Department of Public Works and Highways
Contract ID 23AA0499
Contract Name : CONSTRUCTION OF FLOOD CONTROL
STRUCTURE ALONG BURAYOC RIVER,
PAGUDPUD, ILOCOS NORTE
Location of the Contract : PAGUDPUD, ILOCOS NORTE
DPWH - ILOCOS NORTE 1ST DISTRICT ENGINEERING OFFICE
CCavit, Laoag City, locos Norte
‘October 5, 2023
SUPPLEMENTAL BULLETIN NO. 23-0499
Subject : Resumption of Submission and Opening of Bids
This Supplemental Bulletin No. 23-0499 is issued to amend provisions in the Bidding
Documents (BDs) for the above stated Contract.
Contract Duration
— Original Contract Duration Final Revised Contract Duration _
103 C.D. 83. C.D.
_ Approved Budget for the Contract
Original ABC Final Revised ABC _
Php 9,603,923.31 Php 9,603,866.51
Submission and Opening of Bids of the above stated project will resume on October 12,
2023 at 10:00 A.M.
Attached herewith is the Revised Bill of Quantities, ABC and Contract Duration.
This Supplemental Bulletin shall form an integral part of the said Bidding Documents.
Forthie guidance and information of all concerned.
/ \
yy :
GLENN C. MIGUEL
District Engineer23AA0499
OLD ABC ~ PHP 9,603,923.31
NEW ABC ~ PHP 9,603,866.51
OLD Project Duration- 103 CD
NEW Project Duration- 83 CD
BILL OF QUANTITIES
Part No. Part Description:
Pay Item i , Amount
teas Desc! Unit | Quantity ‘Pese)
a) Q) @G) (4) (6)
PART A ‘ACILITIES FOR THE ENGINEER
Tn words: Pesos in figures:
Provision of Field Office Php.
AIAG) For The Engineer mo. 27 |__| -
(Rental Basis) In figures:
Php. =
Tn words: Pesos Tn ieures:
Operation and Php
A1.1(16) | Maintenance of Field | mo. 27 |__| -
Office for the Engineer Th figures:
Php
TOTAL OF PART A. Php.
PARTB | OTHER GENERAL REQUIREMENTS
Ta words: Pesos Tn figures:
Php.
Project Billboard/ -
BS Seiad exch [3.00 ie ——
Php,
Tn words: Pesos Ta figures:
Php
Occupational Safety -
BA) | and Health Program = | | 2-77 Thfigues
Pho.
Tn words: Pesos Ta figures
Mobilization/ | ere
obilizati
B9 | Demobilization ts [00 ime
Php_23AA0499
OLD ABC ~ PHP 9,603,923.31
‘NEW ABC — PHP 9,603,866.51
OLD Project Duration- 103 CD
‘NEW Project Duration- 83 CD.
Tn words: Pesos Tn figures:
Php.
Detour/ Access -
B.IS(1) | Road Ls. 1.00 a
Php
TOTAL OF PART B Php,
PARTL-A | EARTHWORK
Ta words: Pesos Tn figures:
| Pp.
1700(1) | Clearing and Grubbing | Sqm. | 444.00 a
Tn figures:
Php.
rr Tn words: Pesos | In figures:
ean
rrogcye | Embankment From | Guin | 799.20 a
Borrow) Satgues
Php. .
TOTAL OF PART L-A Php,
PARTL-B | BANK AND SLOPE PROTECTION WORKS
Tn words: Pesos Th figures:
i . Php.
soacna | Ree | Ke | tsor4o |__| -
Tn figures:
Structural Concrete | Php.
405(1)a3 (20.68 Mpa, Class A, | Cum, 47.70 -
28 days)
” ~~ [Tn words: Pesos: In figures:
Hand-Laid Rock ae
Jand-Laid Rod
508(1) Embankment Cum. 261.20 -
Tn figures:
Php.234.0499
OLD ABC ~ PHP 9,603,923.31
‘NEW ABC — PHP 9,603,866.51
OLD Project Duration- 103 CD
NEW Project Duration- 83 CD
Tn words Pesos Tn figares:
Php.
202.30 -
1x1) Rubble Conerete 0 Gigne
Php__
Tr words: Pesos Tn figures
Structural Stee! Sheet Php
Structural |
171666) Pe peritied m. | 1,665.00 :
Tn figures
- Php.
+P In words: Pesos in figures:
Php____
1716¢12) | Structural Steel Sheet | 1,665.00 |__| =
Piles, driven niga
Php.
TOTAL OF PART L-B Php.
Grand Total Php
Submitted by:
‘Name and signature of Bidder’s Representative Date:
Position
Name of Bidder