You are on page 1of 4
PT. KOMIPO PEMBANGKITAN JAWA BALI [D0c. Ref K}6-0951-02 PLTU TANJUNG JATI B UNIT 384 Form Wo, KPIB-0951-02-22-FH16 Design Dw. | Finance and Aaministration ‘TERM OF REFERENCE Revigon No. |: 00 Background The spare parts will be provided to equipment as follow: Name — : FA Conveying Air Compressor Motor A, B, C Brand: Atlas Copco Spare Part Data 2.1, System : Desalination System 2.2. Equipment : Motor 2.3. Spare Part Group : Coverhaut CPM & pam Run to Failure Cistrategic Parts Cistrategic Equipment 2.4, Usage Plan : The motor will be used as a spare part. 2.5. Description : FA Conveying Air Compressor Motor Refurbish 2.6. WO No 33289 Work Scope aun 3.2. 33; 3.4, Provide work schedule & record initial data before ~ after a. Mob and de-mobilization and insurance (with proper handling include loading and unloading all tools, spare parts, include certified crane operator) by third Party b. Record initial and final data at KPJB site and at Workshop: IR, PI, winding resistance, RTD and TC, space heater. c. Disassembly the motor and pull out the rotor for detailed inspection. d. Cleaning the stator and rotor by proper method (Steam / Electrical cleaner) Rotor a. Shaft Clearance, Penetrant Test (PT) b. Magnetic check, Growler test, Ring Flux. }- c. Run out and balancing. d. Check rotor parts by visual, such as: short ring, retainer ring, rotor bar, rotor core, rotor core retainer ring. NOTE: in case of abnormal found, third party must repair it by using proper method, with no additional cost e. Bearing replacement, bearing and grease provided by KPJB. DE: 6319C3 NDE: 6319C3 VLO241 INSOCOAT Grease : Shell Alvania RL3 ‘Stator a. Surge test, Wedges check and tightening b. Stator lead connection check, Motor terminal connection check (bushing insulator), RTD, PT100, Heater test (winding and bearing) c. Winding Resistance check, PI check (refer to IEEE 43-2000 : minimal 1,5 - 2.0), IR check (refer to IEEE 522 : use 500V) d. Re-varnish and oven backing e. Cooling fan Inspection, replace if needed f. Clearance bearing housing DE and NDE check and re-bushing, bearing housing NDT check (PT and UV check) Conduct solo run test (no load test), by using new bearings installed, for 1 (one) hour, and record final data for motor performance, consist of: a. Voltage and current of each phase Term of Reference = Tof4 9 { stat | ender | thaver PT. KOMIPO PEMBANGKITAN JAWA BALI __[Doc. Ret (P16-0951-02 Ly, PLTU TANJUNG JATI B UNIT 384 Form No KP18-0951-02-22-FMI6 Design OW. | nance and Administration TERM OF REFERENCE Revision No. | 00 b. Bearing and winding temperature measurement > record the data (ambient temperature also recorded) . Motor vibration (horizontal, vertical, and axial) on both sides with acceptance criteria based on ISO 10816-3:2009 > record the data d. RPM check and noise measurement >1 mtr from motor (refer to IEC 60034- 9 [83] or manual 4, Procurement Process 4.2. Reason of refurbish: a. There are 3 FA Conveying Air Compressor motor, 2 must running (1 compressor/each unit) and 1 standby. 24 hours continuous running. b. Condition of motor 1. FA Conveying Air Compressor A motor: more than 10 years running 2. FA Conveying Air Compressor B motor: more than 10 years running 3. FA Conveying Air Compressor C motor: new motor. There are no spare parts available in the warehouse, spare parts are needed as a backup in case of damage. T only 1 FA Conveying Air Compressor is running, then 1 of the units (unit 3 or 4) must be shutdown. 5. Delivery of material and/or services 5.1. Required date is 60 calendar days after PO date. 5.2. Delivery point is KPJB’s Warehouse, PLTU Tanjung Jati B Unit 384, Jepara, Central Java 6. Requirement of Documents Within delivery the materials, supplier should submit documents as follow: 6.1. Work report consist of: = Initial data and final data. = Electrical and mechanical test report. - Working process documentation. - Electrical & mechanical measurement must be reported as mentioned on the workscope including pictures of maintenance activities (before & after). 6.2. Warranty letter minimum 6 month (After Installed) or 1 year after goods received. 7. Technical Specification 7.1. All of technical specification should be comply with determined specification, cannot be changed, no crack, should be new 100%, genuine, no defect, and can be used properly. Term of Reference : PT. KOMIPO PEMBANGKITAN JAWA BALI [00c. Ret P18- 0951-02 hs PLTU TANSUNG JATI B UNIT 384 Form no. xPyB-0951-02-22-FN-T6 Desion OW France ana Adminawraton (i ‘TERM OF REFERENCE Revision no. |: 00 7.2. In the case PT KPJB decline the delivered material, supplier should replace the material. If supplier can’t replace it, they will be penalized in accordance to General Term & Condition (GTC) of the PO. 7.3. Ex-material after repair process have to bring back to PT. KPJB 8. Acceptance Criteria 8.1. Delivery time is complied 8.2. All delivered materials are accordance to PO requirement, specification and condition of the TOR. 8.3. All of required document are fulfilled Standard of Quality Quality of the material and/or services should comply with standard, code, manufacturer specification and user's requirement. 10. Warranty Generally, if there isn’t mentioned at other clause, supplier should warrant the material for 6 months after installation sof4 Term of Refers nce eS xe ih PT. KOMIPO PEMBANGKITAN JAWA BALI [Doc Aci | KPI6-0951-02 ty PLTU TANJUNG JATI B UNIT 384 Form No. KPI6-0951-02-22-FN-16 Ci: ‘TERM OF REFERENCE cevaanna boo 11, Material Technical Data Sheet Motor specification: a. Unit type 2 GA132 b. Serial number: WUX403250 ¢. Manufacture : Atlas Copco d. Made In : China e. Type YXLA 315M-4 f. Part Number + 1092091612 g. Voltage / phase: 380v h. Current 277/241 Amp i. Power 1 132kW j. RPM 1485 k. Frequency 50 Hz 1. Cos Q 0.88 m, Insulation Class: F n. Connection : Delta 0. Heater + 240V / 2x 80 Watt P. Bearing P.E : 6319 C3 q. Bearing O P.E 6319 C3 VLO241 INSOCOAT r. Grease Shell Alvania RL3 s. Protection 2 IPSS t RTD ~ bearing temperature sensor (DE & NDE Side) - winding temperature sensor (2 pcs/each phase). Name Plate [Prepared by Checked by ‘Approved by I A ye. Setya Prajoko Hen Staff Manager Date: 26/4 / 3.2 Date : Term of Reference He 4 of

You might also like