ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01

Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 1 of 6
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE OFFICE
PROJECT TITLE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME DARBY
OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 5.10.2023

DESCRIPTION TYPE OF ACTIVITY REASON FOR CHANGES


Non-Legal Non-Routine Incident / Accident
Management of Change (Management System / Process /
Legal Routine
Legal / Equipment / Chemical / etc)
New Activity Yearly Reviewed

PROJECT / CONSTRUCTION TEAM APPROVED BY


DESCRIPTION PREPARED BY REVIEWED BY
(EME Project Management Team – Section Head) (Project Manager / Client Rep)
Signature
Name AMIR NAQIUDDIN AHMAD TAUFIQ KONG WENG WAI HELMY BIN HAMDAN
Designation HSE SUPERVISOR SHO PROJECT MANAGER PROJECT MANAGER / SHO
Date

REQUIRED PPE OTHER SAFETY EQUIPMENT / REQUIREMENTS


Safety Helmet Leather Gloves Respiratory Protection Fire Extinguisher Permit To Work
Safety Shoes / Boot Face Mask Work vest Gas Detector Competency Certificate
Safety Glasses Ear Protection Proper Work Attire Safety Signs Fitness Certificate
Face / Welding Shield Full Body Safety Harness Leather Apron Barricades
Cotton Gloves Double Lanyard Gauntlets Flagman / Signalman
Rubber Gloves Safety Vest Life Line Tag Out / Lock Out

WORK SUPERVISOR : I CERTIFIED THAT I HAVE EXPLAIN THIS HIRARC TO ALL WORKERS
No. Name Position IC No Signature Witness By EME - HSE Signature Date
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 2 of 6
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE OFFICE
PROJECT TITLE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME DARBY
OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 5.10.2023

LIKELIHOOD (L) EXAMPLE RATING SEVERITY (S) EXAMPLE RATING

MOST LIKELY The most likely result of the hazard / event being realized 5 CATASTROPHIC Numerous fatalities, irrecoverable property damage and productivity 5
Approximately one single fatality major or major property damage if hazard is
POSSIBLE Has a good chance of occurring and is not unusual 4 FATAL 4
realized
CONCEIVABLE Might be occur at some time in future 3 SERIOUS Non-fatal injury, permanent disability or minor property damage 3

REMOTE Has not been known to occur after many years 2 MINOR Disabling but not permanent injury 2

INCONCEIVABLE Is practically impossible and has never occurred 1 NEGLIGIBLE Minor abrasions, bruises, cuts, first aid type injury 1

Potential Hazard Examples for Specific Categories: SEVERITY (S) MITIGATION


Slip/trip/fall Back injury LIKELIHOOD (L) 1 2 3 4 5 LOW Safe Working Practices (SWP)
Struck / Against Hazardous chemical 5 5 10 15 20 25 MEDIUM SWP, PTW, HSEMS
Overhead work Contact by/with 4 4 8 12 16 20 SWP, PTW, HSEMS, HSE awareness
HIGH
Burn (heat/chemical) caught/in/on/between 3 3 6 9 12 15 Special procedure, OSH program

Eye injury Strains 2 2 4 6 8 10


Radiation hazard Electrical hazard 1 1 2 3 4 5 NOTE : -

Sharp object SWP : Safe Working Practice


Equipment Environment LOW MEDIUM HIGH PTW : Permit To Works
Fire Gas release (HC/ H2s) HSEMS : Health Safety Management System
Damage (Physical) Spill or loss of containment OSH : Occupational, Safety & Health
Loss of production Dusty HSE: Health, Safety & Environment
Explosion Off-site impact
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 3 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Preparation and a. Poor health and wellness a. Unknown and un All EME employees to comply to site 2 4 8 Site Supervisor /
1 moving to plant areas. identified health (MEDIUM)
Supervisor and team to report to the HSE Engineer
specific medical monitoring and screening Department should any employee take
related issues, may
requirements. Sufficient PPE shall be any chronic medications, or any
result in health
used to prevent exposure to biological / medications which may result in the
related injuries or
chemical / environmental / physical employee being impaired. Symptoms of
events
agents as far as reasonably practicable. dizziness, allergic, confusion, flu and
illness shall be reported to the HSE
Department immediately
b. Unidentified Hazards / a. Employees not Responsible Supervisor and team shall 3 4 12 Site Supervisor /
constant changing of site move to plant . No employee will be allowed to walk in Engineer
informed of (MEDIUM)
conditions whenmoving to as one team and stay on designated walk any area with minimal visibility. No EME
Hazards & Risks
allocated working areas ways, constantly assessing and looking employee to wander in to areas not
may lead to
handed over to , or areas where no EME
incidents / injuries / for change in condition towards working
activity is being conducted
fatal accidents and area
events
c. Man machine interface a. Struck by / run a. Responsible Supervisor and team 2 4 8 Site Supervisor /
shall ensure plant has the right of way. All Contrators employees shall wear Engineer
over by moving (MEDIUM)
. suitable and visible reflective clothing. No
plant or machinery
Contrators employee shall walk in to
may lead to injuries
machinery's blind spots.
/ accidents / fatal or
fatalities
d. Unidentified Hazards a. Employees not a. The Responsible Supervisor and team 2 2 4 Site Supervisor /
whilst conducting task will ensure that hazards are identified A pre start daily safety task instruction ) to Engineer /
informed of (LOW)
and communicated to all employees / be conducted as a team, and Safety
Hazards & Risks
continually monitor the task for new acknowledged by all (signatures). Any
may lead to
arising hazards or change in change to be added to the daily risk
incidents / injuries
conditions. A pre start daily safety task assessment and communicated to team
and fatal accidents
or a serious event instruction to be conducted as a team,
and acknowledged by all (signatures).
Any change to be added to the daily
risk assessment and communicated to
team
e. Congested working Working in close Supervisor and team to ensure a safe 1 3 3 Supervisor and team shall ensure that no Site Supervisor /
distance is
conditions /contractor proximity above / (LOW) activity is conducted above / below or in a Engineer /
interaction below or next to other kept between contractors by means of Safety
unsafe close proximity condition or situation.
contractor activities, communication / hazard
Where there is immediate hazard and risk
not awareof contractor acknowledgement and segregating
posed by surrounding activities /
task specific hazards / working areas (a safe access certificate
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 4 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

risks may lead to shall be obtained from the managing contractors, the Supervisor and team shall
property damage / contractor prior to taking any access or stop the activityand contact the HSE
injuries / accidents or working in any areas). Department for assistance
fatal incidents or
events
f. Faulty equipment Faulty equipment a. A pre inspection / test is to be 2 2 4 Site Supervisor /
may result in Faulty or damaged equipment to be Engineer /
conducted by the competent operator (LOW)
incidents / injuries / returned to the stores and tagged as Safety
to ensure the portable machine is in
damage to property inoperable.
good working order. Operator shall
/ accident events inspect the equipment insuring it has
been tagged with the monthly colour
coding tag. A pre usage inspection to
be conducted and recorded prior to
usage.
g. Failure to use PPE Failure to use PPE PPE compliance shall be adhered to by all 2 3 6 All employees shall comply with procedures Site Supervisor /
, may leave an employees. (MEDIUM) regarding PPE usage and handling.All tasks Engineer
employee exposed Sufficient training shall be communicated required PPE shall be used.
during activities,
to employees on PPE compliance and
which can result in
injuries usage.

h. Heavy objects Lifting equipment


No Johnson Controls employee shall be
9 Site Supervisor /
objects too heavy for a . Mechanical aid / manual aid to be used Engineer /
3 3 (MEDIUM) when the lift capacity precedes the 25Kg lift
person may lead to allowed to lift more than 25kg's per person. Safety
back and muscle Sufficient training shall be conducted on capacity per person.
strains Johnson Controls employees, make use of
correct lifting methods
a. Bulky equipment Lifting equipment / Supervisor and team to ensure bulky 2 2 4 Site Supervisor /
objects that poses Supervisor to ensure mechanical lifting Engineer
equipment are to be moved by more (LOW) equipment to beused where objects
discomfort whilst than one employee as far as
handling or moving, cannot be moved by two or more
reasonably practicable. employees.
may resultin injuries /
incidents / damage to
property / accident
events
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 5 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

b. Pinch and nip points Placing equipment on Supervisor and team; No equipment 2 4 8 Site Supervisor /
ground level or a level Visual inspection of load and placement Engineer /
shall be handled or placed where (MEDIUM) area, to identify any injury potential prior to
above shoulders with Safety
minimal or no visibility, there is zero visibility.A second placement or movement. By no means may
may result in injuries / assistant to help with load placement hands / body be placed under any load /
incidents / accident if no visualcan be maintained object whilst in suspension.
events
Workplace identification a. Sharp edges / objects Injuries sustained from Supervisor and team shall ensure; No 3 4 12 Site Supervisor /
2 person shall manually handle Piping / Full PPE compliance to be met by all
and Equipment Setup sharp edges located without the proper PPE usage / suitable (MEDIUM) Engineer
on plant / Piping and gloves to be used when handling and involved.
objects installation. By no means shall termination
gloves be used for Pipping installations.
Full PPE compliance to be met by all
involved.
b. Limited working space property damage /
Control maximum number of people 2 5 10 Site Supervisor /
injuries / accident a. Unauthorized workers are not Engineer /
working within the area (MEDIUM) allowed at the workplace
event Safety
b. Only required an essential tools
to be put in place
c. Pinch and nip points Placing equipment Supervisor and team; No equipment shall 2 5 10 Site Supervisor /
on ground level or be handled or placed where there is zero Visual inspection of load and placement Engineer /
(MEDIUM) area, to identify any injury potential prior
a level above visibility.A second Safety
shoulders with to placement or movement. By no means
minimal or no may hands / body be placed under any
visibility, may result load / object whilst in suspension.
in injuries /
d. Heavy objects (Manual Lifting equipment No Johnson Controls employee shall be 3 4 12 Site Supervisor /
Handling/Manual Pulling) objects too heavy allowed to lift more than 25kg's per a. Mechanical aid / manual aid to be Engineer
(MEDIUM) used when the lift capacity
for a person may person. Sufficient training shall be
lead to back and conducted on Johnson Controls precedes the 25Kg lift capacity per
muscle strains employees, make use of correct lifting person.
methods b. Ensure apply buddy system when lift
the heavy objects
c. Ensure correct body posture
e. Unhealthy postures Strain and sprains Supervisor / employees to ensure a safe 1 3 3 Site Supervisor /
due tounhealthy body posture is used when handling . Sufficient rest breaks to be taken during Engineer /
(LOW) activities, 15 min on and 5 min off
postures material and equipment Safety
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 6 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

f.Limited visibility (Blind Personnel injury To get approval with SDOB area owner 3 4 12 Site Supervisor /
spot/Night Activity) a.To have adequate lightings for night Activity Engineer /
(MEDIUM)
b. To establish proper communication tools Safety
eg. Walkie talkie
c. . Barricade and signage worksite area
d. Ensure close monitoring by site supervisor

Working At Height Falling from height due to Resulting into All worker must be briefed before start 4 4 16 Site Supervisor /
3. (WAH) work above ground/floor level personel injury work especially on safety aspect through (HIGH)
a.Workers must wear full body harness with Engineer /
more than 2meter briefing toolbox talk and HIRARC to be double lanyard, chin strap and ensure the Safety
explained to all workers. hook 100% tie off to the firm structure
properly.
b. Ensure workers aware the potential hazard
c. Don’t allow workers to use the incomplete
scaffold without green tag.
Slippery Platform/Structure Slip, Trip and Fall Every worker must completely attire the 4 4 16 Site Supervisor /
resulting into PPE, fully body harness with double Every workers to ensure to use proper safety Engineer /
(HIGH) shoes to avoid slippery
personnel injury lanyard shall be used and hooked at Safety
strong structure at all time.
Falling object/loose item Resulting into To barricade the working area during 2 5 10 Site Supervisor /
serious injury erection an adequate signages. a.Tools and material shall be kept in the Engineer /
(MEDIUM) proper container. Safety
b. Work area shall be free from loose/un-used
materials.
Limited visibility (Blind Personnel injury To get approval with SDOB area owner 3 4 12 Site Supervisor /
spot/Night Activity) a.To have adequate lightings for night Activity Engineer /
(MEDIUM)
b. To establish proper communication tools Safety
eg. Walkie talkie
c. . Barricade and signage worksite area
d. Ensure close monitoring by site supervisor
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 7 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Mobilization of Wrong/defection material a. Collapse of Material a. Safety Briefing by supervisor / work 1 2 2 Site Supervisor /
4. manpower and material b. Personnel Injury leader before start work (LOW) a.) To check all material and to confirm that Engineer /
to site it's safe to be used. Safety
b.) Scaffold materials must not been exposed
to oil, paints, etc

Road accident a. Machinery topples a.Strictly to follow MRCSB speed limits 15 2 4 8 Site Supervisor /
b. Machinery / km/h a.) Identify the specific route to be used and Engineer /
(MEDIUM) location park.
Property damage Safety
c. Hit by moving b.) Vehicle to be inspected and confirm that
machinery it’s safe to be used
Fatality / Serious
body injury c.) Driver must have valid driving license and
fit to work.
Crictical Lifting Activity a.) Uneven surface / ground Machinery collapse Only competent operator allowed to 4 5 20 a.Identifyproper inspection area Site Supervisor /
5. (Mobilize Materials, Property damage operate machinery (HIGH) b. Clear any obstruction Engineer /
Equipment & etc.) c.Compact uneven ground Safety
d.Competent machinery operator
e.Banksman to assist movement of
machinery.
b.) Crane and lifting gears Falling Load & All lifting gears/equipments must have test 3 4 12 Site Supervisor /
failures Property Damage certificate and marking with inspection Every crane must have a valid PMA Engineer /
(MEDIUM) Certificate
tagging Safety

Site Supervisor /
To replace defect lifting gear with a new Engineer /
and remove the defect item from site Safety
Site Supervisor /
Check chains,shackles,hooks and rings for Engineer /
cracks,corrosion and wear and tear Safety

Site Supervisor /
Do not exceeding the safe working load Engineer /
limit (SWL ) when lifting Safety
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 8 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

c.) Wrong rigging method Slipping Materials & 2 5 10 Site Supervisor /


resulting into personel injury Falling Object Barricade and signage working area (white Engineer /
(MEDIUM) red tape) Safety

Site Supervisor /
To refer load chart before doing lifting Engineer /
Safety
Site Supervisor /
Load must not left unattended Engineer /
Safety
Site Supervisor /
Prevent workers from working / passing by Engineer /
under the suspended load Safety

Site Supervisor /
Signal man must control the lifting activity Engineer /
Safety
d.) Bad Weather a.) Collapse Supervisor / employees to ensure weather 3 4 12 Site Supervisor /
b.) Falling Object condition Stop work during heavy rain, strong winds Engineer /
(MEDIUM) and thunderstorm
c.) Personnel Injury Safety
Site Supervisor /
Crane operator shall lower down the boom Engineer /
before left Safety
Erection, a.) Incompetent scaffolder a.) personnel Injury All workers must be briefed before start 4 3 12 Site Supervisor /
6. Modification and and erection obstruct b.) Property work especially on safety aspect through (MEDIUM)
Conduct Pre Job Briefing before start Engineer /
Damage briefing toolbox talk and HIRARC to be work. Safety
Dismantle safety equipment or
explained to all worker.
Scaffolding access

Site Supervisor /
Competent scaffold certificate to be Engineer /
attached during on going activity and Safety
competent scaffold only allowed to erect
scaffolding.
Site Supervisor /
Do not obstruct any emergency safety Engineer /
equipment, assembly area and access Safety
(walkway, monkey ladder, fire hose,
manhole etc)
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 9 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Falling object/loose item Personnel Injury To barricade the working area during 3 4 12 Site Supervisor /
erection an adequate signages. Work area shall be free from loose/un- Engineer /
(MEDIUM) used materials. Safety
Site Supervisor /
Install Safety net surrounding work area to Engineer /
prevent from falling of equipment (if Safety
applicable)
Site Supervisor /
Tools and material shall be kept in the Engineer /
proper container. Safety
Falling from heights Major Injury / To carry out close supervision by person 4 5 20 Site Supervisor /
Fatality in charge. Erector must wear full body harness with Engineer /
(HIGH) double lanyard, chin strap and ensure the Safety
hook 100% tie off to the firm structure
properly.
Site Supervisor /
Ensure workers aware the potential Engineer /
hazard (push button/tempting of Safety
equipment/valve/cable, etc)
Site Supervisor /
To barricade the area and warning Engineer /
signage. Safety
Site Supervisor /
Scaffolding frame above 15m (need PE Engineer /
design) endorsed, tubular above 40m Safety
(need PE design) endorsed.
Site Supervisor /
Ensure all workers using scaffolding for Engineer /
working at height attend WAH training. Safety
Site Supervisor /
Three-point contact when climb singgle Engineer /
ladder Safety
People using incomplete Personnel Injury To carry out close supervision by person 4 3 12 Site Supervisor /
in charge. Display the red tag on the unsafe Engineer /
scaffolding (MEDIUM) scaffolding or under construction/ Safety
incomplete scaffold.
Site Supervisor /
Don’t allow workers to use the incomplete Engineer /
scaffold without green tag. Safety
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 10 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Scaffold collapse a.) Major Injury Site Supervisor / Person in charge to 4 4 16 Site Supervisor /
7. b.) Property ensure inspect scaffolding materials are in (HIGH)
To provide stable/solid scaffolding Engineer /
Damage good condition prior to start work foundation. Safety

Site Supervisor /
The ground stability need to be checked Engineer /
prior to erection. Safety
Falling of unknown Personnel Injury Site Supervisor / Person in charge to 4 3 12 Erection of material in accordance to the Site Supervisor /
Material (defect structure ensure inspect scaffolding materials are in (MEDIUM) safety procedure. Engineer /
etc) good condition prior to start work Safety

Site Supervisor /
Safety personal/work leader to observe Engineer /
surrounding work area while erection Safety
Slips, Trip and falling Personnel Injury All workers must be briefed before start 3 5 15 Site Supervisor /
work especially on safety aspect through Every scaffolder must completely attired Engineer /
(HIGH) the PPE. Fully body harness with double
briefing toolbox talk and HIRARC to be Safety
explained to all worker. lanyard shall be used and hooked at
strong structure at all time.
Site Supervisor /
Scaffold team to ensure to use proper Engineer /
safety shoes to avoid slippery. Safety
Inspection Scaffold not follow a.) Major Injury Competent person to ensure follow the job 4 3 12 Site Supervisor /
8. procedure b.) Property instruction (MEDIUM)
Scaffold has re-inspected and confirmed Engineer /
Damage safe to be used. Inspector Scaffold
/Safety
Site Supervisor /
Scaffolding Inspector must ensure the Engineer /
platform is safe and green tag displayed. Inspector Scaffold
/Safety
ECOSCIENCE MANUFACTURING & ENGINEERING SDN BHD Doc No: EME/HIRARC/APM/01
Rev: 0
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL Page 11 of 9
PRE-TREATMENT PLANT, BIODIESEL TRANSESTERIFICATION PLANT, TANK FARM, BOILERS, TRANSFORMER/MSB ROOM, WEIGHBRIDGE
PROJECT TITLE OFFICE & PLATFORM, CANTEEN, GUARD HOUSE, STORE AND OTHER ANCILLARY BUILDINGS IN RELATION TO TARGARYEN PROJECT AT SIME
DARBY OILS BIODIESEL SDN. BHD.
Task/ Job
Description
Scaffolding Erection, Modification and Dismantling HIRARC No HIRARC R0 (Rev: 0.0) Date 05.10.2023

PIC
WHICH CAN LIKELIHOOD SEVERITY RISK
No WORK ACTIVITY EXISTING RISK CONTROL (IF ANY) RECOMMEND CONTROLS MEASURES (DUE DATE /
HAZARD CAUSE/EFFECT RATING
STATUS)

Housekeeping Slipping and tripping Slipping and


Responsible Supervisor and team shall 1 3 3 Site Supervisor /
9. tripping over (LOW)
Housekeeping will be conducted during Engineer /
objects may lead to ensure that the work area is maintained tasks by al involved, and not at the end of Safety
injuries / accidents and kept free and clear of rubble at all the task or shift
and incidents times. Employees shall ensure their work
area is neat and clear of superfluous
materials at all times.