3. CONVENTION :
TOP REINFORCEMENT OF SLAB
SECOND LAYER TO BE INSTALED
(TOP-MOST REINF. LAYER)
S13-450 (TOP-2)
S13-450 (BOT.-1)
10 CENTER-TO-CENTER
SPACING OR REINFORCEMENT
NOMINAL DIAMETER OF BAR (mm)
DEFORMED BAR
2S16 L = 4500
2S16 L = 4500
2S16 L = 4500
2S16 L = 4500
2S16 L = 4500
TOP & BOTTOM BAR
T=120mm
L=4000
450 (S13)
5. ADD.= ADDITIONAL REBAR
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
9
1S16 L = 1500
1S16 L = 1500
8. REFER TO M.E.P DRAWINGS FOR PENETRATION LOCATIONS
L=2000
1S16 L = 2000 1S16 L = 10000 1S16 L = 2000 1S16 L = 2000 1S16 L = 7000 Rev Revisi Keterangan
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
1S16 L = 1500
8
1S16 L = 4000
1S16 L = 1500
Nama Proyek :
2S16 L = 4500
2S16 L = 4500
S10-390 (BOT. 2) ADD.
B RESIDENCE GROGOL
1S16 L = 4000
L=4000
L=4000
PEMILIK PROYEK :
S10-390 (BOT. 2) ADD. S10-390 (BOT. 2) ADD.
7
TRIMMER BAR S16 6 PT.DWITUNGGAL KREASIND
KONSULTAN PERENCANA :
TRIMMER BAR S16
SFL. +49550
T=120mm
S10-390 (BOT. 2) ADD. S10-390 (BOT. 2) ADD.
1S16 L = 2000
1S16 L = 2000
S10-450 (BOT. 1)
L=4000
Mekanikal & Elektrikal :
5 Mechanical & Electrical
PT. POLICIPTA
1S16 L = 2000
Kontraktor Utama
1S16 L = 4500 Main Contractor
2S16 L = 4500 2S16 L = 4500
L=4000
1S16 L = 4500
Kontraktor 2
TRIMMER BAR S16
BAI 25/09/2023
Judul Gambar
R-
B T LEVEL 15
CATATAN REVISI :
BOTTOM SLAB REINFORCEMENT
Reference :