PeK - Pengecatan Kantor Desa
PeK - Pengecatan Kantor Desa
KECAMATAN SETELUK
DESA LAMUSUNG
A Bahan / Material
1 Plamir Tembok Kg 57.97 33,750.00 1,956,453.75
2 Cat Dasar Kg 57.97 45,000.00 2,608,605.00
3 Cat Tembok Kg 150.72 73,125.00 11,021,356.13
Jumlah 15,586,414.88
B Upah Pekerja
1 Pekerja OH 11.59 85,000.00 985,473.00
2 Tukang OH 36.52 120,000.00 4,382,456.40
Jumlah 5,367,929.40
C Biaya Umum
1 Papan Nama Kegiatan Ls 1.00 200,000.00 200,000.00
Jumlah 200,000.00
a Real Cost 21,154,344.28
b Biaya Perencanaan 846,173.77
Jumlah ( a + b) 22,000,518.05
Pembulatan 22,000,518.00
Terbilang : Dua Puluh Dua Juta Lima Ratus Delapan Belas Rupiah