You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


GENERAL LUNA MUNICIPALITY
1 2 3
1 2 3 RECOMMENDING APPROVAL AS TO:

HEAD ARCHITECTURAL SECTION DATE

APPROVED:
LS
C LS
C BUILDING OFFICIAL DATE
STORAGE SLOPE
BEDROOM
B TOILET
B SLOPE SLOPE

A G. 26 PREPAINTED RIB-TYPE ROOFING


UP A
PORCH

CS
CS

A FIRST FLOOR PLAN C R O O F P L A N


AR0
-2 AR0
-2

WOODEN RAILING
1 2 3 BAMBOO CLAD WALL BAMBOO CLAD WALL
NIPA SHINGLES
WOODEN RAILING
WOODEN T&G WALL

TOP OF RIDGE TOP OF RIDGE


LS
C
DN
TOP OF BEAM TOP OF BEAM

B SLOPE
YOGA AREA

A
2ND FFL 2ND FFL

SLOPE G. 26 PREPAINTED
RIB-TYPE ROOFING

CS THATCH ROOFING
FIRST FFL FIRST FFL

NGL NGL

B SECOND FLOOR PLAN D FRO NT EL EV ATIO N E RIGHT SIDE ELEVATION


AR0
-2 AR0
-2 AR0
-2

PROJECT : OWNER : DATE NO. REVISIONS BY DATE SHEET CONTENT SHEET NO.
MICHAEL D. LITANG
ARCHITECT
FIRST FLOOR PLAN
AR.ENP.RMP. MICHAEL D. LITANG UAP SECOND FLOOR PLAN
AS-BUILT PLAN OF MARAJAW HOMESTAY ROOF PLAN
AR-02
REG.NO. : 022956 PTR NO. : REG.NO. : PTR NO. : MA.ANGELA ISABEL B. LAMUG FRONT ELEVATION
23 STO NINO ST., BRGY 11, DAPA, SURIGAO DEL NORTE MOB. # 09288188623 1933322 2 STOREY (GUEST HOUSE 1) RIGHT SIDE ELEVATION
NOTE: THIS DRAWING AS AN INSTRUMENT OF SERVICE IS A PROPERTY OF THE
ARCHITECT. AS SUCH, IT MUST NOT BE REPRODUCED OR COPIED IN PART
DATE : DEC. 31, 2024 DATE : 02-17, 2021 DATE : DATE :
OR IN WHOLE WITHOUT PERMISSION. ALL DRAWINGS ARE TO BE RETURNED CHECKED : DRAWN : MDL SCALE PROJ. NO.
TO THE ARCHITECT WHEN NO LONGER IN USE.
TIN NO. SURIGAO CITY TIN NO. LOCATION: PUROK 5, CATANGNAN, GENERAL LUNA, SURIGAO DEL NORTE ADDRESS: GENERAL LUNA, SURIGAO DEL NORTE
R.A. 545 : 259-120-658 AT : : AT : APPROVED : DATE :03-27-19 AS SHOWN @ 20x30