You are on page 1of 4
Department of Public Works and Highways Contract ID 23AA0499 Contract Name : CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BURAYOC RIVER, PAGUDPUD, ILOCOS NORTE Location of the Contract : PAGUDPUD, ILOCOS NORTE DPWH - ILOCOS NORTE 1ST DISTRICT ENGINEERING OFFICE CCavit, Laoag City, locos Norte ‘October 5, 2023 SUPPLEMENTAL BULLETIN NO. 23-0499 Subject : Resumption of Submission and Opening of Bids This Supplemental Bulletin No. 23-0499 is issued to amend provisions in the Bidding Documents (BDs) for the above stated Contract. Contract Duration — Original Contract Duration Final Revised Contract Duration _ 103 C.D. 83. C.D. _ Approved Budget for the Contract Original ABC Final Revised ABC _ Php 9,603,923.31 Php 9,603,866.51 Submission and Opening of Bids of the above stated project will resume on October 12, 2023 at 10:00 A.M. Attached herewith is the Revised Bill of Quantities, ABC and Contract Duration. This Supplemental Bulletin shall form an integral part of the said Bidding Documents. Forthie guidance and information of all concerned. / \ yy : GLENN C. MIGUEL District Engineer 23AA0499 OLD ABC ~ PHP 9,603,923.31 NEW ABC ~ PHP 9,603,866.51 OLD Project Duration- 103 CD NEW Project Duration- 83 CD BILL OF QUANTITIES Part No. Part Description: Pay Item i , Amount teas Desc! Unit | Quantity ‘Pese) a) Q) @G) (4) (6) PART A ‘ACILITIES FOR THE ENGINEER Tn words: Pesos in figures: Provision of Field Office Php. AIAG) For The Engineer mo. 27 |__| - (Rental Basis) In figures: Php. = Tn words: Pesos Tn ieures: Operation and Php A1.1(16) | Maintenance of Field | mo. 27 |__| - Office for the Engineer Th figures: Php TOTAL OF PART A. Php. PARTB | OTHER GENERAL REQUIREMENTS Ta words: Pesos Tn figures: Php. Project Billboard/ - BS Seiad exch [3.00 ie —— Php, Tn words: Pesos Ta figures: Php Occupational Safety - BA) | and Health Program = | | 2-77 Thfigues Pho. Tn words: Pesos Ta figures Mobilization/ | ere obilizati B9 | Demobilization ts [00 ime Php_ 23AA0499 OLD ABC ~ PHP 9,603,923.31 ‘NEW ABC — PHP 9,603,866.51 OLD Project Duration- 103 CD ‘NEW Project Duration- 83 CD. Tn words: Pesos Tn figures: Php. Detour/ Access - B.IS(1) | Road Ls. 1.00 a Php TOTAL OF PART B Php, PARTL-A | EARTHWORK Ta words: Pesos Tn figures: | Pp. 1700(1) | Clearing and Grubbing | Sqm. | 444.00 a Tn figures: Php. rr Tn words: Pesos | In figures: ean rrogcye | Embankment From | Guin | 799.20 a Borrow) Satgues Php. . TOTAL OF PART L-A Php, PARTL-B | BANK AND SLOPE PROTECTION WORKS Tn words: Pesos Th figures: i . Php. soacna | Ree | Ke | tsor4o |__| - Tn figures: Structural Concrete | Php. 405(1)a3 (20.68 Mpa, Class A, | Cum, 47.70 - 28 days) ” ~~ [Tn words: Pesos: In figures: Hand-Laid Rock ae Jand-Laid Rod 508(1) Embankment Cum. 261.20 - Tn figures: Php. 234.0499 OLD ABC ~ PHP 9,603,923.31 ‘NEW ABC — PHP 9,603,866.51 OLD Project Duration- 103 CD NEW Project Duration- 83 CD Tn words Pesos Tn figares: Php. 202.30 - 1x1) Rubble Conerete 0 Gigne Php__ Tr words: Pesos Tn figures Structural Stee! Sheet Php Structural | 171666) Pe peritied m. | 1,665.00 : Tn figures - Php. +P In words: Pesos in figures: Php____ 1716¢12) | Structural Steel Sheet | 1,665.00 |__| = Piles, driven niga Php. TOTAL OF PART L-B Php. Grand Total Php Submitted by: ‘Name and signature of Bidder’s Representative Date: Position Name of Bidder

You might also like