CONSTRUCTION MANAGEMENT

THE SANCTUARY COLLECTION SDA-Site-010101


NUSAPRATAMA DWIKHARISMA
NEWTON SPRING STR ARC MP EE INF
EMPLOYER
PT. BHAKTI BANGUN HARMONI
SHOP DRAWING APPROVAL POOL BRIDGE MAIN GATE INFRA

CONTRACTOR : PT. LEGNO TROPICALINDO SHOP DRAWING No. : SDA-ARC-MAIN GATE-LG-005


PACKAGE : SUBMISSION No. :
DRAWING REF. :

DRAWING NAME / DESCRIPTION : SUBMIT BY


ROOF MAIN GATE

DARAJAT A. MUAMAR
DRAFTER PROJECT MANAGER
D date 2/25/2023

RECEIVED BY

CM Administration date

REVIEWER NOTES
DRAWING STATUS:
TITLE RO dates R1 dates COMMENTS
NUMBER SIGN + DATE
NS-SD-ARC-GATE-
ROOF PLAN 2/25/2023
RO-LG-01
NS-SD-ARC-GATE-
FRAMING PLAN 2/25/2023
RO-LG-02
NS-SD-ARC-GATE-
SECTION A & B 2/25/2023
RO-LG-03
NS-SD-ARC-GATE-
SECTION C, D, E, F 2/25/2023
RO-LG-04
NS-SD-ARC-GATE-
SECTION G & H 2/25/2023
RO-LG-05
NS-SD-ARC-GATE-
DETAIL 1, 2 & 3 2/25/2023
RO-LG-06

STATUS GAMBAR RETURN TO CONTRACTOR:

APPROVED

APPROVED W/ NOTES

REVISE CONSTRUCTION Mgr PROJECT Mgr ADMINISTRATION


date date date

This Shop Drawing Approval DOES NOT RELEASE contractor's responsibility as the executor of the work. Shop Drawing Numbering Reference:
Contractor MUST re-examine all the details and specifications submitted and those that have been approved. SDA-AR-xxxxxx SDA-MP-xxxxxx
Contractor MUST REPORT to the Construction Management if there are any errors/mistakes that occur in this submission and approval. SDA-ST-xxxxxx SDA-EE-xxxxxx
STR = Structure; ARC = Architecture; MP = Mechanical/Plumbing; EE = Electrical/Electronic; INF = Infrastructure
T7A = House Type 7A; T7B = House Type 7B; T8 = House Type 8; T10 = House Type 10
STATUS : SHOP DRAWING

ARCHITECTS

"The review of this shop drawing is for conformity in the design intent and for
general arragement only, and the consultants neither undertakes nor assumes
any responsibility whatsoever for the accuracy and/or adequacy (in any aspect)
of the shop drawing. The contractor shall be strictly and solely responsible for
discrepancy, error omission, inadequacy or non-compliance (with contract
documents) in the shop drawing"

KEY PLAN

GENERAL NOTES :
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE
BEFORE COMMENCEMENT OF WORKS.

2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN


CONSULTANTS AND RELATED APPROVED SHOP DRAWINGS
(INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO
THE MAIN CONTRACTOR.

3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL


SIZES & DIMENSIONS.

4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR


EACH TRADE / TYPE OF WORKS) ON SITE FOR THE MAIN
CONTRACTOR / CONSULTANTS / OWNERS REPRESENTATIVE'S
COMMENTS / APPROVAL BEFORE PROCEEDING WITH THE SITE WORKS.

REV DATE BY DESCRIPTION


Owner

Architect

PT. PANDEGA DESAIN WEHARIMA (PDW)


Architecture.Urbanism.Planning

Civil And Mep Engineers

Quantity Surveyor

PT AECOM.
South Quarter Building Tower C, 5th Floor, Jl. RA.
Kartini Kav. 8 12430 Jakarta Indonesia,

Contruction Management

Main Contractor
PT. LEGNO TROPICALINDO
Jl. Pagelarang No.89 Rt.05 RW.09 Kel. Jatiwarna
Kec. Pondok Melati Bekasi - 17415
Phone : 021-84977248, 0851 0487 8889,
Fax : 021-84994009
Email : pt_legno_tropicalindo@yahoo.co.id,
website : www.ptlegno.com

Sub Contractor

Project Title:

S
Drawing Title:

Base Drawing from


Architectural
Landscape Scale : As Shown Drawn : AJAT Checked : -
Structural Date : 24 FEB 2023 Engineer : RIZKI Approve : -
MEP Drawing No. Size Rev.
INF A3
STATUS : SHOP DRAWING

ARCHITECTS

"The review of this shop drawing is for conformity in the design intent and for
general arragement only, and the consultants neither undertakes nor assumes
any responsibility whatsoever for the accuracy and/or adequacy (in any aspect)
of the shop drawing. The contractor shall be strictly and solely responsible for
discrepancy, error omission, inadequacy or non-compliance (with contract
documents) in the shop drawing"

KEY PLAN

GENERAL NOTES :
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE
BEFORE COMMENCEMENT OF WORKS.

2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN


CONSULTANTS AND RELATED APPROVED SHOP DRAWINGS
(INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO
THE MAIN CONTRACTOR.

3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL


SIZES & DIMENSIONS.

4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR


EACH TRADE / TYPE OF WORKS) ON SITE FOR THE MAIN
CONTRACTOR / CONSULTANTS / OWNERS REPRESENTATIVE'S
COMMENTS / APPROVAL BEFORE PROCEEDING WITH THE SITE WORKS.

REV DATE BY DESCRIPTION


Owner

Architect

PT. PANDEGA DESAIN WEHARIMA (PDW)


Architecture.Urbanism.Planning

Civil And Mep Engineers

Quantity Surveyor

PT AECOM.
South Quarter Building Tower C, 5th Floor, Jl. RA.
Kartini Kav. 8 12430 Jakarta Indonesia,

Contruction Management

Main Contractor
PT. LEGNO TROPICALINDO
Jl. Pagelarang No.89 Rt.05 RW.09 Kel. Jatiwarna
Kec. Pondok Melati Bekasi - 17415
Phone : 021-84977248, 0851 0487 8889,
Fax : 021-84994009
Email : pt_legno_tropicalindo@yahoo.co.id,
website : www.ptlegno.com

Sub Contractor

Project Title:

S
Drawing Title:

Base Drawing from


Architectural
Landscape Scale : As Shown Drawn : AJAT Checked : -
Structural Date : 24 FEB 2023 Engineer : RIZKI Approve : -
MEP Drawing No. Size Rev.
INF A3
STATUS : SHOP DRAWING

ARCHITECTS

"The review of this shop drawing is for conformity in the design intent and for
general arragement only, and the consultants neither undertakes nor assumes
any responsibility whatsoever for the accuracy and/or adequacy (in any aspect)
of the shop drawing. The contractor shall be strictly and solely responsible for
discrepancy, error omission, inadequacy or non-compliance (with contract
documents) in the shop drawing"

KEY PLAN

GENERAL NOTES :
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE
BEFORE COMMENCEMENT OF WORKS.

2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN


CONSULTANTS AND RELATED APPROVED SHOP DRAWINGS
(INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO
THE MAIN CONTRACTOR.

3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL


SIZES & DIMENSIONS.

4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR


EACH TRADE / TYPE OF WORKS) ON SITE FOR THE MAIN
CONTRACTOR / CONSULTANTS / OWNERS REPRESENTATIVE'S
COMMENTS / APPROVAL BEFORE PROCEEDING WITH THE SITE WORKS.

REV DATE BY DESCRIPTION


Owner

Architect

PT. PANDEGA DESAIN WEHARIMA (PDW)


Architecture.Urbanism.Planning

Civil And Mep Engineers

Quantity Surveyor

PT AECOM.
South Quarter Building Tower C, 5th Floor, Jl. RA.
Kartini Kav. 8 12430 Jakarta Indonesia,

Contruction Management

Main Contractor
PT. LEGNO TROPICALINDO
Jl. Pagelarang No.89 Rt.05 RW.09 Kel. Jatiwarna
Kec. Pondok Melati Bekasi - 17415
Phone : 021-84977248, 0851 0487 8889,
Fax : 021-84994009
Email : pt_legno_tropicalindo@yahoo.co.id,
website : www.ptlegno.com

Sub Contractor

Project Title:

S
Drawing Title:

Base Drawing from


Architectural
Landscape Scale : As Shown Drawn : AJAT Checked : -
Structural Date : 24 FEB 2023 Engineer : RIZKI Approve : -
MEP Drawing No. Size Rev.
INF A3
STATUS : SHOP DRAWING

ARCHITECTS

"The review of this shop drawing is for conformity in the design intent and for
general arragement only, and the consultants neither undertakes nor assumes
any responsibility whatsoever for the accuracy and/or adequacy (in any aspect)
of the shop drawing. The contractor shall be strictly and solely responsible for
discrepancy, error omission, inadequacy or non-compliance (with contract
documents) in the shop drawing"

KEY PLAN

GENERAL NOTES :
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE
BEFORE COMMENCEMENT OF WORKS.

2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN


CONSULTANTS AND RELATED APPROVED SHOP DRAWINGS
(INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO
THE MAIN CONTRACTOR.

3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL


SIZES & DIMENSIONS.

4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR


EACH TRADE / TYPE OF WORKS) ON SITE FOR THE MAIN
CONTRACTOR / CONSULTANTS / OWNERS REPRESENTATIVE'S
COMMENTS / APPROVAL BEFORE PROCEEDING WITH THE SITE WORKS.

REV DATE BY DESCRIPTION


Owner

Architect

PT. PANDEGA DESAIN WEHARIMA (PDW)


Architecture.Urbanism.Planning

Civil And Mep Engineers

Quantity Surveyor

PT AECOM.
South Quarter Building Tower C, 5th Floor, Jl. RA.
Kartini Kav. 8 12430 Jakarta Indonesia,

Contruction Management

Main Contractor
PT. LEGNO TROPICALINDO
Jl. Pagelarang No.89 Rt.05 RW.09 Kel. Jatiwarna
Kec. Pondok Melati Bekasi - 17415
Phone : 021-84977248, 0851 0487 8889,
Fax : 021-84994009
Email : pt_legno_tropicalindo@yahoo.co.id,
website : www.ptlegno.com

Sub Contractor

Project Title:

S
Drawing Title:

Base Drawing from


Architectural
Landscape Scale : As Shown Drawn : AJAT Checked : -
Structural Date : 24 FEB 2023 Engineer : RIZKI Approve : -
MEP Drawing No. Size Rev.
INF A3
STATUS : SHOP DRAWING

ARCHITECTS

"The review of this shop drawing is for conformity in the design intent and for
general arragement only, and the consultants neither undertakes nor assumes
any responsibility whatsoever for the accuracy and/or adequacy (in any aspect)
of the shop drawing. The contractor shall be strictly and solely responsible for
discrepancy, error omission, inadequacy or non-compliance (with contract
documents) in the shop drawing"

KEY PLAN

GENERAL NOTES :
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE
BEFORE COMMENCEMENT OF WORKS.

2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN


CONSULTANTS AND RELATED APPROVED SHOP DRAWINGS
(INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO
THE MAIN CONTRACTOR.

3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL


SIZES & DIMENSIONS.

4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR


EACH TRADE / TYPE OF WORKS) ON SITE FOR THE MAIN
CONTRACTOR / CONSULTANTS / OWNERS REPRESENTATIVE'S
COMMENTS / APPROVAL BEFORE PROCEEDING WITH THE SITE WORKS.

REV DATE BY DESCRIPTION


Owner

Architect

PT. PANDEGA DESAIN WEHARIMA (PDW)


Architecture.Urbanism.Planning

Civil And Mep Engineers

Quantity Surveyor

PT AECOM.
South Quarter Building Tower C, 5th Floor, Jl. RA.
Kartini Kav. 8 12430 Jakarta Indonesia,

Contruction Management

Main Contractor
PT. LEGNO TROPICALINDO
Jl. Pagelarang No.89 Rt.05 RW.09 Kel. Jatiwarna
Kec. Pondok Melati Bekasi - 17415
Phone : 021-84977248, 0851 0487 8889,
Fax : 021-84994009
Email : pt_legno_tropicalindo@yahoo.co.id,
website : www.ptlegno.com

Sub Contractor

Project Title:

S
Drawing Title:

Base Drawing from


Architectural
Landscape Scale : As Shown Drawn : AJAT Checked : -
Structural Date : 24 FEB 2023 Engineer : RIZKI Approve : -
MEP Drawing No. Size Rev.
INF A3
STATUS : SHOP DRAWING

ARCHITECTS

"The review of this shop drawing is for conformity in the design intent and for
general arragement only, and the consultants neither undertakes nor assumes
any responsibility whatsoever for the accuracy and/or adequacy (in any aspect)
of the shop drawing. The contractor shall be strictly and solely responsible for
discrepancy, error omission, inadequacy or non-compliance (with contract
documents) in the shop drawing"

KEY PLAN

GENERAL NOTES :
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE
BEFORE COMMENCEMENT OF WORKS.

2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN


CONSULTANTS AND RELATED APPROVED SHOP DRAWINGS
(INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO
THE MAIN CONTRACTOR.

3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL


SIZES & DIMENSIONS.

4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR


EACH TRADE / TYPE OF WORKS) ON SITE FOR THE MAIN
CONTRACTOR / CONSULTANTS / OWNERS REPRESENTATIVE'S
COMMENTS / APPROVAL BEFORE PROCEEDING WITH THE SITE WORKS.

REV DATE BY DESCRIPTION


Owner

Architect

PT. PANDEGA DESAIN WEHARIMA (PDW)


Architecture.Urbanism.Planning

Civil And Mep Engineers

Quantity Surveyor

PT AECOM.
South Quarter Building Tower C, 5th Floor, Jl. RA.
Kartini Kav. 8 12430 Jakarta Indonesia,

Contruction Management

Main Contractor
PT. LEGNO TROPICALINDO
Jl. Pagelarang No.89 Rt.05 RW.09 Kel. Jatiwarna
Kec. Pondok Melati Bekasi - 17415
Phone : 021-84977248, 0851 0487 8889,
Fax : 021-84994009
Email : pt_legno_tropicalindo@yahoo.co.id,
website : www.ptlegno.com

Sub Contractor

Project Title:

S
Drawing Title:

Base Drawing from


Architectural
Landscape Scale : As Shown Drawn : AJAT Checked : -
Structural Date : 24 FEB 2023 Engineer : RIZKI Approve : -
MEP Drawing No. Size Rev.
INF A3

You might also like