You are on page 1of 4
Contract ID 23AA0508 Contract Name Department of Public Works and Highways IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE Location of the Contract BACARRA, ILOCOS NORTE DPWH - ILOCOS NORTE 1ST DISTRICT ENGINEERING OFFICE Cavit, Laoag Cty, cos Norte October 5, 2023 SUPPLEMENTAL BULLETIN NO. 23-0508.1 ‘Subject : Resumption of Submission and Opening of Bids This Supplemental Bulletin No. 23-0508.1 is issued to amend provisions in the Bidding Documents (BDs) for the above stated Contract. Contract Duration Original Contract Duration Final Revised Contract Duration 168 C.D. 140 C.D. Original Major Category of Work TEMS - Traffic Engineering and Management System (including Road Safety Devices) ‘Similar Category of Works: TEG, TEP, TEP-P, TEP-S, Major Category of Work l TES & TEA Revised Major Category of Work RM - Roads: Maintenance Similar Category of Works: RCA, RCP, RRA, RRP, ‘MRE, ROG & RRG Original ABC Php 51,302,996.69 _ Approved Budget for the Contract Final Revised ABC | Php 51,302,995.58 ‘Submission and Opening of Bids of the above stated project will resume on October 12, 2023 at 10:00 A.M. Attached herewith is the Revised Bill of Quantities, ABC, Category of Work and Contract Duration. This Supplemental Bulletin shall form an integral part of the said Bidding Documents. Forthe guidance and information of all concerned. / Jerry GLENN ¢. ree District Engineer 23AA0508 OLD ABC - 51,302,996.69 NEW ABC ~ 51,302,995.58 OLD Project Category- TEMS NEW Project Category-RM OLD Contract Duration- 168 CD NEW Contract Duration- 140 CD BILL OF QUANTITIES Part No. Part Description: Pay Item 7" | , Unit Price Amount ae Description Unit | Quantity (Pesos) (Pesos) a) Q) G3) (4) G) (6) PART A _| FACILITIES FOR THE ENGINEER In words: Pesos In figures: Provision of Field Office Php, ALL.) For The Engineer mo. 4.67 - (Rental) In figure Php. In words: Pesos In figures: Operation and Php. 1.1016) | Maintenance of Field | Mo. 4.67 - Office for the Engineer In figures Php TOTAL OF PART A Php. PARTB | OTHER GENERAL REQUIREMENTS Tn words: Pesos, Tn figures: Php. Project, BS o . ea. 3.00 7 Billboard/Signboard in figures Php. Tn words: Pesos Tn figures: Php. Occupational Safety and - B.7( ) Health Le 467 | in figures: Php. 23AA0508 OLD ABC - 51,302,996.69 NEW ABC - 51,302,995.58 OLD Project Category- TEMS NEW Project Category-RM OLD Contract Duration- 168 CD NEW Contract Duration- 140 CD In words: Pesos In figures: Php__ B.&(I) Traffic Management Mo. 467 - In figures: Php. Tn words: Pesos Tn figures: Php. Mobilization’ ; a Demobilization Is 1:00 | In Figures Php. TOTAL OF PARTB Php_ PARTC | EARTHWORKS Tn words: Pesos Tn figures: Php. Structure Excavation 7 103(1)a (Common Soil) cum. 471,00 infigures Php. TOTAL OF PART C Php. PARTH | MISCELLANEOUS STRUCTURES Tn words: Pesos Tn figures: Php. Reinforcing Steel (Grade - 4 04(1)a fF ke | 1600092 | a Php. Tn words: Pesos Th figures: Php. Structural Concrete _ 405(1}93 | (20.68 Mpa, Class A, 28 | cum. | 17593 | REE days) Php 23AA0508 OLD ABC - 51,302,996.69 NEW ABC - 51,302,995.58 OLD Project Category- TEMS NEW Project Category-RM OLD Contract Duration- 168 CD NEW Contract Duration- 140 CD In words: Pesos: In figures: Php. Reflectorized 1,635.00 - 612(1) | Thermoplastic Pavement | Sqm, Infigures: Markings White Php, Tn words: Pesos Tn figures: Reflectorized Php. 6122) | Thermoplastic Pavement | Sqm. | 94.05 gs Markings Yellow In figures: Tn figures: Php. 624(11) Roadway Lighting Ls. 1.00 = in figures Php, TOTAL OF PART H Php. Grand Total Php. Submitted by: “Name and signature of Bidder’s Representative Date: Position Name of Bidder

You might also like