Sub Total 2) -
UPAH
1 Pekerja 190.00 190.00 Oh 70,000 13,300,000
2 Tukang 102.00 102.00 Oh 80,000 8,160,000
Dibuat Oleh,
Kader Teknis Tim Pengelola Kegiatan (TPK)
Desa ................. Desa .....................
................................ ................................
Mengetahui,
Kepala Desa .............
.................................
hal1
HARGA SATUAN BAHAN, ALAT, DAN UPAH
Ø10-15 Ø10-15
Pekerjaan Beton jml = 198.00 m
= P x L x T x jml 6.6. Pek. Beton (K.225), slump (12 ± 2) cm
T = 0.60 x 0.60 x 0.10 x ### = 7.13 m³ Semen = 8.80 x 7.13 = 62.73 zak
L Pasir = 0.52 x 7.13 = 3.72 m³
Batu pecah= 0.76 x 7.13 = 5.44 m³
Ø10 - 15
Ø10
- 15
Pekerja = 1.65 x 7.13 = 11.76 Oh
Tukang = 0.28 x 7.13 = 1.96 Oh
P
Pembesian
Ø 10 = (( P / 0,15) + 1) x L x jml 6.17 Pembesian 1 kg dengan besi
= 5.0 x 0.60 x 198.0 = 594 m Besi Ø 8 = 0.95 x 736.56 = 703.1 kg
= (( L / 0,15) + 1) x P x jml = 1,188.0 : 11.00 = 108.00 ljr
P= 0.6 m T = ### m L = ### m Ø 10 = 5.00 x 0.6 x 198.0 = 594 m Kw. bendra= 0.015 x 736.56 = 11.00 kg
Total = 1,188 m Pekerja = 0.040 x 736.56 = 29.46 Oh
berat = 1188 x 0.62 = 737 kg Tukang = 0.030 x 736.56 = 22.10 Oh
Begisting Begisting
= 0.60 x 0.6 = 71.3 Trileks = 0.14 x 71.28 = 4.16 lbr
Reng 2/3 = 1.00 x 71.28 = bendel
1.00
Paku = 0.02 x 71.28 = 1.07 kg
Pekerja = 0.520 x 71.28 = 37.07 Oh
Tukang = 0.260 x 71.28 = 18.53 Oh
0,6
0,50
0,5
0,15
0,25 5 10, 15
0,15
0,50
,0,10
II PASANGAN BATU BATA 1/2 BATU ( 1 : 6 ) M2
Pasngan Bata
119.00 0.40 95.20
29.00 0.50 29.00
0,50 124.20
148
V Plesteran dan acian tebal 1,5 cm (2X 242 )=484 0.50 0.15
148.00 0.30 133.20 133.20
p=0,21+0,15+0,12=0,48
ANALISA PERHITUNGAN
Harga sat. Bahan Upah Total
No Uraian Analisa Volume Kebutuhan
Rp. Rp Rp. Rp.
A.1 Galian Tanah pondasi untuk tiap m3
Pekerja 0.7500 44.40 m3 33.30 Oh 80,000 2,664,000 2,664,000
A.1 Galian Tanah pondasi untuk tiap m 3
Pembersiahan Lokasi
Pekerja 0.0100 296.00 m3 2.96 Oh 80,000 236,800 236,800
Pekerjaan paving
Pasir Urug = 0.08 x 84.0 = 6.72 m³
Pasang paving Paving = 1.00 x 84.0 = 84.00 m²
V1 = Luas paving Pekerja = 0.27 x 84.0 = 22.67 Oh
I = 119.0 x 0.6 x 2 = 143 m² Tukang = 0.15 x 84.0 = 12.60 Oh
143.00 m²
= 143 - 59.0 = 84.0 m² Pekerjaan paving pengunci
50cm
30cm 10 cm Pasir Urug = 0.08 x 59.0 = 4.72 m³
Mahkota = 1.00 x 1586.7 = 1587.00 bh
30 cm
KANSTIN
Pekerja = 0.27 x 59.0 = 15.94 Oh
Tukang = 0.15 x 59.0 = 8.85 Oh
Delatasi
10cm
10,5 cm
21 cm 21 cm 6 cm
PAVINGSTONE
Mahkota
5 cm
30 cm
RENCANA ANGGARAN BIAYA
Propinsi : Jawa Timur Lokasi : Dsn. ........
Kabupaten : Situbondo Panjang : 119 x 2,2 m
Kecamatan : Cipta Desa
Desa : ...........
............................. .............................
Perencana,
.............................