WELDING PROCEDURE SPECIFICATION
NO. 001/CDW/WPS/VII/21
&
PROCEDURE QUALIFICATION RECORD
NO. 001/CDW/PQR/VII/21
STANDARD AND CODE
ASME IX EDITION 2018
PT. Cipta Duta Wacana
Beltway Office Park Tower B Lantai, JI. Letjen TB Simatupang No. 41
Ragunan, Pasar Minggu, Jakarta Selatan 12550, Indonesia
Telephone : +62-21 29857462; +62-21 29084991; +62-21.29215392, F. +62-21.29857201
www.cdw-engineering.com email: info@cdw-engineering.comWELDING PROCEDURE SPECIFICATION
NO. 001/CDW/WPS/VII/21Cow
ENGINEERING
WELDING PROCEDURE SPECIFICATION (WPS)
Section IX ASME - 2018 Editon
Welding Procedure Spectcaton No. :_OO1/CDWMWESIVIN24 RevisionNo.: 0 Date:__July, 2024
Welding Proce SMAW Type: ___ Manual
Supporting POR No(s) 00v/CDW/PARIVIN24
JOINTS (QW-402)
Joint Design __Single Veo Backing __NA
Backing Material (Type) NIA Retainer NA
‘Joint Detail:
a
y Pipe Carbon Steel - ASTM A 98
— Tmt
ae
—
Base Metal (QW-403)
P-No, 1 Group No. 4 to P-No. 4 Group No, 1 OR
‘Mat! Specification Carbon Stee! ASTM A 36
‘Thickness range
Base Metal Groove,mm — 2=14 Fillet, mm NA
Pipe Diameter Range :
1 Groove,mm N/A Fillet, mm NA
Other ~
Nomor Registrasi tigas (=
PT. Cipta Duta Wacana “are
Beltway Ofice Park Tower B Lanta 5 Letjen TB Simatupang No. 41 LEOX ~ B= 9190 /o86-1/ doe)
Ragunan, Pasar Minggu, Jakarta Selatan 12550, indonesia
Telephone : +62-21 29857462; +62-21 29084991; +62-21,29215392. F, 462-21.29857201
wwow.cdw-engineering.com email: info@cdw-engineering.comCow
ENGINEERING
Filler Metais (QW-404)
Electrode Lp 52-1
Spec. No. (SFA)
AWS No, (Class)
F-No/ANo.
Filler metal 2, mm
‘Weld metal thickness range, Groove, mm 14mm (Max) j
Fillet, mm WA
.GTAW, Filler metal product form NA Consumables Insert NA
For SAW, Flux class NA ‘Alloy element NA
Flux trade name NA Flux type NA
Alloy ux NA Recrushed slag NA
Suppl. Filer metal NA
Other.
Position (QW-405) Post Weld Heat Treatment (QW-407)
Position(s) of groove 6c Temperature range, °C NA
Welding progression ALL POSITION Time range hour min
Position(s) of filet NA
Preheat (QW-406) Gas (QW-408)
Preheat temp. min., °C N/A For GTAW | Gas(es) | %Mixturer | Flow rate
Intorpass temp. mas, % NA Shielding
Preheat maintenance NIA Traling
Backing
Electrical Characteristics (QW-408)
Current AC or DC AC. Polarity Ac
‘Amps (range) Max 7o -110 Volt (range) Max 15-35
Tungsten electrode size and type_N/A Pulsing current (GTAW) NA
Mode of metal transfer for GMAW _N/A Electrode wire feed speed range N/A
PT. Cipta Duta Wacana
Beltway Office Park Tower B Lantai 5, Jl. Letjen TB Simatupang No. 41
Ragunan, Pasar Minggu, Jakarta Selatan 12550, Indonesiacows
ENGINEERING
Techniques (QW-410)
String or weave bead STRING & WEAVE BEAD Orifice, cup or nozze size NA
Initial and inter pass clean GRINDING AND BRUSHING
Method of back gouging
Oscilation NA ‘Contact tube to work distance NA
Muttiple or single pass (per side) _ MULTIPLE:
Closed to out chamber NA
Muttiple or single electrodes SINGLE Electrode spacing NA
‘Travel speed range 8 CM-12.CM/ MINUTE
Peening N/A
Other NA
Waa | Presess Filo metal Curent Vai Range | Travel Speed] Heat inpat
Layers) Glass | 2, mm | Type polary | Amp Range en min Kym
= ‘SMAW | ETOI8 | 26 aC 70-80 | 16-25 076-0.84
z SMAW | ETO | 26 AC 75-80 | 20-30 7204.50
x ‘SMAW | E7018 | 26 Ae 0-90 | 20-38 | 70.78 | 128A70
Testing Requirements :
4. Visual Inspection
2. Raciography Test
3. Tensile: 2
4. Root Bond : 2
5. Face Bend : 2
PT. CIPTA DUTA WACANA, MIGAS
ENGINEERING
(GECEP TRIHARDIYANTO
Director
PT. Cipta Duta Wacana
Beltway Office Park Tower B Lanta 5, JI. Letjen TB Simatupang No. 41
Ragunan, Pasar Minggu, Jakarta Selatan 12550, Indonesia
Telephone : +62-21 29857462; +62-21 29084991; +62-21.29215392. F. +62-21.29857201
www.cdw-engineering.com email : info@cdw-engineering.comBERITA ACARA
PENGUJIAN WPS / PQR STANDARD ASME IX
‘Sehubungan dengan surat Direktur Teknik dan Lingkungan Migas No. : B-7190/MG.06/DMT/2021
tanggal 16 Juli 2021, Pada hari ini tanggal 22 Juli 2021 telah selesai dilaksanakan pengujian WPS /
PAR yang bertempat di workshop PT. CIPTA DUTA WACANA sebanyak 1 buah mengacu pada
Standard ASME IX 2018 Edition dengan :
1. NoWPS
2. No. POR
:001/CDW/WPS/Vil/21
001/CDW/POR/VII/21
Pengujian WPS / PQR dilakukan dengan metode :
A. UjiVisual
B. Uji Radiography
C. Mechanical Test (Test Tarik dan Test Lengkung)
Hasil dari pelaksanaan Pengujian WPS / POR sebagai berikut :
‘Standar Acuan Jumiah
Lulus Visual | Lulus Radiography
ulus Mechanical
‘ASME Section IX Tbuah
2018
‘Tbuah ibuah
6 buah test coupon
Terlampir laporan hasil :
1. Pengujian kualifiksi prosedur / juru las / operator las
2. Radiography Test
3. Mechanical Test
Demikian berita acara ini di buat untuk dapat di pergubnakan sebagai mana mestinya
INSTANSI
NAMA
PT. CIPTA DUTA WACANA,
‘CECEP TRI HARDIYANTO \
DITIEN MIGAS
AM Ranmawan