Metrado General
Metrado General
: “MEJORAMIENTO Y AMPLIACION DEL CAMINO VECINAL TETEMINA- SANTA ROSA DE PIHUAN - USCULLPATA - SAN PEDRO DE CACHI - ANYANA, DEL DISTRITO DE SANTIAGO DE
PROYECTO
PISCHA - HUAMANGA - AYACUCHO”.
FECHA : OCTUBRE 2023
2+320.00 4.10
2+330.00 10.00 4.55 43.25
2+340.00 10.00 5.13 48.40
2+350.00 10.00 5.11 51.20
2+360.00 10.00 4.41 47.60
2+700.00 4.09
2+720.00 20.00 4.10 81.90
2+740.00 20.00 4.62 87.20
2+750.00 10.00 5.07 48.45
2+760.00 10.00 5.07 50.70
2+770.00 10.00 4.79 49.30
2+780.00 10.00 4.22 45.05
2+800.00 20.00 4.12 83.40
2+820.00 20.00 4.12 82.40
2+840.00 20.00 4.22 83.40
2+850.00 10.00 4.85 45.35
2+860.00 10.00 5.13 49.90
2+870.00 10.00 5.12 51.25
2+880.00 10.00 4.67 48.95
2+900.00 20.00 4.51 91.80
2+910.00 10.00 5.13 48.20
2+920.00 10.00 4.95 50.40
2+940.00 20.00 4.20 91.50
2+960.00 20.00 4.12 83.20
2+970.00 10.00 4.50 43.10
2+980.00 10.00 4.76 46.30
2+990.00 10.00 4.40 45.80
3+000.00 10.00 4.24 43.20
3+020.00 20.00 4.11 83.50
3+040.00 20.00 4.25 83.60
3+050.00 10.00 4.46 43.55
3+060.00 10.00 4.51 44.85
3+070.00 10.00 4.51 45.10
3+080.00 10.00 4.51 45.10
3+090.00 10.00 4.38 44.45
3+100.00 10.00 4.16 42.70
3+120.00 20.00 4.10 82.60
3+140.00 20.00 4.42 85.20
3+150.00 10.00 4.67 45.45
3+160.00 10.00 4.71 46.90
3+170.00 10.00 4.71 47.10
METRADO DE MEJORAMIENTO
: “MEJORAMIENTO Y AMPLIACION DEL CAMINO VECINAL TETEMINA- SANTA ROSA DE PIHUAN - USCULLPATA - SAN PEDRO DE CACHI - ANYANA, DEL DISTRITO DE SANTIAGO DE
PROYECTO
PISCHA - HUAMANGA - AYACUCHO”.
FECHA : OCTUBRE 2023
3+800.00 5.09
3+810.00 10.00 4.62 48.55
3+820.00 10.00 4.11 43.65
3+840.00 20.00 4.12 82.30
3+860.00 20.00 4.13 82.50
3+880.00 20.00 4.12 82.50
3+890.00 10.00 4.12 41.20
3+900.00 10.00 4.09 41.05
3+910.00 10.00 4.64 43.65
3+920.00 10.00 5.07 48.55
4+200.00 4.13
4+220.00 20.00 4.12 82.50
4+240.00 20.00 4.11 82.30
4+260.00 20.00 4.13 82.40
4+280.00 20.00 4.13 82.60
4+300.00 20.00 4.13 82.60
4+320.00 20.00 4.24 83.70
4+340.00 20.00 4.31 85.50
16+820.00 4.50
16+830.00 10.00 4.51 45.05
16+840.00 10.00 4.51 45.11
16+850.00 10.00 4.52 45.16
16+860.00 10.00 4.50 45.11
16+870.00 10.00 4.52 45.10
16+880.00 10.00 4.52 45.17
16+890.00 10.00 4.50 45.10
16+900.00 10.00 4.52 45.13
16+910.00 10.00 4.52 45.22
16+920.00 10.00 4.50 45.12
16+930.00 10.00 4.53 45.15
16+940.00 10.00 4.51 45.19
16+950.00 10.00 4.51 45.10
16+960.00 10.00 4.53 45.17
16+970.00 10.00 4.51 45.17
16+980.00 10.00 4.51 45.09
16+990.00 10.00 4.52 45.17
17+000.00 10.00 4.51 45.15
17+010.00 10.00 4.50 45.06
17+020.00 10.00 5.31 49.05
17+030.00 10.00 5.53 54.16
17+040.00 10.00 4.90 52.10
17+050.00 10.00 4.50 46.99
17+060.00 10.00 4.87 46.86
17+070.00 10.00 5.53 51.99
16+740.00 4.61
16+750.00 10.00 4.50 45.57
16+760.00 10.00 4.62 45.59
16+770.00 10.00 5.07 48.43
16+780.00 10.00 5.13 51.00
16+790.00 10.00 4.76 49.45
16+800.00 10.00 4.11 44.35
16+810.00 10.00 4.16 41.35
16+820.00 10.00 4.10 41.30
2+320.00 4.10
2+330.00 10.00 4.55 43.25
2+340.00 10.00 5.13 48.40
2+350.00 10.00 5.11 51.20
2+360.00 10.00 4.41 47.60
2+700.00 4.09
2+720.00 20.00 4.10 81.90
2+740.00 20.00 4.62 87.20
2+750.00 10.00 5.07 48.45
2+760.00 10.00 5.07 50.70
2+770.00 10.00 4.79 49.30
2+780.00 10.00 4.22 45.05
2+800.00 20.00 4.12 83.40
2+820.00 20.00 4.12 82.40
2+840.00 20.00 4.22 83.40
2+850.00 10.00 4.85 45.35
2+860.00 10.00 5.13 49.90
2+870.00 10.00 5.12 51.25
2+880.00 10.00 4.67 48.95
2+900.00 20.00 4.51 91.80
2+910.00 10.00 5.13 48.20
2+920.00 10.00 4.95 50.40
2+940.00 20.00 4.20 91.50
2+960.00 20.00 4.12 83.20
2+970.00 10.00 4.50 43.10
2+980.00 10.00 4.76 46.30
2+990.00 10.00 4.40 45.80
3+000.00 10.00 4.24 43.20
3+020.00 20.00 4.11 83.50
3+040.00 20.00 4.25 83.60
3+050.00 10.00 4.46 43.55
3+060.00 10.00 4.51 44.85
3+070.00 10.00 4.51 45.10
3+080.00 10.00 4.51 45.10
3+090.00 10.00 4.38 44.45
3+100.00 10.00 4.16 42.70
3+120.00 20.00 4.10 82.60
3+140.00 20.00 4.42 85.20
3+150.00 10.00 4.67 45.45
3+160.00 10.00 4.71 46.90
3+170.00 10.00 4.71 47.10
3+180.00 10.00 4.71 47.10
3+190.00 10.00 4.72 47.15
3+200.00 10.00 4.69 47.05
3+210.00 10.00 4.44 45.65
3+220.00 10.00 4.22 43.30
3+240.00 20.00 4.12 83.40
3+260.00 20.00 4.13 82.50
3+280.00 20.00 4.13 82.60
3+300.00 20.00 4.13 82.60
METRADO DE MEJORAMIENTO
: “MEJORAMIENTO Y AMPLIACION DEL CAMINO VECINAL TETEMINA- SANTA ROSA DE PIHUAN - USCULLPATA - SAN PEDRO DE CACHI - ANYANA, DEL DISTRITO DE SANTIAGO DE
PROYECTO
PISCHA - HUAMANGA - AYACUCHO”.
FECHA : OCTUBRE 2023
3+800.00 5.09
3+810.00 10.00 4.62 48.55
3+820.00 10.00 4.11 43.65
3+840.00 20.00 4.12 82.30
3+860.00 20.00 4.13 82.50
3+880.00 20.00 4.12 82.50
3+890.00 10.00 4.12 41.20
3+900.00 10.00 4.09 41.05
3+910.00 10.00 4.64 43.65
3+920.00 10.00 5.07 48.55
4+200.00 4.13
4+220.00 20.00 4.12 82.50
4+240.00 20.00 4.11 82.30
4+260.00 20.00 4.13 82.40
4+280.00 20.00 4.13 82.60
4+300.00 20.00 4.13 82.60
4+320.00 20.00 4.24 83.70
4+340.00 20.00 4.31 85.50
2+320.00 4.10
2+330.00 10.00 4.55 0.40 17.30
2+340.00 10.00 5.13 0.40 19.36
2+350.00 10.00 5.11 0.40 20.48
2+360.00 10.00 4.41 0.40 19.04
2+700.00 4.09
2+720.00 20.00 4.10 0.40 32.76
2+740.00 20.00 4.62 0.40 34.88
2+750.00 10.00 5.07 0.40 19.38
2+760.00 10.00 5.07 0.40 20.28
2+770.00 10.00 4.79 0.40 19.72
2+780.00 10.00 4.22 0.40 18.02
2+800.00 20.00 4.12 0.40 33.36
2+820.00 20.00 4.12 0.40 32.96
2+840.00 20.00 4.22 0.40 33.36
2+850.00 10.00 4.85 0.40 18.14
2+860.00 10.00 5.13 0.40 19.96
2+870.00 10.00 5.12 0.40 20.50
2+880.00 10.00 4.67 0.40 19.58
2+900.00 20.00 4.51 0.40 36.72
2+910.00 10.00 5.13 0.40 19.28
2+920.00 10.00 4.95 0.40 20.16
2+940.00 20.00 4.20 0.40 36.60
2+960.00 20.00 4.12 0.40 33.28
2+970.00 10.00 4.50 0.40 17.24
2+980.00 10.00 4.76 0.40 18.52
2+990.00 10.00 4.40 0.40 18.32
3+000.00 10.00 4.24 0.40 17.28
3+020.00 20.00 4.11 0.40 33.40
3+040.00 20.00 4.25 0.40 33.44
3+050.00 10.00 4.46 0.40 17.42
3+060.00 10.00 4.51 0.40 17.94
3+070.00 10.00 4.51 0.40 18.04
3+080.00 10.00 4.51 0.40 18.04
3+090.00 10.00 4.38 0.40 17.78
3+100.00 10.00 4.16 0.40 17.08
3+120.00 20.00 4.10 0.40 33.04
METRADO DE MEJORAMIENTO
: “MEJORAMIENTO Y AMPLIACION DEL CAMINO VECINAL TETEMINA- SANTA ROSA DE PIHUAN - USCULLPATA - SAN PEDRO DE CACHI - ANYANA, DEL DISTRITO DE SANTIAGO DE
PROYECTO
PISCHA - HUAMANGA - AYACUCHO”.
FECHA : OCTUBRE 2023
3+800.00 5.09
3+810.00 10.00 4.62 0.40 19.42
3+820.00 10.00 4.11 0.40 17.46
3+840.00 20.00 4.12 0.40 32.92
3+860.00 20.00 4.13 0.40 33.00
3+880.00 20.00 4.12 0.40 33.00
3+890.00 10.00 4.12 0.40 16.48
3+900.00 10.00 4.09 0.40 16.42
3+910.00 10.00 4.64 0.40 17.46
3+920.00 10.00 5.07 0.40 19.42
4+200.00 4.13
4+220.00 20.00 4.12 0.40 33.00
4+240.00 20.00 4.11 0.40 32.92
4+260.00 20.00 4.13 0.40 32.96
4+280.00 20.00 4.13 0.40 33.04
4+300.00 20.00 4.13 0.40 33.04
4+320.00 20.00 4.24 0.40 33.48
4+340.00 20.00 4.31 0.40 34.20
16+740.00 4.61
16+750.00 10.00 4.50 0.80 36.45
16+760.00 10.00 4.62 0.80 36.47
16+770.00 10.00 5.07 0.80 38.74
16+780.00 10.00 5.13 0.80 40.80
16+790.00 10.00 4.76 0.80 39.56
16+800.00 10.00 4.11 0.80 35.48
16+810.00 10.00 4.16 0.80 33.08
METRADO DE MEJORAMIENTO
: “MEJORAMIENTO Y AMPLIACION DEL CAMINO VECINAL TETEMINA- SANTA ROSA DE PIHUAN - USCULLPATA - SAN PEDRO DE CACHI - ANYANA, DEL DISTRITO DE SANTIAGO DE
PROYECTO
PISCHA - HUAMANGA - AYACUCHO”.
FECHA : OCTUBRE 2023
01.04 SUBDREN
01.04.01 PIEDRA CHANCADA DE 3/4'' EN SUBDREN 529.56 m3
LONGITUDINALES
(2+060 a 2+090) 1 30.00 Area: 0.40 12.00
2+320 a 2+360 1 40.00 Area: 0.40 16.00
2+700 a 3+000 1 300.00 Area: 0.40 120.00
3+000 a 3+300 1 300.00 Area: 0.40 120.00
3+300 a 3+570 1 270.00 Area: 0.40 108.00
3+800 a 3+890 1 90.00 Area: 0.40 36.00
3+890 a 3+920 1 30.00 Area: 0.40 12.00
4+200 a 4+340 1 140.00 Area: 0.40 56.00
16+770 A 16+820 1 50.00 Area: 0.56 28.00
TRANSVESALES
2+090.00 1 10.15 Area: 0.12 1.22
2+360.00 1 7.95 Area: 0.12 0.95
2+800.00 1 7.96 Area: 0.12 0.96
2+900.00 1 10.99 Area: 0.12 1.32
2+960.00 1 10.04 Area: 0.12 1.20
3+060.00 1 12.45 Area: 0.12 1.49
3+100.00 1 10.68 Area: 0.12 1.28
3+150.00 1 8.51 Area: 0.12 1.02
3+350.00 1 12.69 Area: 0.12 1.52
3+460.00 1 8.95 Area: 0.12 1.07
3+520.00 1 7.79 Area: 0.12 0.93
3+570.00 1 7.07 Area: 0.12 0.85
3+800.00 1 9.62 Area: 0.12 1.15
3+860.00 1 10.63 Area: 0.12 1.28
3+890.00 1 10.65 Area: 0.12 1.28
4+218.00 1 19.00 Area: 0.12 2.28
16+770.00 1 14.53 Area: 0.12 1.74
01.05 TRANSPORTES
01.05.01 TRANSPORTE DE MATERIAL GRANULAR D<=1KM 2,519.78 m3k
Ver Hoja de Metrados de Transporte 1 2,519.78
01.05.02 TRANSPORTE DE MATERIAL GRANULAR D>1KM 14,078.47 m3k
Ver Hoja de Metrados de Transporte 1 14,078.47
01.05.03 TRANSPORTE DE MATERIAL EXCEDENTE D<=1KM 7,653.37 m3k
Ver Hoja de Metrados de Transporte 1 7,653.37
01.05.04 TRANSPORTE DE MATERIAL EXCEDENTE A DME D>1KM 41,881.87 m3k
Ver Hoja de Metrados de Transporte 1 41,881.87