Professional Documents
Culture Documents
Mark Scheme
Mark Scheme
3
4 (−)3.5 × 10 J (1) 2
E = CDT in any form OR
89 × (21 − (−18) OR
89 × (3) OR
89 × 39 (1)
- Mark Scheme /
5
6(a) 1.8 × 10 J (1) 2
(E =) VIt (in any form) OR
230 × 13 × 60 OR
230 × 13 OR
3000 (1)
- Mark Scheme /
6(b) –3 –3 4
9.1 × 10 9.1 × 10
1)(
kg / s kg / s
m = E / cΔT (rate =) P /
( any form) cΔT ( any
OR form) OR
5 1)(
1.8 × 10 m = E / cΔT
/ (4200 × 78) and E = Pt
5 3000 / (4200 ×
1.8× 10
78) OR
/ (4200 × 78 ×
230 ×
60) OR
N 13 / (4200 × 1)(
5.5 × 10 OR
N 78) OR
9.1 / 9.2 × 10 N
9.1 / 9.2 × 10
9 (E)= Pt OR 4
in any form words or symbols
OR
9000 × 1.0 OR
9000 J seen (1)
35 – 16 OR
19 (°C) seen (1)
(m) = E /(c∆T) or in any form,
words or symbols OR
9000 / (4200 × 19) (1)
0.11 kg (1)
10(a) (E =) mc∆θ OR 4
65 × 720 × 7 (1)
5
3.3 × 10 (J) (1)
P = E / t in any form OR
(t=) E / P OR
6 3
3.3 × 10 / 1.5 × 10 (1)
220 s (1)
- Mark Scheme /
[Total: 43]