Introduction of PARK EDGE project in Pakistan

Project Profile
This project is located in Karachi, Pakistan Defense Housing Authority Phase 8, Emar coastal

Development plot 06, is located in the southern coast of Pakistan, south of the Arabian Sea.

Karachi is the capital of Sindh province, Pakistan's largest city and largest seaport and military

port, the country's industrial and commercial, trade and financial center, and is also an

international airport between southeast Karachi and the Middle East, Africa and Europe.

The project site is flat, the east and south municipal roads are passable, and the external

environment is relatively safe.

Overview of Construction
THE CONSTRUCTION OF THE PARK EDGE (RP#06) project is located in the eighth

phase of the Defense Housing Authority, Karachi, Pakistan, Emar Coastal Development plot

06,the project covers an area of about 12,000 square meters, a total construction area of 208,700

square meters, a total of 43 floors, a total height of 152 meters. Construction content: Construction

of 2 high-end multi-storey apartment buildings (towers A and B), construction of 2 basement

floors (B2 and B1), ground floor, mezzanine and podium buildings (1 to 4 floors, 4 floors for

fitness and other convenient facilities), more than 5 floors for the main structure of the tower, two

towers with 37 floors; Main work content: main structure construction, electrical engineering,

generator, HVAC engineering, pipeline engineering, fire engineering.


Architectural design overview

Tower 152m Gross


About Height of 208,700
Floor space Podium floor
12,000 ㎡ building ㎡
19.77m area

undergrou
First
nd floors, The
Under the floor
3 local first 6.723m 8533 ㎡
ground building
undergrou floor
area
nd floors

(pool)

4 layers Podium
The Above
(local building4.25 187200
podium Height standar ground
Number sandwich 2 m/tower3.36 ㎡
of d layer area
of floors layers) m
floor
Negative

floor3.450m

Negative

second Undergr
37th Floor underg 21500
tower floor3.000m ound
(5F-42F) round ㎡
Negative area

third

floor3.275m

(-9.725m)

Exterior wall Aluminum curtain wall, ceramic tile finish, paint exterior wall
Decorativ
Tile floor, marble floor, rubber floor, concrete tile floor, C.C floor,
e practice flooring
painted floor
Wall facing Tile walls, plaster and painted walls

Plaster ceiling, aluminum composite panel ceiling, cement panel


ceiling
ceiling, plaster and paint ceiling

The stairs Marble stair surface

underground waterproofing membrane 2.5 mm thick

roofing 2 coats of Greenseal Flexi 201 of Aquatec / Masterseal 550 of BASF

waterproo Swimming The swimming pool is decorated with Mosaic tiles and Penetron

fing pool waterproof material

Toilet bath
2 coats of Greenseal Flexi 201 of Aquatec / Aquafin 2C of Aquafin
room

Structural design overview

Basics beam plate wall column

Maximum 1000×8 1800×16


Main structure size 2900 250 700
member 00 00

reinforcement D40 D40 D16 D28 D40

Foundation/retai
Beam and slab Shear wall column
ning wall/pool

Tower foundation-L30 为

Strength grade 9000psi

of concrete tower6500psi towerL30-roof 为 8000psi


6500psi
Podium5000psi The podium pillars are7000psi

The pillars near the expansion

joint of the podium are9000psi

Type of Hot rolled ribbed bar, minimum yield strength 60ksi (420Mpa), tensile

reinforcement strength 90ksi (620Mpa)


The length of the raft reinforcement is 48*d;
Joint form of
The length of the upper bar is 48*d, and the length of the lower bar is 60*d.
reinforcement
The length of vertical reinforcement is 60*d。

Bottom plate/cap beam plate wall column

Interior

wall:

40mm

The inner External Inner

beam is wall: column:

Steel shield Top of raft: 50mm 40mm 50mm 40mm


20mm
Bottom and sides of raft :75mm The external Inside Outer

beam is basement: column:

50mm 50mm 50mm

Outside

basement:

75mm
Sections of towers A and B
Engineering geology, hydrology conditions

Number Subsoil formation Bottom buried depth

Sand, gravel, and concrete


1 First floor 1~2m
block filling material 1 ~ 2m

2 The Second floor Thick sand /

3 The Third floor Medium dense sand layer 10~13m

Dense to extremely dense sand


4 The fourth floor 18~25m
layer

5 The fifth floor Hard silty clay layer 28~33m

6 The sixth floor siltstone 60m (Max probe depth)

7 Groundwater is buried 5 ~ 6m below the surface

Weather, site and surrounding conditions

Number item content

Karachi, Pakistan has a pleasant climate for most of the year, with an

average minimum temperature of 13 ° C in winter and an average


Meteorological
1 maximum temperature of 34 ° C in summer. Rainfall is rare, with an
condition
average annual precipitation of only 200 mm. There may be extreme

weather such as typhoons.

The site is basically flat, and it is easy to use the site to arrange

2 Site condition construction roads, mixing stations and some necessary temporary

construction facilities.
This project is located in Karachi, Pakistan Defense Housing

Authority Phase 8, Emar coastal development plot 06, located on the

southern coast of Pakistan, south of the Arabian Sea. The municipal

roads on the east and south sides of the project are passable, and the

The external environment is relatively safe.

3 surrounding The municipal facilities in the area where the project is located are

conditions not perfect, with no municipal tap water, no power facilities and no

sewage facilities. Water storage tank, diesel generator, septic tank

pumping measures need to be set up.

Local commercial concrete is expensive, need to build their own

mixing station.

Time limit for a project plan