You are on page 1of 1

Jon Pio Dinopol hydraulics

ESTIMATE purok 14 small tacunan tugbok Pob. Davao


city
09207766992
dinopol.pio@gmail.com
https://jonpiodinopolhydraulics.business.site/

BILL TO ESTIMATE# EST0001


Cotabato customer
Cotabato city
ESTIMATE DATE 03/10/2023
+63 936 926 4635

DESCRIPTION PRICE QTY DISCOUNT AMOUNT

main pump disassemble/assemble


main pump check up : scope of work 1. check piston/piston
shoe/piston block for worn out 2.check swash plate for worn out
₱35,000.00 1 10.0% ₱31,500.00
and disalignment 3.check pump regulator spool & Rod for damages
4: check valve plate for standard thickness 5. check flow limit
adjustment

check travel speed left & right track


check travel speed left right & right track: scope of work 1.check
₱25,000.00 1 10.0% ₱22,500.00
travel motor for worn out (left & right) 2.check center swivel joint for
internal leak 3.check motor counter balance for worn out

check cylinder leak (boom,arm, buckets)


check all working cylinders for internal leak: scope of work 1.check
₱15,000.00 1 10.0% ₱13,500.00
cylinder piston and piston head for worn out 2.check cylinders for
distortion 3.check packing for damages

check swing motor


check swing motor problem: scope of work 1. check
₱35,000.00 1 10.0% ₱31,500.00
piston/shoe/block for work out 2.check gear and bearing clearance
3.check valve plate for standard thickness

check main control valve


check main control valve problem: scope of work 1. check control
valve block for crack & internal damage 2. check spool distortion 3. ₱60,000.00 1 10.0% ₱54,000.00
check regenerative valve for stuck up 4. check boom lock valve for
worn out 5. check arm Lock valve for worn out

TOTAL ₱153,000.00

TERMS & CONDITIONS:


warranty for 2 moths labor parts not included

Signature:

03/10/2023

Notes:
we do not take advance payment for our labor
after the work complete we send billing

You might also like