Contract ID 23AA0508
Contract Name
Department of Public Works and Highways
IMPROVEMENT OF ROAD ALONG MANILA
NORTH ROAD, BACARRA SECTION, BACARRA,
ILOCOS NORTE
Location of the Contract
BACARRA, ILOCOS NORTE
DPWH - ILOCOS NORTE 1ST DISTRICT ENGINEERING OFFICE
Cavit, Laoag Cty, cos Norte
October 5, 2023
SUPPLEMENTAL BULLETIN NO. 23-0508.1
‘Subject
: Resumption of Submission and Opening of Bids
This Supplemental Bulletin No. 23-0508.1 is issued to amend provisions in the Bidding
Documents (BDs) for the above stated Contract.
Contract Duration
Original Contract Duration
Final Revised Contract Duration
168 C.D.
140 C.D.
Original Major Category of Work
TEMS - Traffic Engineering and Management System
(including Road Safety Devices)
‘Similar Category of Works: TEG, TEP, TEP-P, TEP-S,
Major Category of Work
l TES & TEA
Revised Major Category of Work
RM - Roads: Maintenance
Similar Category of Works: RCA, RCP, RRA, RRP,
‘MRE, ROG & RRG
Original ABC
Php 51,302,996.69
_ Approved Budget for the Contract
Final Revised ABC |
Php 51,302,995.58
‘Submission and Opening of Bids of the above stated project will resume on October 12,
2023 at 10:00 A.M.
Attached herewith is the Revised Bill of Quantities, ABC, Category of Work and Contract
Duration.
This Supplemental Bulletin shall form an integral part of the said Bidding Documents.
Forthe guidance and information of all concerned.
/
Jerry
GLENN ¢. ree
District Engineer23AA0508
OLD ABC - 51,302,996.69
NEW ABC ~ 51,302,995.58
OLD Project Category- TEMS
NEW Project Category-RM
OLD Contract Duration- 168 CD
NEW Contract Duration- 140 CD
BILL OF QUANTITIES
Part No. Part Description:
Pay Item 7" | , Unit Price Amount
ae Description Unit | Quantity (Pesos) (Pesos)
a) Q) G3) (4) G) (6)
PART A _| FACILITIES FOR THE ENGINEER
In words: Pesos In figures:
Provision of Field Office Php,
ALL.) For The Engineer mo. 4.67 -
(Rental) In figure
Php.
In words: Pesos In figures:
Operation and Php.
1.1016) | Maintenance of Field | Mo. 4.67 -
Office for the Engineer In figures
Php
TOTAL OF PART A Php.
PARTB | OTHER GENERAL REQUIREMENTS
Tn words: Pesos, Tn figures:
Php.
Project,
BS o . ea. 3.00 7
Billboard/Signboard in figures
Php.
Tn words: Pesos Tn figures:
Php.
Occupational Safety and -
B.7(
) Health Le 467 | in figures:
Php.23AA0508
OLD ABC - 51,302,996.69
NEW ABC - 51,302,995.58
OLD Project Category- TEMS
NEW Project Category-RM
OLD Contract Duration- 168 CD
NEW Contract Duration- 140 CD
In words: Pesos In figures:
Php__
B.&(I) Traffic Management Mo. 467 -
In figures:
Php.
Tn words: Pesos Tn figures:
Php.
Mobilization’ ;
a Demobilization Is 1:00 | In Figures
Php.
TOTAL OF PARTB Php_
PARTC | EARTHWORKS
Tn words: Pesos Tn figures:
Php.
Structure Excavation 7
103(1)a (Common Soil) cum. 471,00 infigures
Php.
TOTAL OF PART C Php.
PARTH | MISCELLANEOUS STRUCTURES
Tn words: Pesos Tn figures:
Php.
Reinforcing Steel (Grade -
4
04(1)a fF ke | 1600092 | a
Php.
Tn words: Pesos Th figures:
Php.
Structural Concrete _
405(1}93 | (20.68 Mpa, Class A, 28 | cum. | 17593 | REE
days) Php23AA0508
OLD ABC - 51,302,996.69
NEW ABC - 51,302,995.58
OLD Project Category- TEMS
NEW Project Category-RM
OLD Contract Duration- 168 CD
NEW Contract Duration- 140 CD
In words: Pesos: In figures:
Php.
Reflectorized 1,635.00 -
612(1) | Thermoplastic Pavement | Sqm, Infigures:
Markings White Php,
Tn words: Pesos Tn figures:
Reflectorized Php.
6122) | Thermoplastic Pavement | Sqm. | 94.05 gs
Markings Yellow In figures:
Tn figures:
Php.
624(11) Roadway Lighting Ls. 1.00 =
in figures
Php,
TOTAL OF PART H Php.
Grand Total Php.
Submitted by:
“Name and signature of Bidder’s Representative Date:
Position
Name of Bidder