LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
KE 01 RUANG KELAS DIDAKTIK RC
H. AVG.
1102000021 1 AB M3 8.80 0.80 1.20 1.00 8.45 Z-2
GALIAN TANGAN DI TANAH YANG DISElidiki DI TEMPAT, BAGIAN WAJIB
A,B 1-2 8.30 0.80 1.20 2.00 15.94 Z-1
KEDALAMAN 0,00 SAMPAI 2,00 MTS. MELIPUTI : FINISHING Lereng,
HAULING LUAR DAN DALAM PEKERJAAN, TENAGA KERJA, PERALATAN, 2 AB 8.80 0.80 1.062 1.00 7.48 Z-2
SHOVELING, FINISHING DAN DRAINASE. TAMBAH 31.87 M3
AN
1102000051 PENGGALIAN TANGAN DI LAHAN YANG DIPELIHARA DI TEMPAT UNTUK M3 5.16 7.07 0.15 1.00 5.47 BANGKU
PELATIHAN DARI PLAZA KEWARGANEGARAAN, PENGADILAN 8.30 0.73 0.15 1.00 0.91 DALAM
OLAHRAGA DAN TAMBAH M3
6.38
PERPINDAHAN BANGUNAN, MELIPUTI: HAULING LUAR DAN DALAM AN
PEKERJAAN, PERALATAN DAN TENAGA KERJA.
TERJEMAHAN: Vo.Bo.:
ENG. FELIPE ALBERTO COLMENARES MERIDA PENGAWAS PEKERJAAN UMUM KOTA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PEKERJAAN UMUM KOTA
DIREKTORAT PEKERJAAN UMUM KOTA
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
ENG. FELIPE ALBERTO COLMENARES MERIDA PENGAWAS PEKERJAAN UMUM KOTA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PEKERJAAN UMUM KOTA
DIREKTORAT PEKERJAAN UMUM KOTA
PETUN LOKASI
KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
JUK SUMBU BAGIAN PRIA um
1212000031 (PAKU. 04) BAJA UNTUK TULANGAN PONDASI DENGAN BATANG NOMOR baja memanjang PANJANG. BAGIAN PCS PANJANG. LIHAT SKETSA
4,5,6, AL 12 F'Y=4200 KG/CM2. TERMASUK: PASOKAN DI SITUS, A,B 1-2 kg 8.29 2.00 4.00 66.32 CT1 DAN CT2
MEMBAWA KELUAR DAN DI DALAM DARI ITU 66.32
LOKASI KONSTRUKSI, DIAKTIFKAN,
PENEMPATAN, tambatan, KAIT, TAMPILAN, SALIB, batang 1/2". panjang. berat (kg/ml)
Semua
LIMBAH, LIPAT DI DALAM SETIAP 66.32 0.997 66.12
ELEMEN TAMBAH 66.12 kg
STRUKTURAL, ALAT DAN TENAGA KERJA. AN
1213000011 SHORING UNTUK FOUNDATION DENGAN PINE WOOD 3a. A,B 1-2 m2 7.40 0.15 4.00 4.44
MENYELESAIKAN
UMUM, CAKUPAN OLEH PERMUKAAN DARI KONTAK, 1,2 AB 8.41 0.15 4.00 5.05 SISI LUAR
TERMASUK:
ALAT, BAWA LUAR DAN DALAM 1 AB 8.30 0.35 2.00 5.81
BAHAN, PEKERJAAN,
TENAGA KERJA YANG BERKUALIFIKASI, Membungkuk 2 AB 8.30 0.35 2.00 5.81
DAN TAMBAH 21.11 m2
DIBUKA AN
121500030 (PAKU. 05) CASTLE ANCHOR DI PONDASI 14x21 CMS. 1,2 AB K-1 M 0.99 12.00 11.88 JENIS K=1
DENGAN BETON F'C=250 KG/CM2. BERSENJATA W/4 VAR. #4 DAN EST. TAMBAH 11.88 M
DARI # AN
2 AC 15 CM. PANJANG. TERMASUK: PASOKAN, DIAKTIFKAN, DIRAKIT,
Tumpang Tindih, KAIT DAN LIMBAH, SHORING UMUM, DENGAN
3a KAYU PINUS, SHORING, SHORING, PENGANGKUTAN LUAR DAN DALAM
PEKERJAAN, BAHAN, PERALATAN DAN TENAGA KERJA
1216000062 (PAKU. 07)SEKITAR DARI KONKRET F'C=250 KG/CM2 BAGIAN 2 AB M 8.24 1.00 8.24
RATA-RATA 15X20 CMS. DENGAN 5 VARS. DARI TIDAK. 3 DAN TEBU DARI
AB .1-2 M 0.98 2.00 1.96
1,40
M. DARI PANJANG NO. 2 @ 25 CMS. TERMASUK. ALAT, TANGAN TAMBAH 10.20 M
PEKERJAAN DAN PENGANGKUTAN DI LUAR DAN DI DALAM PEKERJAAN. AN
1217000052 dinding DARI TAUTAN DI DALAM DASAR KE 1-2 m2 7.80 1.000 1.00 7.80
DENGAN
BETON F'C=40 PARTISI
KG/CM2. DARI 15X20X40 CMS. DARI
DIDIRIKAN DENGAN UNTUK MENCAPAI
B. 1-2 7.80 1.111 1.00 8.67 MEREKA
MORTAR, SEMEN, PASIR, 1:5 DARI 15 CMS. KETEBALAN TERMASUK : 0.15 1.039 -3.00 -0.47 KURANG KASTIL
BAHAN, KERETA KERJA LUAR DAN DALAM, PLUMBING, ALAT DAN
0.15 1.620 -3.00 -0.73 KURANG KASTIL
TENAGA KERJA.
TAMBAH 15.27 m2
AN
CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
ENG. FELIPE ALBERTO COLMENARES MERIDA PENGAWAS PEKERJAAN UMUM KOTA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PEKERJAAN UMUM KOTA
TERJEMAH
AN: Vo.Bo.:
DIREKTORAT PEKERJAAN UMUM KOTA
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
K-TIPE
1220000216 A,B 1-2 k M 0.78 8.00 6.24
TAMBAH 6.24 M
(PAKU. 08) CASTLE ANCHOR PADA PONDASI 14X15CM DENGAN BETON AN
F'C=250KG/CM2, DIPERKUAT DENGAN 4 VAR. #4 DAN STIRRUGS #2 A/C
15CM., TERMASUK: SUPPLY, ENABLED, ASSEMBLY, OVERLAPS, HOOKS
DAN LIMBAH, SHORING DENGAN 3rd PINE WOOD, SHORING, SHORING,
MATERIALS, HAULING LUAR DAN DALAM PEKERJAAN, ALAT DAN TENAGA
KERJA.
A0103
1302000011 STRUKTUR GENDANG
1,2 AB m2 7.81 0.60 0.59 4.00 11.06
PENDENGAR
SHORING UNTUK DINDING DAN KOLOM TIDAK TERLIHAT DENGAN KAYU 0.25 0.40 -2.00 -0.20
PINUS 3a. (TYMPANO) MELIPUTI: PEMBENTUKAN, UNFORMING, ENABLED, TAMBAH 10.86 AREA KURANG
ENG. FELIPE ALBERTO COLMENARES MERIDA PENGAWAS PEKERJAAN UMUM KOTA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PEKERJAAN UMUM KOTA
TERJEMAHAN: Vo.Bo.: .
DIREKTORAT PEKERJAAN UMUM KOTA
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
PANJAN
1303000092 lintas baja BAGIAN PCS PANJANG. KUNCI T=1
(PAKU. 09) BAJA TULANGAN PADA STRUKTUR DENGAN BATANG KABEL G.
F'Y=2400 KG/CM2. TERMASUK: ALAT, TENAGA KERJA, KERETA 1,2 AB kg 1.00 2.00 45.00 90.00
DI LUAR DAN DI DALAM KERJA, JUMLAH., DIAKTIFKAN, BERSENJATA, 90.00
Tumpang Tindih, KAIT, SADDLES DAN LIMBAH. panjang. berat (kg/ml)
Semua
90.00 0.251 TAMBAH 22.59 kg
AN
baja memanjang
A,B 1-2 Anda 6.50 2.00 2.00 26.00
yo
M
3.85 2.00 2.00 15.40
P 1.02 2.00 2.00 4.08
SEB
8.10 2.00 2.00 32.40
UAH
SALA
lintas baja H SATU
panjang. Rata-rata
A,B 1-2 1.50 4.00 20.00 120.00 =( 4.0 / 0.20 ) + 1 =
baja memanjang
1-2 AB 7.10 1.00 2.00 14.20 tambahan
lintas baja
1-2 AB
<‘ 1.40 2.00 38.00 106.40 =(5.2/0.2)+8+1=35
875.28
panjang. berat (kg/ml)
Semua
875.28 0.566 495.41
TAMBAH 495.41 kg
AN
TERJEMA Vo.Bo.:
HAN:
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
baja memanjang
(PAKU. 011) BAJA TULANGAN PADA STRUKTUR DIAM. # 4,5,6 SAMPAI 12 1-2 AB 7.09 1.00 2.00 14.18 KUNCI T=2
F'Y=4200 KG/CM2. TERMASUK: PERALATAN, TENAGA KERJA, KERETA DI panjang.
batang 1/2". berat (kg/ml) 105.47
LUAR DAN DI DALAM SITUS, SUPPLY, ENABLED, ASSEMBLY, OVERLAPS, Semua
HOOKS, SADDLES DAN LIMBAH. 105.47 0.997 105.15
baja memanjang
poros tengah 7.09 1.00 3.00 21.27 KUNCI T=2
21.27
batang 5/8". panjang. berat (kg/ml)
Semua
21.27 1.566 33.31
TAMBAH 138.46 kg
AN
A0104
1 AB m2 3.90 1.52 1.00 5.93
1403000092
BENGKEL PANDAI BESI 2 AB 2.90 1.52 1.00 4.41
TAMBAH 10.34 m2
AN
(PAKU. 013) PENYEDIAAN DAN PENEMPATAN WINDOW PROTECTION
BERDASARKAN 1" X 1" GREEN RECTANGULAR TUBULAR PROFILE (PTR),
FRAME PEMBENTUK DAN STRUKTUR PERSEGI 1/2" PADA SETIAP 14 CMS.
PEMISAHAN DALAM BENTUK HORIZONTAL, TERMASUK: 4 PLUG
EKSPANSI 2" DENGAN 3'' STUDS, SILIKON TRANSPARAN, PRIMARY BASE,
WHITE ALKIDAL ENAMEL CAT, WELDING E-6013, ALAT, TENAGA KERJA,
TERJEMA KERETA DI DALAM DAN DI LUAR PEKERJAAN DAN SEGALA SESUATU Vo.Bo.:
HAN: YANG DIPERLUKAN UNTUK EKSEKUSINYA YANG BENAR.
A0105 BATU
1503000821
(PUA. 014) RANTAI BETON ATAU CASTLE F'C=250 KG/CM2 14X15 CMS. 1 AB CC4 ML 4.26 1.00 4.26 JENIS CC-4
DILENGKAPI DENGAN 4 VARS. TIDAK. 3, F'Y=4200 KG/CM2 EST. TIDAK. 2 2 AB 3.27 1.00 3.27
@ 20 CMS. TERMASUK: ALAT, TENAGA KERJA, KERETA LUAR TAMBAH 7.53 ML
DAN DI DALAM KERJA, SHORING UMUM, PERLINDUNGAN BATANG, AN
BERGETAR, CAST, SEMBUH.
1505000063
(PUA. 016) RANTAI BETON F'C=250 KG/CM2. DARI 21X10 CMS. TANPA 1, 2 AB ML 2.20 4.00 8.80
PENGUATAN (ZOCLO) TERMASUK: SHORING YANG SEBENARNYA DAN TAMBAH 8.80 ML
UNSHORING, AN
PERALATAN, TENAGA KERJA DAN PENGANGKUTAN LUAR DAN DALAM
PEKERJAAN.
1505000096
(PUA. 018) RANTAI BETON ATAU CASTLE F'C=250 KG/CM2 14X15 CMS. A,B 1-2 k ML 2.50 6.00 15.00 K-TIPE
DILENGKAPI DENGAN 4 VARS. TIDAK. 4, F'Y=4200 KG/CM2 EST. TIDAK. 2 TAMBAH 15.00 ML
AN
@ 15 CMS. TERMASUK: ALAT, TENAGA KERJA, KERETA LUAR
DAN DALAM PEKERJAAN, COMMON SHORING, SHORING DAN CROSSING
OF RODS.
1505000097 (PUA. 019) CASTLE RANTAI ATAU BETON, F'C= 250 KG/CM2. DARI A,B 1-2 arus ML 7.79 2.00 15.58 JENIS CD-1
14X30 CMS, DIRAKIT DENGAN 4 BATANG No. 4 DAN STIRRUGS No. 2 @ 25 searah TAMBAH 15.58 ML
CMS DENGAN SHORING KAYU PINUS KE-3. TERMASUK: DIAKTIFKAN, AN
DIPERSINGKATKAN, TIDAK DIPERPANJANG, ALAT, TENAGA KERJA
DAN
TERJEMAHAN: Vo.Bo.:
.
TIPE K-1
1505000210
1, 2 AB K-1 ML 2.49 8.00 19.92
(PAKU. 020) RANTAI ATAU KASTIL DARI KONKRET F'C=250
KG/CM2.14X21CMS. LENGAN. W/4 VAR. TIDAK. 4 st. #2 @ 15 CMS. 2.60 4.00 10.40
JENIS CC-5
TERMASUK.: SHORING UMUM, DIBUKA, PERSIMPANGAN 1,2 AB 1.487 4.00 5.95
DARI BATANG, TAMBAH ML
36.27
PERALATAN, TENAGA KERJA DAN PENGANGKUTAN DI LUAR DAN DI AN
DALAM PEKERJAAN.
DI BAWAH JENDELA
1 AB m2 3.90 0.73 1.00 2.85
DI BAWAH JENDELA
1503000285 2 AB 2.90 0.73 1.00 2.12
DINDING 14 cm. ENG. TABICON BETON 10x14x28Cm. F'c=40 Kg/Cm2. COCOK DI DINDING
7.317 2.30 2.00 33.66
SETTING DENGAN CEM-SAND MORTAR 1:3. SELESAI UMUM. HINGGA m2
TINGGI 0 SAMPAI 3M. TERMASUK: PENGANGKUTAN SAMPAI 20 MTS. TAMBAH 38.63
AN
SAMPAH, KEBERSIHAN, BAHAN, PERANCAH, PERALATAN KERJA, ALAT A,B 1-2
DAN SEMUA YANG DIPERLUKAN UNTUK PELAKSANAANNYA YANG
BENAR.
POS JENDELA
A0106 PEMBATALAN
1 AB m2 3.90 1.520 1.00 5.93 JENDELA DEPAN
1601000042
(PUA. 021) PENYEDIAAN DAN PENEMPATAN GERBANG 2 AB 2.90 1.520 1.00 4.41 m2
TAMBAH 10.34
DARI AN
NATURAL ALUMINIUM COMMERCIAL TYPE 2" DENGAN TETAP DAN
SLIDING, BERDASARKAN PROYEK, TERMASUK:
AKSESORIS,
ALAT, TENAGA KERJA, PENGANGKUTAN DI LUAR DAN DI DALAM
1 AB PZA 1.00 1.00
PEKERJAAN. PZA
TAMBAH 1.00
AN
1603000046
(PAKU. 022) PENYEDIAAN DAN PENEMPATAN PINTU DENGAN RANGKA
UNIVERSAL DAN RANGKA COUNTER (NATURAL ANONIZED) SEBESAR
0,92 X 2,44 OLEH 0,032 MTS. DIBENTUK DENGAN DUA LEMBAR LEMBAR Vo.Bo.:
KAPUR HITAM. 26, TERPISAH OLEH INTI BUSA POLIURETAN, MENURUT .
PROYEK, No. RENCANA: 4 - 3688 - 7, TERMASUK ENGSEL, ALAT, TENAGA
KERJA, PENGANGKUTAN LUAR DAN DALAM PEKERJAAN ENG. SIXTO zquez monzon
TERJEMAHAN: MANAJER D. KOTA S
VA DAN
CETAK BIRU: TERMASUK
DIREKTORAT PEKERJAAN UMUM KOTA KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
LOKASI
KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PERHITUNG
PCS HASIL Amati
BEJUCAL DE OCAMPO, CHIAPAS SUMBU BAGIAN PRIA um AN:
1707000010
SUPLAI DAN PENEMPATAN LUMINAIR FLUORESCENT 2 X 32 WAT, LIHAT SKETSA
SUPLAI DENGAN KABINET 1,22 X 0,30 MTS, LAMPU HEMAT ENERGI
MOD. T-8 BASSE G13., 1-2 AB PZA 5.00 5.00
PZA
PENGAPIAN INSTAN, 127 V/60 HZ, 410 K, COOL WHITE, 5900 LM, TAMBAH 5.00
DIFFUSER AKRILIK DAN MOD BALLAST ELEKTRONIK. QTP 2 X 32 T8/127 AN
ISN-D QUICKTRONIC LINE, MCA. OSRAM ATAU SERUPA DALAM
KUALITAS, EFISIENSI DAN BIAYA. TERMASUK: BAHAN UNTUK
MEMPERBAIKINYA, INSULATION TAPE, SCAFFOLDING, PENGUJIAN,
PERALATAN, TENAGA KERJA, HAULING LUAR DAN DALAM PEKERJAAN,
SEMUA YANG DIPERLUKAN UNTUK OPERASI YANG TEPAT.
1702000420
SUPLAI DAN PENEMPATAN THERMAL MAGNETIC SWITCH 1 POLE 15
KE 1-2 PZA 3.00 3.00
SAMPAI 50 AMPS. JENIS QO MEREK KOTAK. MELIPUTI : ALAT, TENAGA PZA
TAMBAH 3.00
KERJA, PENGANGKUTAN LUAR DAN DALAM KERJA, KONEKSI DAN AN
PENGUJIAN.
1703000455
OUTLET UNTUK KIPAS CEILING DI KOTAK LAMINA
PIPA GALVANIS DAN CONDUIT BERAT PVC 13 MM 1-2 AB GARA 2.00 2.00
DIAMETER, TERMASUK:PIPA, KONEKSI, KOTAK, ATAS, M GARAM
TAMBAH 2.00
PERALATAN, SCAFFOLDING, TENAGA KERJA, HAULING DI DALAM DAN DI AN
LUAR SITUS.
1705000020
OUTLET PUSAT DALAM KOTAK LEMBAR GALVANIZED DENGAN TABUNG
CONDUIT PVC BERAT, TERMASUK: CONNECTORS, COUPLINGS, 1-2 AB GARA 5.00 5.00
M GARAM
GALVANIZED SHADOW, KABEL (MCA. KONDUMEX, TAMBAH 5.00
DRIVER AN
MONTERREI, LATINCASA, CONDELMEX, CONELEC), CHASIS
DAN Vo.Bo.:
DIPRODUKSI :
COVER ALUMINIUM 1 SAMPAI 3 JENDELA, KERETA KERJA LUAR DAN .
DALAM, PENGUJIAN, KONEKSI, TENAGA KERJA DAN ENGINEERING.
FELIPEHEALRBREARMTIEONCTOAL, MAPEANGAARDEOSRMEESR.IDA PENGAWAS ENG. SIXTO zquez monzon
PEKERJAAN UMUM KOTA MANAJER D. KOTA S
VA DAN
CETAK BIRU: TERMASUK
DIREKTORAT PEKERJAAN UMUM KOTA KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSEP KONSEP LOKASI
KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D
LOKASI
PETUNJUK PANJANG LUAS TINGGI PERHITUNG
PCS HASIL Amati
BEJUCAL DE OCAMPO, CHIAPAS SUMBU BAGIAN PRIA um AN:
A0108 SELESAI
1901000011 A,B 1-2 m2 7.79 5.85 1.00 45.57 AREA LOUNGE
(PAKU. 024) LANTAI CONC. F'C = 150KG/CM2 DARI 10 CM. ENG. 8.80 1.15 1.00 10.12 TROTOAR
MENYELESAIKAN
DIPOLES ATAU TERGOR DENGAN SIKAT RAMBUT, LEMBAR 3,06 X 2,00 TAMBAH 55.69 m2
MTS., COLD JOINTS SELESAI DENGAN TURNER; MELIPUTI: HAULING AN
PEKERJAAN LUAR DAN DALAM, CASTING, SHORING DAN SHORING
DENGAN KAYU PINUS PIHAK KETIGA, TENAGA KERJA, PERALATAN,
MIXER, BERSIHKAN DENGAN SIKAT, SABUN DAN AIR.
TERJEMA Vo.Bo.:
HAN: ENG. .
PENGAWASAN DAN ALBERTO COLMENARES MERIDA KOTA ZQUEZ
ENG. SIXTO
PHILIP ATAU PEKERJAAN UMUM KOTA MANAJER D. MONZON S
VA DAN
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
BEJUCAL DE OCAMPO, CHIAPAS KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D PERHITUNG
AN:
NOMOR GENERATOR LOKASI: LINGKUNGAN EL MOLINO TANGGAL: FEBRUARI 2012
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
Vo.Bo.:
TERJEMAHAN:
.
ENG. FELIPE ALBERTO COLMENARES MERIDA
zquez monzon
PENGAWAS PEKERJAAN UMUM KOTA KOTA S
ENG. SIXTO
MANAJER D.
VA DAN
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
HIDUNG TERPASANG DI BENCH; TERMASUK: SHORING SESUNGGUHNYA TAMBAH 10.95 ML
DENGAN TRIPLAY PINE 16MM. DAN KAYU PIHAK KETIGA, CHAMFERS, AN
TURNING, FORMING, DESIMBRATING, CARRIAGE LUAR DAN DALAM
PEKERJAAN, PERALATAN DAN TENAGA KERJA.
1903000064 PENYEDIAAN DAN PENEMPATAN KACA FLOAT BENING 6 MM. 1 AB m2 3.90 1.52 1.00 5.93 LIHAT SKETSA
DI TETAP; TERMASUK: CHEW, RUGHS, CUTS, CLEANING, 2 AB 2.90 1.52 1.00 4.41
PERALATAN, TENAGA KERJA DAN PENGANGKUTAN LUAR DAN DALAM TAMBAH 10.34 m2
PEKERJAAN. AN
2101000071 A,B 1-2 m2 7.79 3.06 4.00 95.35 rata-rata alt = (2,71+3.
(PAKU. 027) DINDING DATAR DENGAN MORTAR SEMEN-KAPUR- area kerja yang lebih
0.30 0.40 -4.00 -0.48 sedikit
PASIR 1:2:6 PLUMBED DAN PENGUASA, SPONGED FINISH; TERMASUK: atap
GUTTING, FINISHING, RUSTIC FORGING, PERSIAPAN PERMUKAAN, 1, 2 AB 0.81 2.40 8.00 15.55 = (1.07+0.53)/2 = 0
SCAFFOLDING, PEKERJAAN (6.01 SAMPAI 12.00 M DE
0.21 2.40 4.00 2.02 NOZZLE
HEIGHT) DAN SEMUA YANG DIPERLUKAN UNTUK EKSEKUSI YANG BENAR
DINDING 20 CM
1, 2 AB 1.05 2.40 8.00 20.16
DI BAWAH JENDELA
1 AB 3.90 0.80 2.00 6.24
0.07 0.88 2.00 0.12
3.90 0.15 1.00 0.59 JUAL NOZZLE
PENGAWASAN E M A U L B T E IP R A T N O E C L; O I L N M C E L N U A Y RE : IS DO M E R U ID Ñ A
S ENG. SIXTO
MANAJER D. MONZON S
PHILIP YANG BERTINDAK SEBAGAI KNOCK UNTUK PEKERJAAN UMUM KOTA VA DAN
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
DENGAN PENUTUPAN SHOCK, PICK, TOOL, TENAGA KERJA DAN
PENGANGKUTAN LUAR DAN DALAM KERJA.
PZA
Pensinyalan A010A
PZA 1.00 1.00
2901000111
TAMBAH 1.00
(PAKU. 028) PENYEDIAAN DAN PENEMPATAN TANDA LOKASI 0,60 X 0,60 AN
MTS PADA GENTENG KERAMIK ULIR DAN CAT SESUAI DESAIN RESMI H.
BALAI KOTA, MELIPUTI: PENEMPATAN BENDA BERDASARKAN SUDUT
ALUMINIUM 1/2" YANG LEBIH BAWAH YANG DIKATAKAN KE DINDING
DENGAN JANGKAR DAN SEKRUP, LEM "TIDAK ADA LAGI PAKU" DAN
SILIKON PUTIH PADA PERIMETER UBIN, BAHAN, TENAGA KERJA ,
PERALATAN, KERETA DI DALAM DAN DI LUAR PEKERJAAN, LIMBAH DAN
SEMUA YANG DIPERLUKAN UNTUK PELAKSANAANNYA YANG BENAR.
2960000046
PZA
PZA 1.00 1.00
(PAKU. 029) TANDA BAS-RELIEF 1,71 X 0,52 MTS DENGAN LEGENDA TAMBAH 1.00
AN
"CHIAPAS UNIT US" PADA DINDING KEPALA; MENURUT PROYEK,
TERMASUK: CETAKAN UNICEL, SCAFFOLDING DI TINGGI BERAPA PUN,
CAT (DENGAN PERLINDUNGAN
UV) DOYAN,
FINE SPONGE FLAT, PEMBERSIH, ALAT, TENAGA KERJA DAN BAWAAN
DALAM DAN LUAR SITUS.
Vo.Bo.:
.
TERJEMAHAN:
zquez monzon
KOTA S
DIREKTORAT PEKERJAAN UMUM KOTA
ENG. SIXTO
MANAJER D.
VA DAN
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA “MARIANO MATAMOROS”, KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
2501000143 PZA 2.00 2.00
TAMBAH 2.00 PZA
PENYEDIAAN DAN PENEMPATAN TANDA INFORMASI 30X30CM. PLASTIK AN
DAN VINIL, MELIPUTI: MEMPERBAIKI BAHAN, PERALATAN DAN TENAGA
KERJA, KERETA DI DALAM DAN DI LUAR PEKERJAAN DAN SEMUA YANG
DIPERLUKAN UNTUK PELAKSANAANNYA YANG BENAR.
3112000383
(PAKU. 031) (M10600041) PENEMPATAN MEJA UNTUK MASTER 1200 x 600 PZA 1.00 1.00
PZA
x 750 mm YANG DISEDIAKAN OLEH KONTRAKTOR. TERMASUK : Bongkar TAMBAH 1.00
Muat, CARRIAGE DI DALAM KERJA. AN
313000004
(PAKU. 032) (M10400126) PENEMPATAN KURSI YANG DAPAT PZA 1.00 1.00
DITUMPUK PZA
TAMBAH 1.00
PLASTIK, DIPASOK OLEH DIA KONTRAKTOR, AN
TERMASUK:
UNLOADING, CARRIAGE DI DALAM KERJA.
Vo.Bo.:
.
TERJEMAHAN: PZA 40.00 40.00
313000005
ENG. FELIPE(PAULAB.ER0T3O3) C(OML1M0E60N0A0R1E7)S MCEORLIODCAATION DIREKTUR ING 4 . 0 S .0 I 0 zquez monzon
SUM D KOTA S
KURSI PALET XTO VA E
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA "MARIANO MATAMOROS", KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
, ,
UNLOADING, CARRIAGE DI DALAM KERJA
PEKERJAAN LUAR
1719000010 (PUA. 023) REG. DARI TAB. BAGIAN MERAH UMUM 60X60X80 CMS.
PZA 1.00 1.00
DENGAN SP. DARI 13 CMS. SEBUAH RENCANA. INT. C / KEMATIAN. AC.
1:5, AHAB. DIPOLES DENGAN PENUTUP LOGAM DARI LEMBAR HALUS TAMBAH 1.00
AN
CAL. 18, TERMASUK.:ENGSEL,FRAME
1"X1"X1/8" ANGLE, COUNTER-FRAME DENGAN SUDUT 1 1/4 X 1 1/4" X 1/8",
ROD No. 4 BERJANGKAR KE RANTAI YANG DITUTUP DENGAN POLYDUCT
ORANGE UNTUK MENAHAN KONDUKTOR, JENIS Klem
OMEGA, RANTAI BETON F'C=150 KG/CM2 SECC 15X15 CMS, DIKUAT
DENGAN 3 VARS No. 3, EST. TIDAK. 2 @ 20 CMS PENGIKAT PENUTUP
LOGAM KE RANTAI DENGAN 4 JANGKAR, SHORING DAN SHORING
DENGAN MAD. PINE DARI 3a. NOZZLE, 3/4" GRAVEL BOTTOM, CAT
(DENGAN U. V.) ANTIKOROSIF, ALAT, TENAGA KERJA DAN
PENGANGKUTAN DI LUAR DAN DI DALAM PEKERJAAN.
Vo.Bo.:
TERJEMAHAN: .
zquez monzon
DIREKTORAT PEKERJAAN UMUM KOTA
ENG. SIXTO
MANAJER D.
VA DAN
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA "MARIANO MATAMOROS", KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
1704000040 SUPPLYING DAN LAYING PIPA CONDUIT PVC BERAT 32 LOKASI PZA 10 10 10
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
mm DIAMETER; TERMASUK: PENGANGKUTAN, BAHAN SUMBU BAGIAN PRIA um TAMBAH 10 PZA
UNTUK ANDA
MEMPERBAIKI DAN DUKUNGAN, PERANCAH, ALAT KECIL, TANGAN AN
TERJEMA Vo.Bo.:
HAN: .
1712000070 ML 40.00 40.00
E SU ALMBINE IR STORO CO
Y LM CO IN LO A CREA SCIMO EN RD ID E A
CABLE VINANEL XXI KOTA ZQUEZ
ENG. DIREKTUR ING 4 . 0 S .0 I 0
THW-LS/THHW- ATAU PEKERJAAN UMUM KOTA SUM D MONZON S
PENGAWASAN XTO VA E
DIREKTORAT PEKERJAAN UMUM KOTA CETAK BIRU: TERMASUK
LOKASI KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SD PEDESAAN
KONSTRUKSI: NEGARA "MARIANO MATAMOROS", KUNCI: 07EPR0374D PERHITUNG
BEJUCAL DE OCAMPO, CHIAPAS AN:
LOKASI
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL Amati
SUMBU BAGIAN PRIA um
LS, 600 VOL, 12 GAUGE MEREK CONDUMEX, LATINCASA, CONDUCTORES
MONTERREY, IUSA; TERMASUK: CARRYING, LAYING, INSULASI TAPE,
LUBRICATION, GUIDES, POINT INSULATION, CONNECTIONS,
SCAFFOLDING, MINOR ALAT, TENAGA KERJA DAN SEMUA YANG
DIPERLUKAN UNTUK EKSEKUSI YANG BENAR.
TERJEMA Vo.Bo.:
HAN: .
ENG. FILIP DAN ALBERTO COLMENARES MERIDA ENG. SIXTO zquez monzon
MENGAW ATAU PEKERJAAN UMUM KOTA MANAJER D. KOTA S
VA DAN
DIREKTORAT PEKERJAAN UMUM KOTA
LOKASI Amati
PETUNJUK KONSEP PANJANG LUAS TINGGI PCS HASIL
SUMBU BAGIAN PRIA um
TERJEMAHAN: Vo.Bo.: .
DIREKTORAT PEKERJAAN UMUM KOTA
TINDAKA
N
LAMPIRA
N
KELA
S
KELA
S
TERJEMAH Vo.Bo.: .
AN:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
LAMPIRA
N
MBRON
MBRON
Memukul
= 29 BUAH
TERJEMAH Vo.Bo.: .
AN:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
LAMPIRA
N
AT
AU
TINGKAT PROYEK
SK
SK
TERJEMAH Vo.Bo.: .
AN:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
LAMPIRA
N
S K-1
S K-1
GAMER T-2
LAMPIRAN
LATERAL
DEPAN DEPAN
GENDANG
PENDENGAR
NA-TRABE
TERJEMAHAN: Vo.Bo.: .
EXO
34 BUAH
20
TERJEMAHAN: Vo.Bo.: .
EXO
5.10
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
NOL
cheta
RIOR
KE
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
LAMPIRA
N
TERJEMAH Vo.Bo.: .
AN:
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
dan
T-2
.81
NA
0,09 DI K-2
gendang
telinga
GAMER T-2
GAMPER T-
1
TERJEMAHAN: Vo.Bo.: .
LAMPIRAN
41)/2 = 3.06
dan T-2
.80
NA
0,09 DI K-2
RTA
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
TINDAKA
N
TERJEMAHAN: Vo.Bo.: .
ENG. FELIPE ALBERTO COLMENARES MERIDA ENG. SIXTO VAZQUEZ MONZON DIREKTUR
PENGAWAS PEKERJAAN UMUM KOTA PEKERJAAN UMUM KOTA
DANA INFRASTRUKTUR SOSIAL KOTA TAHUN 2013
ANGGARAN PEKERJAAN DAN/ATAU PROYEK
PENDAHULUAN JUMLAH
SUBTOTAL $ 16,494.57
TERAKUMULASI $
16,494.57
SUBTOTAL $ 22,373.16
TERAKUMULASI $
FOUNDATION JUMLAH
$ 47,806.37
SUBTOTAL $ 25,433.21
TERAKUMULASI $
64,300.94
TERJEMAHAN: Anda.
Bo.
A0103 STRUKTUR
1303000093 (PAKU. 010) BAJA TULANGAN PADA STRUKTUR DIAM.#3 kg 495.4100 $ 24.10 $ 11,939.38
F'Y=4200 KG/CM2 TERMASUK: ALAT, TENAGA KERJA, KERETA
DI LUAR DAN DI DALAM PEKERJAAN, SUPPLY, ENABLED,
ASSEMBLY, OVERLAPS, HOOKS, SADDLES DAN LIMBAH.
SUBTOTAL $ 70,163.55
Akumulasi $ 134,464.49
PERSIMPANGAN
BATANG, BERGETAR, CAST, SEMBUH.
SUBTOTAL $ 25,993.29
TERAKUMULASI $ 160,457.78
TERJEMAHAN: Anda.
Bo.
ENG. SIXTO VAZQUEZ MONZON C. ELIDIO DE LEON MORALES
DIREKTUR PEKERJAAN UMUM KOTA PRESIDEN KOTA KONSTITUSI
DANA INFRASTRUKTUR SOSIAL KOTA TAHUN 2013
ANGGARAN PEKERJAAN DAN/ATAU PROYEK
KOTA: BEJUCAL DE OCAMPO, CHIAPAS
LOKASI: LINGKUNGAN EL MOLINO
PROGRAM: SJ.- INFRASTRUKTUR PENDIDIKAN DASAR
SUBPROGRAM: 01) KONSTRUKSI 02) UTAMA
KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SEKOLAH DASAR
NEGARA “MARIANO MATAMOROS”, KUNCI:
PEKERJAAN ATAU PROYEK: 07EPR0374D
TANGGAL : MARET 2013
2960000046 QTP 2 X 32 T8/127 ISN-D QUICKTRONIC LINE, MCA. OSRAM PZA 5.0000 $ 1,271.10 $ 6,355.50
ATAU SERUPA DALAM KUALITAS, EFISIENSI DAN BIAYA.
TERMASUK: BAHAN UNTUK MEMPERBAIKINYA, INSULATION
TAPE, SCAFFOLDING, PENGUJIAN, PERALATAN, TENAGA
KERJA, HAULING LUAR DAN DALAM PEKERJAAN, SEMUA YANG
DIPERLUKAN UNTUK OPERASI YANG TEPAT.
SUBTOTAL $ 10,231.67
TERAKUMULASI $ 222,450.65
A0108 SELESAI
SUBTOTAL $ 19,615.25
TERAKUMULASI $ 242,065.90
SUBTOTAL $
28,420.89
TERAKUMULASI
$ 270,486.79
DANA INFRASTRUKTUR SOSIAL KOTA TAHUN 2013
ANGGARAN PEKERJAAN DAN/ATAU PROYEK
KOTA: BEJUCAL DE OCAMPO, CHIAPAS
LOKASI: LINGKUNGAN EL MOLINO
PROGRAM: SJ.- INFRASTRUKTUR PENDIDIKAN DASAR
SUBPROGRAM: 01) KONSTRUKSI 02) UTAMA
KONSTRUKSI RUANG KELAS. RC 6X8 MTS. DI SEKOLAH DASAR
NEGARA “MARIANO MATAMOROS”, KUNCI:
PEKERJAAN ATAU PROYEK: 07EPR0374D
TANGGAL : MARET 2013
SELESAI TOTAL
A0109 $ 80,828.05
TUKANG KUNCI
2120000031
PENYEDIAAN DAN PENEMPATAN SHEET PHILLIPS MOD.825
SOLID STEEL LOCK YANG BERAKTUASI DENGAN KUNCI DI
KEDUA SISI ATAU KUALITAS DAN BIAYA YANG SAMA UNTUK
PINTU ALUMINIUM DAN/ATAU MULTI-PANEL; TERMASUK: DUA PZA 1.0000 $ 257.95 $ 257.95
Klem YANG BERTINDAK SEBAGAI KUNCI DENGAN SNAP,
PILIHAN, ALAT, TANGAN DARI BEKERJA
DAN
HAULING LUAR DAN DALAM PEKERJAAN.
$ 257.95
TOTAL LOCKSMITH
SINYAL
A010A
SUBTOTAL $ 42,254.12
TERAKUMULASI $ 312,740.91
SUBTOTAL $ 1,019.24
TERAKUMULASI $ 313,760.15
3130000004 PLASTIK, DIBERIKAN OLEH KONTRAKTOR, TERMASUK: Bongkar PZA 1.0000 $ 477.75 $ 477.75
Muatan, PENGANGKUTAN DALAM PEKERJAAN.
SUBTOTAL $ 38,939.96
TERAKUMULASI $ 352,700.11
SUBTOTAL: $ 3,542.23
Akumulasi: $ 356,242.34
SUBTOTAL: $ 1,487.67
Akumulasi: $ 357,730.01
SERTIFIKASI 2%.SEBELUM INIFECH: $ 7,154.60
PPN 16%: $ 57,236.80
JUMLAH TOTALUNTUK KONTRAK:$ 414,966.81
TOTAL JUMLAH PROYEK: $ 422,121.41
TERJEMAHAN: Anda.
Bo.
PERSIAPAN $16,494.57
DASAR $47,806.37
STRUKTUR $70,163.55
PEMBATALAN $18,573.66
SELESAI $80,828.05
SINYAL $5,724.63
SUBTOTAL $ 357,730.01
PPN 16%. $ 57,236.80
JUMLAH TOTAL UNTUK KONTRAK $ 414,966.81
SERTIFIKASI 2% SEBELUM INIFECH. $ 7,154.60
JUMLAH TOTAL PROYEK $ 422,121.41
TERJEMAHAN: Anda.
Bo.
LINGKUNGAN EL
MOLINO BEJUCAL DE OCAMPO, CHIAPAS
Tanggal Mulai: 25 APRIL 2013
Tanggal Berakhir: 25 JULI 2013
Jangka waktu pelaksanaan: 93 HARI KALENDER