0% found this document useful (0 votes)
18 views1 page

Injection Mold Draft Schedule

This schedule outlines the process for designing, machining, and testing molds for a part called the JUSHI NUT HNTE 6 from August 31st to November 3rd. It includes steps like designing the mold, ordering materials, machining, matching the mold, and conducting trials with mold makers and PT Imai to submit sample data.

Uploaded by

mangdayut20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Injection Mold Draft Schedule

This schedule outlines the process for designing, machining, and testing molds for a part called the JUSHI NUT HNTE 6 from August 31st to November 3rd. It includes steps like designing the mold, ordering materials, machining, matching the mold, and conducting trials with mold makers and PT Imai to submit sample data.

Uploaded by

mangdayut20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Schedule of Ju 31-Aug-22

MODEL JUSHI NUT HNTE 6


Part Name INJECTION MOLD
Date 2022 Day
0 Confirm Order/ PURCHASE ORDER & FINAL 3D MODELING
31-Aug Wed 1 Desain Mold
1-Sep Thu 2
2-Sep Fri 3
3-Sep Sat 4
4-Sep Sun 5
5-Sep Mon 6
6-Sep Tue 7
7-Sep Wed 8
8-Sep Thu 9 Order Material
9-Sep Fri 10
10-Sep Sat 11
11-Sep Sun 12
12-Sep Mon 13
Request Insert Nut
13-Sep Tue 14 Qty 100 Pcs
14-Sep Wed 15
15-Sep Thu 16 Machining
16-Sep Fri 17
17-Sep Sat 18
18-Sep Sun 19
19-Sep Mon 20
20-Sep Tue 21
21-Sep Wed 22
22-Sep Thu 23
23-Sep Fri 24
24-Sep Sat 25
25-Sep Sun 26
26-Sep Mon 27
27-Sep Tue 28
28-Sep Wed 29
29-Sep Thu 30
30-Sep Fri 31
1-Oct Sat 32
2-Oct Sun 33
3-Oct Mon 34
4-Oct Tue 35 Matching Mold
5-Oct Wed 36
6-Oct Thu 37 First Trial (T0) Mold Maker
7-Oct Fri 38
8-Oct Sat 39
9-Oct Sun 40
10-Oct Mon 41 Submit Sample & Measurement data T0
11-Oct Tue 42
12-Oct Wed 43
13-Oct Thu 44
14-Oct Fri 45
15-Oct Sat 46
16-Oct Sun 47
17-Oct Mon 48 First Trial (T1) PT Imai
18-Oct Tue 49
19-Oct Wed 50 Submit Sample & Measurement data T1
20-Oct Thu 51
21-Oct Fri 52
22-Oct Sat 53
23-Oct Sun 54
24-Oct Mon 55
25-Oct Tue 56
26-Oct Wed 57 First Trial (T2)
27-Oct Thu 58
28-Oct Fri 59 Submit Sample & Measurement data T2
29-Oct Sat 60
30-Oct Sun 61
31-Oct Mon 62
1-Nov Tue 63
2-Nov Wed 64
3-Nov 65

You might also like