Airport Central railway station is an underground Transperth commuter rail station

at terminals one and two of Perth Airport in Western Australia. The station is
located on the Airport line and is one of three stations that were built as part of
the Forrestfield–Airport Link project, which consists of 8 kilometres (5 mi) of
twin bored tunnels and three stations. Construction began in May 2017 following
preparatory work. By January 2018, excavation was complete, and in May 2018 the two
tunnel boring machines reached the station after tunnelling from High Wycombe. The
machines left the station tunnelling north-west in July, and construction of the
rest of the station started. A 280-metre (920 ft) elevated walkway was built
linking the station to the airport's terminal one. Originally planned to open in
2020, the line and station officially opened on 9 October 2022. The journey to
Perth station takes eighteen minutes.