You are on page 1of 13

1 2 3 4 4' 5 5' 6

21.28 2.83
6.00 6.00 4.60 4.68
3.40 2.10 1.10 2.00 3.40 2.60 2.00 3.25 1.13 .30

A CONCRETE FIREWALL

SS
TRR TRR DN

2.10
FIRE EXIT

2.45
TRR
2.85

CASH W4
ELEVATOR
ELECT'L.
VAULT STAIRCASE
RM.
TRR

3.75
TRR TRR TRR TRR TRR COMFORT
D7 ROOM

ALL
(MALE)
EW D5 GFCI

1.65
D6
CONCRETE FIR

UP TRR

TRR
7.64

D5
2.40

8
PB-2

1.69
L O B B Y COMFORT
W4
TRR ROOM GFCI
4.79

3.24
TRR (FEMALE)

B DN

1.55
2.39

9 10 D2A H A L L W A Y
PB-2A PB-2A
TRR TRR TRR
D2B ACU ACU 1
D5A PB-2A 2
C 5
ACU ACU

D5A TRR TRR TRR TRR


ACU
UTILITY
SPACE
3 PB-2A
PB-2 TRR
1.67

ACU UTILITY ACU PB-2A 4


6

1.98
SPACE
ACU
W3 PB-2A
ACU
ACU TRR TRR TRR PB-2
D TRR TRR TRR
4.04

TRR
1.56

8 W2 TRR TRR

6.72
TRR 7
7
E PB-2A
PB-2A TRR PB-2
TRR
.81

6 CLADDING LINE TRR TRR


TRR D2D

F PB-2A W1
TRR

5 W1A TRR SERVER


CANOPY LINE ROOM
PB-2A TRR

6.15 4.19 .64


.59 1.98 3.87 10.99 3.73
17.43 7.27

SECOND FLOOR POWER LAYOUT PLAN

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. 2F POWER LAYOUT APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
1 2 3 4 4' 5 5' 6
21.28 2.83
6.00 6.00 4.60 4.68 .80 2.02
5
3.40 2.10 1.10 5.40 1.25 2.00 1.43
PB-3
.50 .60
A CONCRETE FIREWALL

SS
TRR TRR TRR
DN

2.10
FIRE EXIT
2.85

ELEVATOR ELECT'L. STAIRCASE W3

3.75
RM. COMFORT
TRR D7
ROOM
(MALE)

EWALL
TRR TRR GFCI
D5

1.65
D6

CONCRETE FIR
UP F U N C T I O N R O O M
AREA = 54.00 SQ.M
7.64

2.40

D5 SS

1.69
L O B B Y COMFORT
W3
ROOM GFCI
4.79

D5
TRR TRR TRR

3.24
(FEMALE)

B DN D3A

1.55
TRR TRR
2.39

5
PB-3A
TRR ACU 1
PB-3A
C 4 ACU
ACU

D5A
D5A
ACU 2

2.88
PB-3A UTILITY PB-3A
3 ACU TRR
SPACE
W3
PB-3A LOANS
D3C
VAULT
D
4.04

P M S H A L L
TRR
1.56

TRR TRR

6.72
E D9

A
.81

RE
6 TRR

YA
TRR
F

3.84
R
PB-3

NT
TRR

PA
.67 1.98 3.87 2.40 8.59 2.04 1.50 3.73
17.50 7.27

THIRD FLOOR POWER LAYOUT PLAN

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. 3F POWER LAYOUT APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
1 2 3 4 4' 5 5' 6
21.28 2.83
6.00 4.60 4.68
4
3.40 2.10 1.10 2.60 2.00 1.25 2.00 1.43
PB-4
.50 .60
A CONCRETE FIREWALL

SS
TRR TRR
DN

2.10
FIRE EXIT
2.85

ELEVATOR ELECT'L. STAIRCASE COMFORT


RM. ROOM
STORAGE STORAGE D7 (MALE)
AREA -1 AREA -2

ALL
GFCI
D5
EW

1.60
D6 TRR
CONCRETE FIR

UP
TRR TRR
7.64

2.40

D5 D5 D5 SS
TRR TRR
COMFORT
W3
ROOM GFCI
4.79

3.29
(FEMALE)

B DN
TRR
2.39

13.75
C ROOF DECK (OPEN SPACE)
1.67

TRR

D
4.04

TRR
1.56

6.76
E TRR TRR
.81

5
F PB-4
TRR

TRR
2.07

.67 16.86 7.46


24.98

FOURTH FLOOR POWER LAYOUT PLAN

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. 4F POWER LAYOUT APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
7 12
PB-1 PB-C

2 CONCRETE FIREWALL 3
EL EL

2.28
PWD TOILET TOILET
ELECT'L.
ELEVATOR RM. STAIRCASE D7
D9 FIRE EXIT
EWALL

D8
D6
CONCRETE FIR

UP
RICE
STORAGE
D4 D12
Area 20.39 SQ.M
EL

EL

A R R I V A L L O B B Y COMMERCIAL SPACE
GENSET
AREA = 67.75 SQ.M
ROOM
FIRE PUMP ROOM
ALARMS

D2 D12
D2 D11

D1
8
ENTRY
PB-1

PRO D12
1 PER
TY L
INE

D12

GROUND FLOOR PLAN


EMERGENCY LIGHT & FIRE ALARM LAYOUT

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. GF EMERGENCY LIGHT AND APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO FIRE ALARM LAYOUT
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
11
PB-2

CONCRETE FIREWALL

EL EL SS
DN
FIRE EXIT
CASH EL W4
ELEVATOR ELECT'L. VAULT STAIRCASE
RM.
COMFORT
D7 ROOM

L
(MALE)
EWAL EL D5
D6 D2C
CONCRETE FIR

UP

D5

L O B B Y COMFORT
W4
ROOM
(FEMALE)
DN

D2A H A L L W A Y

EL D2B
D5A
UTILITY
SPACE
D5A
FIRE
UTILITY ALARMS
SPACE W3
EL
EL

LOANS DEPARTMENT EL ACCOUNTING MANAGER'S


DEPARTMENT OFFICE
W2

EL
12
PB-2
CLADDING LINE D2D
W1

SERVER
W1A ROOM
CANOPY LINE

SECOND FLOOR PLAN


EMERGENCY LIGHT & FIRE ALARM LAYOUT

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. 2F EMERGENCY LIGHT AND APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO FIRE ALARM LAYOUT
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
CONCRETE FIREWALL

EL SS
EL EL DN
FIRE EXIT
EL
ELEVATOR ELECT'L. STAIRCASE W3
RM. COMFORT
D7
ROOM
(MALE)

L EWAL
D5
D6 F U N C T I O N R O O M
CONCRETE FIR
AREA = 54.00 SQ.M
UP

D5 SS

L O B B Y COMFORT
W3
ROOM

D5
(FEMALE)
DN D3A

EL
D5A

D5A
UTILITY FIRE
SPACE ALARMS

EL LOANS
D3C
VAULT
P M S H A L L

D9

EA
AR
EL

RY
8

NT
PB-3

PA
EL
7
PB-3

THIRD FLOOR PLAN


EMERGENCY LIGHT & FIRE ALARM LAYOUT

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. 3F EMERGENCY LIGHT AND APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO FIRE ALARM LAYOUT
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
8
PB-4

CONCRETE FIREWALL

EL EL SS
EL DN
FIRE EXIT
EL
ELEVATOR ELECT'L. STAIRCASE COMFORT
RM. ROOM
STORAGE STORAGE D7 (MALE)
AREA -1 AREA -2
EWALL

D5
D6
CONCRETE FIR

UP
FIRE
ALARMS D5 D5 D5 SS

COMFORT
W3
ROOM
9 (FEMALE)
PB-4 DN

ROOF DECK (OPEN SPACE)

EL

EL

FOURTH FLOOR PLAN


EMERGENCY LIGHT & FIRE ALARM LAYOUT

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. 4F EMERGENCY LIGHT AND APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO FIRE ALARM LAYOUT
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM
3-250mm2 THHN cu. WIRE
in 90mm dia RSC PIPE
RISER DIAGRAM 90mm dia RSC PIPE
(Let 3-200mm2 be minimum)

GENERATOR SET

M 150KVA, 375A, 230V


3PDT 3-250mm2 THHN cu.

350 AT, 3P, CB 350 AT, 3P, CB

MDP
350AT, 3P,

38mm2 cu.
GROUND WIRE SPARE SPARE
150AT,3P 75AT, 3P

60AT,3P 100AT,3P

Note:
100AT,3P 60AT,3P
L.O. use 15AT
3-14mm2 THHN cu. in
C.O. use 20AT 25mm dia PVC Pipe
PBG1
60AT, 3P,CB Note:
20AT 20AT L.O. use 15AT 3-22mm2 THHN cu. in
C2
LIGHTING OUTLET

CONVENIENCE OUTLET
30AT 20AT
LIGHTING OUTLET

SIGNAGE PROVISION
C1
75AT,3P 150AT,3P Note:
C.O. use 20AT
PB4F
32mm dia PVC Pipe

C4 C3 3-14mm2 THHN cu. in 75AT, 3P,CB


30AT 30AT L.O. use 15AT
WATER PUMP ACU 25mm dia PVC Pipe 20AT 20AT
C6 C5 C.O. use 20AT LIGHTING OUTLET LIGHTING OUTLET
20AT 20AT PB3F C2 C1
FIRE ALARM EMERGENCY LIGHT 60AT, 3P,CB 20AT 20AT
C8 C7 CONVENIENCE OUTLET LIGHTING OUTLET
20AT 30AT 20AT 20AT C4 C3
SPARE SPARE LIGHTING OUTLET LIGHTING OUTLET 30AT 20AT
C10 C9 C2 C1 EMERGENCY LIGHT CONVENIENCE OUTLET
20AT 20AT C6 C5
LIGHTING OUTLET LIGHTING OUTLET 20AT 30AT
C4 C3 SPARE FIRE ALARM
Note: 3-22mm2 THHN cu. in 20AT 20AT C8 C7
5.5mm2 cu. CONVENIENCE OUTLET CONVENIENCE OUTLET 20AT 20AT
L.O. use 15AT 32mm dia PVC Pipe C6 C5 SPARE SPARE
GROUND WIRE C.O. use 20AT 20AT 20AT C10 C9
FIRE ALARM EMERGENCY LIGHT
Note: 3-30mm2 THHN cu. in C8 C7
40mm dia PVC Pipe PB2F 20AT 20AT
L.O. use 15AT MAIN 75AT, 3P,CB SPARE SPARE
M C10 C9 8.0mm2 cu.
C.O. use 20AT 20AT 20AT
PB-C LIGHTING OUTLET LIGHTING OUTLET GROUND WIRE
C2 C1
MAIN
20AT
100AT, 3P,CB
20AT CONVENIENCE OUTLET
20AT 20AT
LIGHTING OUTLET
38mm2 cu. 3.0mm2 cu.
LIGHTING OUTLET LIGHTING OUTLET C4 C3
C2
20AT 20AT
C1
CONVENIENCE OUTLET
30AT 30AT
CONVENIENCE OUTLET
GROUND WIRE 3-50mm2 THHN cu. in
GROUND WIRE
CONVENIENCE OUTLET SIGNAGE PROVISION C6 C5
C4 C3 50mm dia PVC Pipe
Note: 30AT 30AT
30AT 30AT
COMPUTER CONVENIENCE OUTLET 3-30mm2 THHN cu. in
L.O. use 15AT 3-38mm2 THHN cu. in ACU ACU C8 C7
50mm dia PVC Pipe C6 C5 20AT 20AT PB2F (ACU) 40mm dia PVC Pipe
C.O. use 20AT 30AT 30AT COMPUTER COMPUTER
ACU ACU C10 C9 MAIN 150AT, 3P,CB PB3F (ACU)
GF-FP C8 C7 20AT 20AT 40AT 40AT 100AT, 3P,CB
150AT, 3P,MCCB 20AT 20AT FIRE ALARM EMERGENCY LIGHT ACU ACU
60AT 30AT
WATER DISPENSER REFRIGERATOR C12 C11 C2 C1 20AT 20AT
JOCKEY PUMP WATER PUMP
C10 C9 20AT 20AT ACU ACU
40AT 40AT C2 C1
C2 C1 20AT 20AT SPARE SPARE ACU ACU
EMERGENCY LIGHT COMPUTER C14 C13 C4 C3 20AT 20AT
30AT 100AT C12 C11 ACU ACU
SPARE FIRE PUMP 40AT 40AT C4 C3
C4 C3 20AT 20AT ACU ACU
SPARE SPARE C6 C5 20AT 20AT
C14 C13 SPARE ACU
30AT 30AT 14mm2 cu. 40AT 40AT C6 C5
ACU 20AT 20AT
SPARE SPARE GROUND WIRE C8 ACU C7
C16 C15 SPARE SPARE
14mm2 cu. 40AT 40AT C8 C7
ACU ACU
GROUND WIRE C10 C9 20AT 20AT
SPARE SPARE
40AT 40AT C10 C9
ACU ACU
14mm2 cu. C12 C11
GROUND WIRE 40AT 40AT
SPARE SPARE
C14 C13 14mm2 cu.
40AT 40AT
SPARE SPARE GROUND WIRE
C16 C15

14mm2 cu.
GROUND WIRE

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : SHEET NO. :

ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. RISER DIAGRAM APPROVED DRAWN BY :

FICCO
FIRST COMMUNITY COOPERATIVE
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 DATE : 01-03-2023 ENGR. ROQUEL ACTUB RAMOS
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY :
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY
COMMENTS APPROVED BY :
Note:
L.O. use 15AT
3-14mm2 THHN cu. in
C.O. use 20AT 25mm dia PVC Pipe
PBG1
60AT, 3P,CB
20AT 20AT
LIGHTING OUTLET LIGHTING OUTLET
C2 C1
30AT 20AT
CONVENIENCE OUTLET SIGNAGE PROVISION
C4 C3
30AT 30AT
WATER PUMP ACU
C6 C5
20AT 20AT
FIRE ALARM EMERGENCY LIGHT
C8 C7
20AT 30AT
SPARE SPARE
C10 C9

5.5mm2 cu.
GROUND WIRE

3-30mm2 THHN cu. in


40mm dia PVC Pipe
M
PB-C
MAIN 100AT, 3P,CB
20AT 20AT
LIGHTING OUTLET LIGHTING OUTLET
C2 C1
20AT 20AT
CONVENIENCE OUTLET SIGNAGE PROVISION
C4 C3
30AT 30AT
ACU ACU
C6 C5
30AT 30AT
ACU ACU
C8 C7
20AT 20AT
WATER DISPENSER REFRIGERATOR
C10 C9
20AT 20AT
EMERGENCY LIGHT COMPUTER
C12 C11
20AT 20AT
SPARE SPARE
C14 C13
30AT 30AT
SPARE SPARE
C16 C15

14mm2 cu.
GROUND WIRE

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : SHEET NO. :

ORO GEOMETRIC BUILDERS INC. 1. SCHEDULE OF LOADS APPROVED DRAWN BY :

FICCO
PTR NO. : 2310128
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 DATE : 01-03-2023 ENGR. ROQUEL ACTUB RAMOS REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY :
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY
COMMENTS APPROVED BY :
SCHEMATIC WIRING DIAGRAM
TO MAIN SPLICING GUTTER (TO MDP)

Note:
L.O. use 15AT 3-38mm2 THHN cu. in
C.O. use 20AT 50mm dia PVC Pipe
GF-FP
150AT, 3P,MCCB
60AT 30AT
JOCKEY PUMP WATER PUMP
C2 C1
30AT 100AT
SPARE FIRE PUMP
C4 C3

14mm2 cu.
GROUND WIRE

Note: 3-22mm2 THHN cu. in


L.O. use 15AT 32mm dia PVC Pipe
C.O. use 20AT
PB2F
MAIN 75AT, 3P,CB
20AT 20AT
LIGHTING OUTLET LIGHTING OUTLET
C2 C1
20AT 20AT
CONVENIENCE OUTLET LIGHTING OUTLET
C4 C3
30AT 30AT
CONVENIENCE OUTLET CONVENIENCE OUTLET
C6 C5
30AT 30AT
COMPUTER CONVENIENCE OUTLET
C8 C7
20AT 20AT
COMPUTER COMPUTER
C10 C9
20AT 20AT
FIRE ALARM EMERGENCY LIGHT
C12 C11
20AT 20AT
SPARE SPARE
C14 C13

14mm2 cu.
GROUND WIRE

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : SHEET NO. :

ORO GEOMETRIC BUILDERS INC. 1. SCHEDULE OF LOADS APPROVED DRAWN BY :

FICCO
PTR NO. : 2310128
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 DATE : 01-03-2023 ENGR. ROQUEL ACTUB RAMOS REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY :
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY
COMMENTS APPROVED BY :
3-50mm2 THHN cu. in
50mm dia PVC Pipe

PB2F (ACU)
MAIN 150AT, 3P,CB
40AT 40AT
ACU ACU
C2 C1
40AT 40AT
ACU ACU
C4 C3
40AT 40AT
ACU ACU
C6 C5
40AT 40AT
ACU
C8 ACU C7
40AT 40AT
ACU ACU
C10 C9
40AT 40AT
ACU ACU
C12 C11
40AT 40AT
SPARE SPARE
C14 C13
40AT 40AT
SPARE SPARE
C16 C15

14mm2 cu.
GROUND WIRE

3-14mm2 THHN cu. in


25mm dia PVC Pipe
PB3F
60AT, 3P,CB
20AT 20AT
LIGHTING OUTLET LIGHTING OUTLET
C2 C1
20AT 20AT
LIGHTING OUTLET LIGHTING OUTLET
C4 C3
20AT 20AT
CONVENIENCE OUTLET CONVENIENCE OUTLET
C6 C5
20AT 20AT
FIRE ALARM EMERGENCY LIGHT
C8 C7
20AT 20AT
SPARE SPARE
C10 C9

3.0mm2 cu.
GROUND WIRE

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : SHEET NO. :

ORO GEOMETRIC BUILDERS INC. 1. SCHEDULE OF LOADS APPROVED DRAWN BY :

FICCO
PTR NO. : 2310128
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 DATE : 01-03-2023 ENGR. ROQUEL ACTUB RAMOS REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY :
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY
COMMENTS APPROVED BY :
PB-4

PB-3 PB-3A

MDP-MAIN PB-2 PB-2A


DISTRIBUTION
MTS-MANUAL PANEL
TRANSFER
SWITCH

MCB-MAIN
N
CIRCUIT
BREAKER
E
M

PB-1 PB-FP PB-C

E ONE-LINE DIAGRAM
NOT TO SCALE

GENERAL NOTES: WIDE SERIES TYPE SWITCH


ALL ELE TR AL OR S ERE N S ALL E ONE N A OR AN E LEGEND AND SYMBOLS: ( NATIONAL BRAND)

T T E RO S ONS O T E LATEST E T ON O T E L NE CHAVEZ


ST.
BRIDGE HOTEL EXPRESS

ELE TR AL O E R LES REG LAT ONS AN RE RE ENTS O T E CHAVEZ


ST.

LO AL A T OR T ES T AT A E R S T ON O ER T E RO E T AN
O T E LO AL T L T O AN ES OR ELE TR AL AN GRAND CENTRAL

O N AT ON

E.
ES AV
HAYES

O ER SER E TO T E L NG S ALL E ø + GROUND, &


ST.

AL
CORR
60HZ CHINGKEE TEA HAYES
ST.
XAVIER UNIVERSITY

3. UNLESS OTHERWISE INDICATED. ALL WIRING METHOD SHALL BE DONE


IN INTERMEDIATE METAL CONDUIT (IMC) FOR POWER SERVICE GAERLAN
ST. HAYES
ST.

ENTRANCE AND ALL EXPOSED WIRING SUBJECT TO MECHANICAL


DAMAGE JEDDY FRIED CHICKEN

.
YO ST
4. ALL ELECTRICAL MATERIALS/EQUIPMENTS TO BE USED SHALL BE NEW
CASA AZUCENA

PABA
1.07

E.AV
AND OF THE APPROVED TYPE IN ACCORDANCE WITH DRAWINGS AND

ALES
CORR
SPECIFICATIONS FOR BOTH LOCATION AND PURPOSE. FICCO DORMITEL

5. UNLESS OTHERWISE SPECIFIED IN THE PLANS, THE MINIMUM SIZE OF


1.37
DOLORES ST.
DOLORES ST.

WIRE AND CONDUIT TO BE USED SHALL BE 3.5MM2 T N AN


STEEZY CELLPHONE

Ø STORE

18TH ST.
RES E T EL ALL RES S ALL E NS LATE OR E E T AS THIS SITE FORT SANTIAGO

S E E N T E LANS 1ST ST.

ALL NON RRENT ARR NG ETAL ARTS O ELE TR AL


TO
MA
S
SA
CO FB DORMITEL SUITES
ST

E ENT ANEL OAR OT ER E ES S ALL E E E T EL 3-GANG UNIVERSAL OUTLET


.

( NATIONAL BRAND)
ON E TO GRO N
T E ENT RE ELE TR AL OR S ERE N S ALL E ONE N ER
RE T S ER S ON O A O ETENT REG STERE ELE TR AL
ENG NEER V I C I N I T Y M A P
ERE SO RE RE RO E ALL TT NGS O ES OR ALL S STE S
0.30

NDTS
SE RE T OLOR RE OR L NE ELLO OR L NE L E OR
L NE AN GREEN OR GRO N
RE E TA LE O TLETS ST E TA ER RES STAN E FIN. FLOOR LINE

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : SHEET NO. :

ORO GEOMETRIC BUILDERS INC. 2310128 1. SCHEDULE OF LOADS APPROVED DRAWN BY :

FICCO
PTR NO. :
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 DATE : 01-03-2023 ENGR. ROQUEL ACTUB RAMOS REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY :
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY
COMMENTS APPROVED BY :
1 2 3 4 4' 5 5' 6
5.0

E
1.06 21.28 0

L IN
ING
3.40 2.10 1.00 4
1.20 4.68
4

ILD
PB-1 .85 PB-C 1.25 3.43

BU
2 3
A CONCRETE FIREWALL

TRR TRR

2.15
TRR

2.28
PWD TOILET TOILET W5
ELECT'L.
ELEVATOR RM. GFCI 10 GFCI STAIRCASE
3.70

D9 FIRE EXIT
PB-C
ALL
D8
EW

D6 WATER 5
TRR
CONCRETE FIR

DISPENCER
UP PB-C
TRR
RICE
7.64

STORAGE ACU
D4 TRR
Area 20.39 SQ.M

4.84
TRR TRR TRR

11
B
3.94

11.68
A R R I V A L L O B B Y PB-C COMMERCIAL SPACE 6
GENSET TRR
ROOM 5
TRR AREA = 67.75 SQ.M PB-C
TRR
PUMP ROOM ACU
ACU PB-1
COMPUTER

1.30
D2

C D2 D11

TRR
1.67

D1
TRR
7
3.00

ENTRY PB-C
8
D
4.04

9 PB-C
ACU
PB-C
1.57

E 1
PRO
PER
TY L
TRR REF
ACU

1.30
INE
.80

F D12

1.99 4.41
5
6.41 1.90 2.20 1.15 3.98 6.20

21.83

GROUND FLOOR POWER LAYOUT PLAN

PRC NO. : 002842 CHECKED BY: PROJECT NAME : APPROVED BY: SHEET CONTENT : REMARKS : DATE : 02-28-2023 SHEET NO. :

DRAWN BY : MLJ
FICCO
ORO GEOMETRIC BUILDERS INC. PTR NO. : 2310128 1. GF POWER LAYOUT APPROVED
DESIGN & CONSTRUCT
ZONE 1, BARRA OPOL MIS. ORIENTAL
PROPOSED FOUR STOREY COMMERCIAL BUILDING FIRST COMMUNITY COOPERATIVE - FICCO
DATE : 01-23-2023 REP. BY: EDGARDO A. MICAYABAS DIS - APPROVED DESIGN BY : JCA
FIRST COMMUNITY COOPERATIVE TEL. # (08822) 735912 , TELEFAX # (088) 858-9445 ENGR. ROQUEL ACTUB RAMOS
PROFESSIONAL ELECTRICAL ENGINEER OWNER'S REPRESENTATIVE APPROVED WITH
TIN NO. : LOCATION : CORALES ST. DOLORES ST.,CAGAYAN DE ORO CITY COMMENTS APPROVED BY : JCA / VGM

You might also like