PC.

SLAB CALCULATION
PROJECT :
CLIENT :
DATE :
PC. SLAB SIZE 5.00 cm. X 30.00 cm. X 3.00 m.
Clear span 2.90 m. SECTION PROPERTY :
30.00 cm. PRECAST SLAB COMPOSITE SECTION
c = 2.50 cm. Y = 7.0579 cm.
10.00 cm. of Topping I = 312.50 cm. 4 Ic = 7376.62 cm. 4
5.00 cm. of Slab St = 125.00 cm. 3 Sct = 928.80 cm. 3
2 - PC. wire 4.00 mm.(eccentric 1.70 cm. ) Sb = 125.00 cm. 3 Scb = 1045.16 cm. 3
1. MATERIAL PROPERTIES A = 150.00 cm. 2 Ac = 382.38 cm. 2
Note : C.G. from bottom of precast
1.1. CONCRETE 3.2. CHECK ALLOWABLE STRESS
COMPRESSIVE STRENGTH AT SERVICE LOAD fc' = 300 ksc GROSS AREA OF PC.WIRE As = 0.2514 cm. 2
COMPRESSIVE STRENGTH AT TRANSFER fci = 200 ksc JACKING FORCE fs = 14100 ksc
COMPRESSIVE STRENGTH OF TOPPING fct = 180 ksc LOSS
1.2. PC. WIRE ES = (Es/Eci)fcir fcir = 34.94 ksc
MINIMUM TENSILE STRENGTH fpu = 18000 ksc ES = 327.20 ksc
MINIMUM YIELD STRENGTH fpy = 15000 ksc SH = 1200-11RH (RH = 75) = 375.00 ksc
DIAMETER D = 4.00 mm. CR = 12fcir-7fcds (fcds = 0) = 419.24 ksc
NUMBER OF PC.WIRE N =2 RE = 1270-0.4ES-0.2(SH+CR) = 980.27 ksc
2. DESIGN LOAD IMMEDIATELY LOSS
2.1. LIVE LOAD LL = 400 kg/m 2 ES+0.5RE = 817.34 ksc
2.2. DEAD LOAD TOTAL LOSS
DEAD LOAD FROM TOPPING (10.00 cm.) DL 1 = 72 kg/m ES+SH+CR+RE = 2101.71 ksc
DEAD LOAD FROM PC.SLAB DL 2 = 36 kg/m INITIAL FORCE Pi = 5217.43 kg.
2.3. LOAD FACTOR 1.4DL+1.7LL EFFECTIVE FORCE Pe = 4712.93 kg.
3. CALCULATION ( ACI. AND E.I.T CODE ) STRESS RESULTANT
3.1. CHECK LIVE LOAD INITIAL STAGE ALLOWABLE STRESS
MODULUS OF PC.WIRE Es = 2000000 ksc f ti = 31.67 ksc Fti = -11.24 ksc
MODULUS OF CONCRETE f bi = 37.90 ksc Fbi = 120.00 ksc
AT SERVICE Ec = 261540 ksc SERVICE STAGE ALLOWABLE STRESS
AT TRANSFER Eci = 213546 ksc f t = 58.11 ksc Ft = 135.00 ksc
ULTIMATE MOMENT
d = 13.30 cm. f b = 7.70 ksc Fb = -27.54 ksc
fsu = 14100. ksc O.K.
a = 1.21 cm.
Mu = 632.88 kg-m.
LL = 883.98 kg/m.2
> 400 O.K.