the motor brake, and use external

force (reverse chain) to rotate the large

chain properly. After installing all the

triangular plates, adjust the top

semicircular guide rail and tighten the

screws.

the first27page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a.


Pay attention to protecting the paint
film when the triangular plate is
placed on the frame; b. Install the
split pin after the pin shaft screw is
fastened in place; c. The triangular
plate with the reset bracket is the
front frame. (same as above)

9,Hoisting front combined


frame and rear combined frame
After reviewing the level
of the adjustment nut of the
foundation, first hoist the
rear frame, maximize the
movement of the column and the
anchor bolts, tighten the
bolts, and then hoist the front
frame to ensure the size between
the front and rear frames (the
column to column is 6050mm,
vertical The distance between
the guide rails is 6040mm).

the first28page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a.


Fix the wire rope to the central
hoisting position of the frame; b.
Select a crane with a suitable
tonnage for hoisting operations; c.
Before hoisting, fix the safety drop
arrester on the frame.

10. Adjust the size of the front and


rear frame according to the
requirements of the drawings. (This
picture is switched according to the
actual situation of the project)

the first29page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

11. From bottom to top, install the


center beam welding and diagonal
bracing in sequence. Use a
theodolite to measure and correct the
verticality of the front and rear
frames to ensure that the verticality
is less than or equal to 2/1000mm,
and the allowable error of the
parallelism of the front and rear
frames is less than or equal to 5mm.
Tighten the connecting bolts.

the first30page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

the first31page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

12. Install the main drive shaft


and pre-tighten the bearing
seat fixing bolts.

the first32page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a. The


front and rear large chain triangle
plates are synchronized; b. There are
two pin screws in the screws at the
connection between the drive shaft
and the chain plate, which are used
diagonally.

13. Install the front and rear motor


drive chains and universal couplings.
Connect the temporary electrical
box, and adjust the verticality of the
motor sprocket and the transmission
sprocket and the tightness of the
chain.

the first33page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

14. Hang the car board and the car


board to the appropriate installation
position

Matters needing attention: a. The


stacking height of the upper hanger
is slightly lower than the lowest
point of the triangular plate; b. The
stacking cover of the car board is
slightly lower than the stacking
height of the upper hanger, which
can be stacked on both sides; c. Pay
attention to the placement direction
of the upper hanger and the car
board.

15. Start to install the car board


hanger
Run the front and rear
triangular plates of the
equipment to the parking space
with the electric power supply,
and fix the chain in the middle
of the main drive shaft.

the first34page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a. Pay


attention to the direction of the oil
nozzle of the bearing seat when
installing the upper hanger; b. Pay
attention to distinguish the front and
rear of the hanger on the car board;
c. Use screws according to the
requirements of the drawing; d.
Install the cover plates on both ends.
16. Start to install the car panel
connecting beam
After the upper hanger is installed in
place, use the temporary power to
run the equipment, and when the
upper hanger runs to the top of the
car board, start to install the car
board connecting beam.

Matters needing attention: a. Two of


the four screws at the connection
between the car board connecting
beam and the upper hanger use pin
screws (diagonal use).

the first35page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

17. Start to install the car board. Fix


the inverted chain at both ends of the
car board hanger, and pull up the car
board to the connection with the
connecting beam at the same time.

Matters needing attention: a. Ensure


the front and rear synchronization
and left-right balance of the car plate
during the lifting process of the car
plate; b. After the car plate is
installed, the splicing seam is glued,
and the glue effect is beautiful and
neat.
18. Start to install the car board
guide frame, the car blocking rod
and the buffer rod. Install the car
board guide frame, the car blocking
rod and the buffer rod according to
the picture.

the first36page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a. There


are three screws on each side of the
car board guide frame, the middle
one is a full-threaded screw, and
both ends are pin screws; b. Pay
attention to the front and back of the
car board guide frame; c. Pay
attention to the installation of the car
blocking rod and buffer rod Screw
waterproof rubber pad.

the first37page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

the first38page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

19. Start installing the equipment


guardrail
Drill holes according to the diagram,
and fasten the guardrail.

Matters needing attention: a. The


installation of the column and the
grid frame to ensure the straightness
and verticality. The installation
requirements of the protective net
must be on a line, the bolts are
fastened, and the mesh cannot be
loosened; b. The reflective stickers
should be firm, not falling off, and
not Open glue.

the first39page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

20. The pallet assembly rotates


forward and reverse for 2 laps
(on-line), check the operation of the
pallet, the coordination between the
guide system and the guide rail,
whether there is any poor operation
or interference, and whether the
pallet is level with the ground when
it runs to the entry and exit position,
according to the Operating
conditions adjust the guide rails.
After adjustment, install all tray
assemblies.

21. Pouring column footing


The non-stretching cement is mixed
evenly with a mixing tool, and a
grouting port is left on the side of the
wooden form for the column foot,
and it is poured at one time.

the first40page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a. The


height of the wooden form work is
slightly higher than the bottom of the
column foot to ensure the solid
filling of the column foot; b. The
consistency of the non-stretching
cement is controlled, and the
wooden form work can be
self-leveling when poured into it; c.
The wooden form work is removed
after the grouting material is formed.
22. Install the electrical system
The electrical part is constructed
according to the drawing, laying
cables, fixing the mounting brackets
of electrical parts, wiring of
electrical parts, wiring of
distribution boxes, etc.

the first41page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: a. The


equipment trunking should be fixed
with a special trunking clip, the
connection between the trunking and
the trunking should be treated
beautifully and treated with glue
protection, and the corners of the
trunking should be cut well to reduce
cable leakage; b. Wiring The thread
that is cut out at the time should be
prepared in a garbage bag and placed
in a garbage bag, and should not be
thrown around.

23. Operation and debugging of the


whole machine
After the equipment meets the
operating conditions, firstly increase
the counterweight to operate the
equipment, and continue to increase
the counterweight if there is no
abnormal operation, so that the
equipment is fully loaded and the
operation is normal.

the first42page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

Matters needing attention: Trial


operation parameter test, test
operation parameter test and
adjustment, stable and reliable
performance; no abnormal noise, no
deformation, no car slide
phenomenon; accurate positioning,
accurate limit positioning

四、Vertical Circulation Acceptance Inspection Criteria

the first43page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

proj
ect
test test
Numb Inspection content Remark
project result
erin
g
①The surface of the embedded bolts of the same
benchmark should be on the same plane, the height error
should not exceed ±10mm, and the mutual positional
dimensional error should be less than 3mm. The bolts
should be exposed to the ground and should be packaged

Basic without damage;


1
verification ②Check that the diagonal length error of each foot
is less than 5mm;
③When the ground concrete is poured, ensure that the
level error is ±5mm (the length is within 8000mm);
④The horizontal error of the adjusting nut of the
anchor bolt should be less than 3mm.
① The distance between the front and rear frame rectangular
tubes is 6050±1mm;
②The distance between the front and rear vertical square steel
guide rails is 6040±1mm;
2 frame part
③ The verticality of the frame and the verticality of the
circulating chain guide rail (frame height: h)
h≤10m, verticality≤2mm;
10m≤h≤25m, verticality≤4mm.

the first44page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070
衡水奇佳停车设备有限公司
Hengshui Qijia Parking Equipment Co.,Ltd

① Check the size of the square steel guide rail of the


circulating chain:
Guide rail spacing error≤±2mm;
Diagonal error of guide rail ≤±4mm;
3 drive part ② Front and back Synchronization of endless chain
triangle plates in the frames error≤5mm;
③ The center lines of the driving sprocket, tensioning
sprocket and driven sprocket are flush, and the transmission
chain runs smoothly without scratching the sprocket.
①Check the pallet guide wheel size:
Guide wheel spacing error≤±2mm;
Diagonal error of guide wheel ≤±4mm;
②The guide wheel runs smoothly in the guide groove without
jamming;
③Check the contact surface of the guide wheel of the pallet on
the guide groove wing plate.
4 tray
The contact surface between the guide wheel and the guide
groove is ≥95%
④The guide wheel is on the same plane in the front and rear
directions, and the misalignment distance is less than or equal
to 10mm
⑤During the operation of the equipment, the shock-absorbing
pad is in close contact with the previous car plate;

the first45page total45Page


Address: South of Hengjing Road and West of Xinqiao New Road, High-tech Zone, Hengshui City
:www.hbqjtc.cn Tel: 400-114-0889 Fax: 0318-2331070