You are on page 1of 1

PC.

SLAB CALCULATION
PROJECT :
CLIENT :
DATE :
PC. SLAB SIZE 5.00 cm. X 30.00 cm. X 5.00 m.
Clear span 4.90 m. SECTION PROPERTY :
30.00 cm. PRECAST SLAB COMPOSITE SECTION
c = 2.50 cm. Y = 7.61 cm.
10.00 cm. of Topping I = 312.50 cm. 4 Ic = 8733.88 cm. 4
5.00 cm. of Slab St = 125.00 cm. 3 Sct = 1181.85 cm. 3
5 - PC. wire 4.00 mm.(eccentric 1.70 cm. ) Sb = 125.00 cm. 3 Scb = 1147.68 cm. 3
1. MATERIAL PROPERTIES A = 150.00 cm. 2 Ac = 470.71 cm. 2
Note : C.G. from bottom of precast
1.1. CONCRETE 3.2. CHECK ALLOWABLE STRESS
COMPRESSIVE STRENGTH AT SERVICE LOAD fc' = 350 ksc GROSS AREA OF PC.WIRE As = 0.6285 cm. 2
COMPRESSIVE STRENGTH AT TRANSFER fci = 250 ksc JACKING FORCE fs = 14100 ksc
COMPRESSIVE STRENGTH OF TOPPING fct = 400 ksc LOSS
1.2. PC. WIRE ES = (Es/Eci)fcir fcir = 55.90 ksc
MINIMUM TENSILE STRENGTH fpu = 18000 ksc ES = 468.27 ksc
MINIMUM YIELD STRENGTH fpy = 15000 ksc SH = 1200-11RH (RH = 75) = 375.00 ksc
DIAMETER D = 4.00 mm. CR = 12fcir-7fcds (fcds = 0) = 670.80 ksc
NUMBER OF PC.WIRE N =5 RE = 1270-0.4ES-0.2(SH+CR) = 873.53 ksc
2. DESIGN LOAD IMMEDIATELY LOSS
2.1. LIVE LOAD LL = 300 kg/m 2 ES+0.5RE = 905.03 ksc
2.2. DEAD LOAD TOTAL LOSS
DEAD LOAD FROM TOPPING (10.00 cm.) DL 1 = 72 kg/m ES+SH+CR+RE = 2387.60 ksc
DEAD LOAD FROM PC.SLAB DL 2 = 36 kg/m INITIAL FORCE Pi = 8293.04 kg.
2.3. LOAD FACTOR 1.4DL+1.7LL EFFECTIVE FORCE Pe = 7361.24 kg.
3. CALCULATION ( ACI. AND E.I.T CODE ) STRESS RESULTANT
3.1. CHECK LIVE LOAD INITIAL STAGE ALLOWABLE STRESS
MODULUS OF PC.WIRE Es = 2000000 ksc f ti = 88.65 ksc Fti = -12.57 ksc
MODULUS OF CONCRETE f bi = 21.93 ksc Fbi = 150.00 ksc
AT SERVICE Ec = 282495 ksc SERVICE STAGE ALLOWABLE STRESS
AT TRANSFER Eci = 238752 ksc f t = 104.77 ksc Ft = 157.50 ksc
ULTIMATE MOMENT
d = 13.30 cm. f b = -8.27 ksc Fb = -29.75 ksc
fsu = 14100. ksc O.K.
a = 0.87 cm.
Mu = 1026.12 kg-m.
LL = 373.91 kg/m.2
> 300 O.K.