Capacity ………..A
Phase 1/3 phS
Kwh meter Normal Faulty
ACPDB
Main MCB capacity : ………..A
Actual Load : R S T
Actual Voltage : RN SN TN GN
Recti1 MCB capacity : ………..A
Actual Load : R S T
Recti2 MCB capacity : ………..A
Actual Load : R S T
Cek kekencangan : OK NOK
Koneksi MCB ACPDB :
Rectifier1
Type recti :
Main MCB capacity : ………..A
Jumlah modul :
Modul broken : No Yes Jml Broken
PSU/CSU : Normal Faulty
Battery Type :
Battery Qty : …………… bank …………. pcs
Battery condition : Good not good Note :
Rectifier2
Type recti :
Main MCB capacity : ………..A
Jumlah modul :
Modul broken : No Yes Jml Broken
PSU/CSU : Normal Faulty
Battery Type :
Battery Qty : …………… bank …………. pcs
Battery condition : Good not good Note :
Genset
Condition : Working Not working
ATS : Auto Manual
Remark :
DCPDB1
Main MCB Cap A
Actual load main MCB A
Connection Sisir Jumper cable
DCPDB1
Main MCB Cap A
Actual load main MCB A
Connection Sisir Jumper cable
DCPDB1
Main MCB Cap A
Actual load main MCB A
Connection Sisir Jumper cable
Shelter/outdoor
Kebersihan : OK NOK
Kebocoran di Shelter/rack : OK NOK action :
note :
Lubang/kebocoran FEP/Gland : OK NOK action :
note :
Penutup lubang di bawah rack : OK NOK action :
Sarang Hewan : OK NOK action :
Grounding
Grounding Penangkal petir : OK NOK
Main Grounding Perangkat : OK NOK
Busbar : Lower OK NOK
Upper OK NOK
Enb
BBU Alarm ok nok Kebersihan ok nok
Grounding ok nok Fan ok nok
Antenna ok nok
Note :
Mounting ok nok
Note (kelengkapan, berkarat, bengkok, turun, dll):