Project Profile
This project is located in Karachi, Pakistan Defense Housing Authority Phase 8, Emar coastal
Development plot 06, is located in the southern coast of Pakistan, south of the Arabian Sea.
Karachi is the capital of Sindh province, Pakistan's largest city and largest seaport and military
port, the country's industrial and commercial, trade and financial center, and is also an
international airport between southeast Karachi and the Middle East, Africa and Europe.
The project site is flat, the east and south municipal roads are passable, and the external
Overview of Construction
THE CONSTRUCTION OF THE PARK EDGE (RP#06) project is located in the eighth
phase of the Defense Housing Authority, Karachi, Pakistan, Emar Coastal Development plot
06,the project covers an area of about 12,000 square meters, a total construction area of 208,700
square meters, a total of 43 floors, a total height of 152 meters. Construction content: Construction
floors (B2 and B1), ground floor, mezzanine and podium buildings (1 to 4 floors, 4 floors for
fitness and other convenient facilities), more than 5 floors for the main structure of the tower, two
towers with 37 floors; Main work content: main structure construction, electrical engineering,
undergrou
First
nd floors, The
Under the floor
3 local first 6.723m 8533 ㎡
ground building
undergrou floor
area
nd floors
(pool)
4 layers Podium
The Above
(local building4.25 187200
podium Height standar ground
Number sandwich 2 m/tower3.36 ㎡
of d layer area
of floors layers) m
floor
Negative
floor3.450m
Negative
second Undergr
37th Floor underg 21500
tower floor3.000m ound
(5F-42F) round ㎡
Negative area
third
floor3.275m
(-9.725m)
Exterior wall Aluminum curtain wall, ceramic tile finish, paint exterior wall
Decorativ
Tile floor, marble floor, rubber floor, concrete tile floor, C.C floor,
e practice flooring
painted floor
Wall facing Tile walls, plaster and painted walls
waterproo Swimming The swimming pool is decorated with Mosaic tiles and Penetron
Toilet bath
2 coats of Greenseal Flexi 201 of Aquatec / Aquafin 2C of Aquafin
room
Foundation/retai
Beam and slab Shear wall column
ning wall/pool
Tower foundation-L30 为
Type of Hot rolled ribbed bar, minimum yield strength 60ksi (420Mpa), tensile
Interior
wall:
40mm
Outside
basement:
75mm
Sections of towers A and B
Engineering geology, hydrology conditions
Karachi, Pakistan has a pleasant climate for most of the year, with an
The site is basically flat, and it is easy to use the site to arrange
2 Site condition construction roads, mixing stations and some necessary temporary
construction facilities.
This project is located in Karachi, Pakistan Defense Housing
roads on the east and south sides of the project are passable, and the
3 surrounding The municipal facilities in the area where the project is located are
conditions not perfect, with no municipal tap water, no power facilities and no
mixing station.